NexGold Mining Intersects 48.62 g/t Gold over 5.0 Metres, 34.30 g/t Gold over 7.0 Metres and 4.17 g/t Gold over 9.0 Metres in RC Infill Drill Program at the Goldboro Gold Project, Nova Scotia
NexGold Mining announced high-grade gold intercepts from its RC infill drill program at the Goldboro Gold Project in Nova Scotia, including 48.62 g/t Au over 5.0 metres and 34.30 g/t Au over 7.0 metres, with a bonanza sub-interval of 237.30 g/t Au over 1.0 metre. These results from 113 holes are intended to increase confidence in mineralization continuity and support the reclassification of Indicated resources to Measured for planned open-pit mining areas. While the data will not be incorporated into the ongoing 2026 Feasibility Study, it will be used for future resource updates, with comprehensive QA/QC procedures disclosed.