Gold Mining News in Yukon

Banyan Gold Corp.
Banyan Gold Corp.
BYN
Yukon, Canada

Banyan Intersects 1.67 g/t Au over 32.2 metres in the Airstrip-Powerline Gap at AurMac, Yukon

Banyan Gold Corp. reports five diamond drillhole results from the Airstrip Deposit at its AurMac project in Yukon, headlined by AX-26-910 which intersected 32.2m at 1.67 g/t Au (including 1.5m at 31.30 g/t Au) in the Cal 2 sulphide replacement horizon, extending high-grade mineralization into the Airstrip-Powerline Gap approximately 340m down-dip of the nearest prior intersection. Four additional holes (AX-26-911, -917, -919, -920) confirm high-grade extensions in the eastern Airstrip area, with notable sub-intervals including 4.2m at 6.23 g/t Au and 44.5m at 0.58 g/t Au. Results post-date the PEA data cut-off and will be evaluated for incorporation into future resource estimates; the project currently hosts 3.639 Moz Indicated and 4.985 Moz Inferred gold resources.

View story
Talamore Mining Corp.
Talamore Mining Corp.
TLMR
Gold
Yukon

Coffee assays point to potential pit growth

Talamore Mining Corp. reported assays from 50 drill holes (37 RC and 13 DD) totaling 6,719 meters at the Supremo Extension zone of its Coffee Gold project in the Yukon, with highlights including 6.4 m at 7.75 g/t Au and 5.3 m at 7.35 g/t Au. Results are materially above the existing resource grade of 1.15 g/t and extend mineralization beyond current pit limits, supporting potential pit expansion. Although received after the feasibility study cut-off, the results will be incorporated into a future resource and mine plan update; 109 holes from the broader 299-hole program remain unreported.

View story
Yukon Metals Corp.
Yukon Metals Corp.
YMC
Yukon
Drill Results

Birch drills 33.4 g/t gold over one meter

Yukon Metals Corp. reported assay results from two diamond drill holes (BR26-008 and BR26-010) at its Birch copper-gold skarn project in the Yukon, completing its 2026 exploration campaign of approximately 2,600 meters across six holes. Hole BR26-008 returned a high-grade but narrow 1m interval at 33.4 g/t gold from 51m depth, plus a 4.7m interval at 0.33% copper, within the eastern skarn system. Hole BR26-010 intersected a broader 30.8m interval averaging 0.17% copper and 0.14 g/t gold from 148.5m, extending the central portion of the system approximately 110m west of prior drilling.

View story
Snowline Gold Corp.
Snowline Gold Corp.
SGD
Yukon
Drill Results

Duke reveals another style of Rogue gold

Snowline Gold reported a new gold discovery at Duke (65.8 m at 1.03 g/t Au, including 1 m at 32.2 g/t) confirming intrusion-hosted breccia pipe RIRGS mineralization ~12 km southeast of Valley on the Rogue project in eastern Yukon. At Valley, hole V-26-165 intersected 450.2 m at 1.47 g/t Au from 5.8 m depth — exceeding the current resource model by more than 20% — and extended mineralization beyond the existing pit boundary. Regional exploration at Gracie and Crossroad returned scattered gold but failed to locate the targeted buried intrusions, while a new prospect at Aurelius was identified for future follow-up.

View story
Cantex Mine Development Corp.
Cantex Mine Development Corp.
CD
Yukon
Drill Results

Cantex Mine Development Intersects Up To 2.4 G/T Gold And 27.39% Lead-zinc At The North Gold Target Within Its North Rackla Project, Yukon

Cantex Mine Development reported initial drill results from its North Gold Target within the North Rackla project in Yukon, intersecting up to 2.42 g/t gold and 27.39% lead-zinc. Highlights include 4.00 metres averaging 104.7 g/t silver and 15.44% lead-zinc in hole YKDD26-364, and a 1.00-metre zone of 280.0 g/t silver and 27.39% lead-zinc in YKDD26-365. The company is encouraged by these exploratory intercepts, which suggest a new discovery and potential for a larger mineralizing system.

View story
Cantex Mine Development Corp.
Cantex Mine Development Corp.
CD
Yukon

CANTEX INTERSECTS UP TO 2.4 g/t GOLD AND 27.39% LEAD-ZINC AT THE NORTH GOLD TARGET WITHIN ITS NORTH RACKLA PROJECT, YUKON

Cantex Mine Development Corp. reported significant exploratory drill results from its North Gold Target at the North Rackla project in Yukon. The program intersected high-grade silver, lead, and zinc, including a 1.0m zone of 280.0 g/t silver and 27.39% lead-zinc.

View story
Cantex Mine Development Corp.
Cantex Mine Development Corp.
CD.V
Yukon

CANTEX INTERSECTS UP TO 2.4 g/t GOLD AND 27.39% LEAD-ZINC AT THE NORTH GOLD TARGET WITHIN ITS NORTH RACKLA PROJECT, YUKON

Cantex Mine Development Corp. has reported significant exploratory drill results at its North Gold Target within the North Rackla project in the Yukon. Highlights include a 1.00m intercept of 280.0 g/t silver and 27.39% lead-zinc, alongside successful intersections in all three holes drilled during the 2026 season.

View story
Cantex Mine Development Corp.
Cantex Mine Development Corp.
CD
Yukon
Drill Results

Cantex Intersects Up to 2.4 g/t Gold and 27.39% Lead-Zinc at the North Gold Target Within its North Rackla Project, Yukon

Cantex Mine Development Corp. reports initial drill results from the North Gold Target at its 100%-owned North Rackla project in Yukon, with three diamond drill holes all intersecting polymetallic mineralization. Highlights include 1m at 2.42 g/t Au from 91m depth, 1m at 280 g/t Ag and 27.39% Pb+Zn from 99m depth, and a broader 8m interval at 59.8 g/t Ag and 8.34% Pb+Zn. True widths are undetermined and the target is interpreted as a discrete zone rather than an extension of the Main Zone, with further drilling planned for next season.

View story
Rockhaven Resources Ltd.
Rockhaven Resources Ltd.
RK.V
Yukon

Rockhaven Announces Successful Completion of 2026 Klaza Bulk Sample Program

Rockhaven Resources Ltd. successfully completed its 2026 Klaza bulk sample program, extracting 2,477 wet metric tonnes of high-grade Direct Shipping Oxide material from the Western BRX Zone. The program returned average grades of 34.3 g/t gold and 316 g/t silver, with USD $6.9 million in provisional payments received to date. The company plans to continue bulk sampling and initiate a diamond drill program in 2027 to support a Pre-feasibility Study.

View story