Boron One Holdings Inc.
Metallurgical Results
Boron One Announces Positive Study for Mineral Processing Facility
Boron One has completed a mineral processing study for its Piskanja Borate Project, supporting a conceptual facility processing 250,000 tonnes per year. The study demonstrates that a high-grade (40% B2O3) colemanite concentrate can be produced with approximately 86% recovery using gravity-based separation.