# Work Commences to Produce NdPr Oxide and NdPr Metal from Halleck Creek Ore

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/work-commences-to-produce-ndpr-oxide-and-ndpr-metal-from-halleck-creek-ore--916b5fa9-c32d-4e06-a777-4ff2f11d326f

Original source: https://www.globenewswire.com/news-release/2026/11/09/3398428/0/en/work-commences-to-produce-ndpr-oxide-and-ndpr-metal-from-halleck-creek-ore.html

Publisher: globenewswire

Original announcement: 2026-11-09T00:00:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-11-09T14:46:33.236Z

Atlas analysis updated: 2026-11-09T14:46:33.236Z

- Company: American Rare Earths Limited

- Ticker: ARR

- Exchange: Unavailable

- Region: Wyoming

- Primary commodity: Neodymium

- Secondary commodities: Praseodymium

- Document categories: Metallurgy, Other

- Extracted: 2026-11-09 14:31:59 UTC

Narrative sentiment: 0.60 · Bullish

## Minestarters Atlas summary

American Rare Earths has commenced a three-phase metallurgical program at Novex, LLC to produce NdPr oxide and NdPr metal from Halleck Creek concentrate. The program includes laboratory verification, a small-scale continuous pilot plant campaign, and metal demonstration, with completion expected in Q1 2027.

Reasoning: The announcement marks a significant technical milestone by moving from concentrate to metal in a single connected program, enhancing the project's vertical integration narrative.

- Positive factor: Commencement of integrated concentrate-to-metal pilot program

- Positive factor: Demonstration of midstream value-add capability in the US

- Positive factor: Clear three-phase program structure with defined milestones

- Negative factor: Demonstration quantities only, not commercial scale

- Negative factor: Timing is subject to analytical turnaround and performance

Facts used in scoring: 2

## Classification and evidence

**Mill Route**

Polarity: neutral

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: The program involves leaching, solvent extraction, and calcination in a pilot plant setting.

Evidence · text

> The circuit runs leaching, filtration and washing, two neutralization steps, uranium polishing and conditional cerium removal, followed by two connected solvent extraction circuits

**Single Domain Only**

Polarity: negative

Definition: Testing limited to one composite or domain — representativeness not established.

Why it applies: only one composite was tested

## Extracted facts

Stored fact records: 2. Some facts used in scoring do not have a stored record.

## Metallurgical Results (2)

### pilot plant

[Link to this fact](https://atlas-aws.minestarters.com/news/work-commences-to-produce-ndpr-oxide-and-ndpr-metal-from-halleck-creek-ore--916b5fa9-c32d-4e06-a777-4ff2f11d326f#fact-metallurgical-facts-0)

Halleck Creek · neodymium

#### Identity

- Project: Halleck Creek
- Commodity: neodymium
- Region: wyoming
- Reported Region: Wyoming
- Ticker: ARR

#### Test Work

- Program Status: preliminary
- Test Type: pilot plant
- Processing Route: leaching, filtration and washing, two neutralization steps, uranium polishing and conditional cerium removal, two connected solvent extraction circuits, precipitation with oxalic acid, washing and calcination
- Sample: Phase 2: Small scale continuous pilot plant NdPr oxide campaign

#### Lab

- Laboratory: Novex, LLC

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-09T00:00:00.000Z

Reasoning: Pilot plant testing is a key step toward commercial viability.

- Positive factor: Targeting high purity \(99.99%\)

- Negative factor: Pilot scale only

Evidence · text

> Purified NdPr oxide, targeting 99.99% purity

#### Tags used in scoring

**Pilot Scale Complete**

Polarity: positive

Definition: Pilot or demonstration plant testing completed under continuous operation.

Why it applies: test\_type names pilot-scale work

### pilot plant

[Link to this fact](https://atlas-aws.minestarters.com/news/work-commences-to-produce-ndpr-oxide-and-ndpr-metal-from-halleck-creek-ore--916b5fa9-c32d-4e06-a777-4ff2f11d326f#fact-metallurgical-facts-1)

Halleck Creek · praseodymium

#### Identity

- Project: Halleck Creek
- Commodity: praseodymium
- Region: wyoming
- Reported Region: Wyoming
- Ticker: ARR

#### Test Work

- Program Status: preliminary
- Test Type: pilot plant
- Processing Route: leaching, filtration and washing, two neutralization steps, uranium polishing and conditional cerium removal, two connected solvent extraction circuits, precipitation with oxalic acid, washing and calcination
- Sample: Phase 2: Small scale continuous pilot plant NdPr oxide campaign

#### Lab

- Laboratory: Novex, LLC

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-09T00:00:00.000Z

Reasoning: Pilot plant testing is a key step toward commercial viability.

- Positive factor: Targeting high purity \(99.99%\)

- Negative factor: Pilot scale only

Evidence · text

> Purified NdPr oxide, targeting 99.99% purity

#### Tags used in scoring

**Pilot Scale Complete**

Polarity: positive

Definition: Pilot or demonstration plant testing completed under continuous operation.

Why it applies: test\_type names pilot-scale work

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
