Mining News in Nova Scotia

NexGold Mining Corp.
NexGold Mining Corp.
NEXG
Gold
Nova Scotia
Drill Results

NexGold Mining Intersects 48.62 g/t Gold over 5.0 Metres, 34.30 g/t Gold over 7.0 Metres and 4.17 g/t Gold over 9.0 Metres in RC Infill Drill Program at the Goldboro Gold Project, Nova Scotia

NexGold Mining announced high-grade gold intercepts from its RC infill drill program at the Goldboro Gold Project in Nova Scotia, including 48.62 g/t Au over 5.0 metres and 34.30 g/t Au over 7.0 metres, with a bonanza sub-interval of 237.30 g/t Au over 1.0 metre. These results from 113 holes are intended to increase confidence in mineralization continuity and support the reclassification of Indicated resources to Measured for planned open-pit mining areas. While the data will not be incorporated into the ongoing 2026 Feasibility Study, it will be used for future resource updates, with comprehensive QA/QC procedures disclosed.

View story
Quebec Innovative Materials Corp.
Quebec Innovative Materials Corp.
QIMC.CN
Nova Scotia

QIMC Sets Out Five-Phase Plan to Test Hydrogen Extraction at Bennett Hill, Nova Scotia, on the Path to Commercialization

Quebec Innovative Materials Corp. has announced a five-phase program at its Bennett Hill project in Nova Scotia to test hydrogen extraction. The program, managed by Strum Consulting, includes extending DDH-26-05 to reach a deep fault and testing both dissolved and free gas extraction methods.

View story
NexGold Mining Corp.
NexGold Mining Corp.
NEXG.V
Gold
Nova Scotia

NexGold Intersects 48.62 g/t Gold over 5.0 Metres, 34.30 g/t Gold over 7.0 Metres and 4.17 g/t Gold over 9.0 Metres in RC Infill Drill Program at the Goldboro Gold Project, Nova Scotia

NexGold Mining Corp. announced high-grade gold intercepts from its RC infill drill program at the Goldboro Gold Project in Nova Scotia, including 48.62 g/t Au over 5.0 metres and 34.30 g/t Au over 7.0 metres. These results are intended to increase confidence in the mineralization within planned open-pit areas and support the ongoing Feasibility Study, with potential for future resource reclassification from Indicated to Measured category. The company reported comprehensive QA/QC procedures and noted that some assay results are still pending.

View story
NexGold Mining Corp.
NexGold Mining Corp.
NEXG
Gold
Nova Scotia
Drill Results

NexGold Intersects 48.62 g/t Gold over 5.0 Metres, 34.30 g/t Gold over 7.0 Metres and 4.17 g/t Gold over 9.0 Metres in RC Infill Drill Program at the Goldboro Gold Project, Nova Scotia

NexGold Mining Corp. announced significant assay results from its RC Infill Drill Program at the Goldboro Gold Project in Nova Scotia, including bonanza-grade intercepts of 237.30 g/t gold over 1.0 metre and 233.70 g/t gold over 1.0 metre. These results are intended to increase confidence in mineralization continuity within planned open-pit mining areas and support future resource reclassification. The company reported comprehensive QA/QC procedures and noted that true widths vary between 50% and 100% of reported lengths.

View story
Quebec Innovative Materials Corp.
Quebec Innovative Materials Corp.
QIMC
Nova Scotia

QIMC Extends DDH-26-05 Drilling to Beyond 1,000 Metres and Launches In-Situ Hydrogen Characterization and Extraction Program at Bennett Hill as Seismic Further Corroborates Two Distinct Hydrogen Systems in Nova Scotia

QIMC is extending drill hole DDH-26-05 at Bennett Hill to over 1,000 metres to intersect a principal fault and is launching an in-situ hydrogen characterization and extraction program. Seismic data has identified two distinct hydrogen systems in the region: a fault-hosted hybrid system in the Cobequid Highlands and a conventional reservoir-and-seal system in the Cumberland Basin.

View story
Quebec Innovative Materials Corp.
Quebec Innovative Materials Corp.
QIMC.CN
Nova Scotia

QIMC Extends DDH-26-05 Drilling to Beyond 1,000 Metres and Launches In-Situ Hydrogen Characterization and Extraction Program at Bennett Hill as Seismic Further Corroborates Two Distinct Hydrogen Systems in Nova Scotia

QIMC is extending drill hole DDH-26-05 at Bennett Hill beyond 1,000 metres to intersect a principal fault and is launching an in-situ hydrogen characterization and extraction program. Seismic data has corroborated two distinct hydrogen systems within the Cobequid corridor, supporting a hybrid hydrogeological model.

View story
NexGold Mining Corp.
NexGold Mining Corp.
NEXG
Gold
Nova Scotia
Drill Results

NexGold Mining Intersects 4.16 g/t Gold over 7.0 Metres, 2.84 g/t Gold over 7.0 Metres and 1.94 g/t Gold over 9.0 Metres in RC Infill Drill Program at the Goldboro Gold Project, Nova Scotia

NexGold Mining has reported additional results from its RC infill drill program at the Goldboro Gold Project in Nova Scotia, with highlights including 4.16 g/t gold over 7.0 metres and 2.84 g/t gold over 7.0 metres. The program aims to increase confidence in the resource for potential upgrades to the Measured category and support a final investment decision. While individual intercepts are not exceptional compared to historical bests, the results confirm mineralization continuity and are backed by comprehensive QA/QC protocols.

View story
St Barbara
St Barbara
SBM
Gold
Nova Scotia

St Barbara readies Touquoy gold restart in Nova Scotia amid review dispute

St Barbara is restarting gold production at the Touquoy mine in Nova Scotia by processing three million tonnes of stockpiled ore. The company also announced a new underground resource at Old Austen totaling 520,000 oz of gold, though it faces a new federal impact assessment requirement for its proposed 15-Mile processing hub.

View story
NexGold Mining Corp.
NexGold Mining Corp.
NEXG
Gold
Nova Scotia

NexGold Intersects 4.16 g/t Gold over 7.0 Metres, 2.84 g/t Gold over 7.0 Metres and 1.94 g/t Gold over 9.0 Metres in RC Infill Drill Program at the Goldboro Gold Project, Nova Scotia

NexGold Mining Corp. announced additional results from its RC infill drill program at the Goldboro Gold Project in Nova Scotia, including intercepts of 4.16 g/t gold over 7.0 metres and 2.84 g/t gold over 7.0 metres. This infill drilling aims to increase confidence in the mineralization within planned open-pit mining areas, potentially supporting a resource classification upgrade from Indicated to Measured. The company is also progressing with its Feasibility Study and early works construction activities at the project.

View story
St Barbara
St Barbara
SBM
Gold
Nova Scotia

St Barbara to restart Touquoy amid federal review hurdle

St Barbara is set to restart ore processing at its Touquoy gold mine in Nova Scotia on November 3, 2026, following provincial approval. However, a new federal assessment requirement for the nearby 15-Mile Processing Hub Project introduces regulatory uncertainty. The company also reported a new underground gold resource estimate at the Old Austen Mine.

View story