Ni-Co Energy Reports 4.60 Metres at 0.59% Nickel at Kremer-2; Phase-One Drilling Advances Magmatic Sulphide Exploration Model
Ni-Co Energy reports assay results from drill hole KR-26-30 at its Kremer-2 target in Québec, intersecting 4.60m at 0.59% Ni, 0.20% Cu and 0.07% Co from 29.75m downhole, including a higher-grade sub-interval of 1.75m at 1.06% Ni. Assays from the remaining 15 holes of the 16-hole, 3,822m Phase 1 campaign are pending. The company has paused drilling to integrate BHEM survey results, pending assays and University of Ottawa research before planning a spring 2027 Phase 2 campaign.