Emerita Resources Announces Positive IBW Pre-Feasibility Study Results Highlighting US$776 Million After-Tax NPV (8%), 23.51% IRR and 21-Year Mine Life
Emerita Resources announced positive Pre-Feasibility Study results for its IBW project, highlighting a US$776 million after-tax NPV (8%) and a 23.51% IRR over a 21-year mine life. The study is supported by an updated Mineral Resource Estimate showing a 37% increase in Indicated tonnage and a maiden Probable Mineral Reserve of 23.4 million tonnes. The project is designed as a high-grade polymetallic underground mine producing zinc, lead, copper, gold, silver, and pyrite concentrates.