News Feed

Asara Resources Limited
Asara Resources Limited
AS1
Gold
Guinea

AS1: Asara signs binding term sheet to acquire Siguiri Gold Corp

Asara Resources Limited has signed a binding term sheet to acquire Siguiri Gold Corp., which holds gold exploration permits in the Siguiri Basin, Guinea. The acquisition, valued at up to A$50 million in shares, is structured with significant contingent payments tied to license renewals and JORC resource milestones, mitigating upfront risk. This strategic move expands Asara's land holding near its existing Kada Gold Project and AngloGold Ashanti's Siguiri mine, offering potential for resource growth and development synergies. The company also provided an updated JORC 2012 Mineral Resource Estimate for its Kada Gold Project, totaling 92.88 Mt at 0.70 g/t gold for 2.08 Moz.

View story
PDI Gold Limited
PDI Gold Limited
PDI
Gold
Guinea

PDI: Bankan and Mansounia Exploitation Permits Granted

PDI Gold has been granted exploitation permits by the Government of Guinea for the Bankan Project and the Mansounia deposit at the Kiniéro Gold Mine. These permits represent the final key regulatory approvals needed to commence construction at Bankan and begin mining at Mansounia.

View story
Asara Resources
Asara Resources
AS1
Gold
Guinea
Drill Results

Maiden drilling at Sogosogoba intersects 38m @ 2.1g/t

Asara Resources has announced maiden drilling results at the Sogosogoba project, intersecting 38 metres at 2.1 g/t gold. This represents new exploration activity for the company in the Siguiri Basin of Guinea.

View story
Galiano Gold Inc.
Galiano Gold Inc.
GAU
Gold
West Africa

Galiano Gold Reports Third Quarter 2026 Results

Galiano Gold reported strong third-quarter 2026 operating and financial results, with gold production increasing 19% quarter-over-quarter to 40,922 ounces and all-in sustaining costs decreasing by 5% to $2,346 per ounce. The company generated $57.0 million in operating cash flow and secured long-term extensions for key mining leases in Ghana. Exploration activities, including resource definition drilling at Esaase and underground expansion drilling at Abore, progressed as planned, with updated mineral reserves and resources expected in Q1 2027.

View story
DeSoto Resources Limited
DeSoto Resources Limited
DES
Gold
Guinea

DES: Gold Anomalies Guide Follow-up Exploration

DeSoto Resources Limited is actively advancing regional exploration across its extensive Siguiri portfolio in Guinea, with ongoing soil sampling and power auger drilling. The company has reported historical Bulk Leach Extractable Gold (BLEG) sampling results from 2025/2026, which identified gold anomalies ranging from 6.62 ppb to 56.20 ppb Au, providing targets for follow-up exploration. Assays from the current auger drilling program are pending, and no new drill intercepts are presented in this update.

View story
PDI Gold Limited
PDI Gold Limited
PDI
Unknown
West Africa

PDI: Quarterly Activities/Appendix 5B Cash Flow Report

PDI Gold Limited reported strong financial performance for the September 2026 quarter, with cash and bullion increasing to US$405M and group gold sales up 37% to 66,928oz Au. Operationally, Kiniéro performed well, pouring 45,599oz Au with 88.3% recovery, while Nampala saw lower production of 7,266oz Au and increased All-in Sustaining Costs. The company also advanced pre-development activities at its Bankan Gold Project, with detailed engineering 20% complete.

View story
DeSoto Resources Limited
DeSoto Resources Limited
DES
Gold
Guinea

DES: Quarterly Activities/Appendix 5B Cash Flow Report

DeSoto Resources has recommenced drilling at the Timbakouna Gold Project in Guinea following a temporary pause. The company also completed an airborne geophysical survey and expanded its power auger program, while securing its first ground package through the DeSoto-Fortuna Alliance.

View story
DeSoto Resources Limited
DeSoto Resources Limited
DES
Gold
Guinea

DES: Power Auger Program Expanded at Timbakouna

DeSoto Resources has expanded its power auger drilling program at the Timbakouna project in Guinea by 200 holes following successful geophysical surveys. While 352 holes have been completed, assay results for the current program are pending and expected in late October 2026.

View story