WCE: Elizabeth Hill Up 20% to 3.36 Moz Ag, 77% Indicated Resource
Original announcement by asx on
- Company
- WEST COAST SILVER LIMITED
- Ticker
- WCE
- Exchange
- ASX
- Region
- Western Australia
- Primary commodity
- Unavailable
- Secondary commodities
- None reported
- Document categories
- Resource update
- Extracted
- 2026-11-10 22:23:32 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
West Coast Silver Limited announced an updated JORC 2012 Mineral Resource Estimate for its Elizabeth Hill Silver Project in Western Australia, reporting a 20.3% increase in contained silver to 3.36 Moz. Resource confidence significantly improved, with 77% of contained silver now classified as Indicated, up from 13% previously. While the average silver grade decreased by 27.7% due to the inclusion of lower-grade material, the overall growth and de-risking of the resource support the advancement to a Scoping Study.
Reasoning: The updated MRE shows a significant increase in contained silver and a substantial improvement in resource confidence, de-risking the project and supporting future economic studies, despite a decrease in average grade.
Positive factors
- Significant increase in contained silver (20.3%)
- Substantial upgrade in resource confidence (Indicated share from 13% to 77%)
- JORC 2012 compliant
- Competent Person sign-off
- Supports advancement to Scoping Study
- High-grade core identified
- Growth reflects new drilling and revised interpretation
Negative factors
- Average grade declined by 27.7% due to inclusion of lower-grade material
- Elizabeth Hill Deeps remains unclassified and excluded
- Metallurgical recovery of 90% is an assumption, not demonstrated
- No Measured Mineral Resource reported
Facts used in scoring: 2

Classification and evidence
Category Upgradepositive
Resource confidence improved — Inferred upgraded to Indicated, or Indicated to Measured. De-risking signal.
Why it applies: Resource confidence lifted with 2.59 Moz Ag (77%) of contained silver now at Indicated level of confidence, up from 369 koz (13%) in April 2026.
Evidence · text
“Resource confidence lifted with 2.59 Moz Ag (77%) of contained silver now at Indicated level of confidence, up from 369 koz (13%) in April 2026.”
Contained Metal Growthpositive
True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.
Why it applies: Contained silver up 20.3% (+568 koz) on the April 2026 MRE.
Evidence · text
“Contained silver up 20.3% (+568 koz) on the April 2026 MRE.”
Tonnage Growthpositive
Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.
Why it applies: Mineral Resource tonnage increased 66.5% (+93.7 kt) to 234.7 kt.
Evidence · text
“Mineral Resource tonnage increased 66.5% (+93.7 kt) to 234.7 kt.”
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: The estimate was prepared by Dmitry Pertel, MAIG, in accordance with the JORC Code (2012).
Evidence · text
“The estimate was prepared by Dmitry Pertel, MAIG, in accordance with the JORC Code (2012).”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: The estimate was prepared by Dmitry Pertel, MAIG, in accordance with the JORC Code (2012).
Evidence · text
“The estimate was prepared by Dmitry Pertel, MAIG, in accordance with the JORC Code (2012).”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: The updated Mineral Resource totals 234.7 kt at 446 g/t Ag for 3.36 Moz of contained silver at a 20 g/t Ag reporting cut-off.
Evidence · text
“at a 20 g/t Ag reporting cut-off”
Grade Declinenegative
Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.
Why it applies: The inclusion of additional lower-grade material reduced the average silver grade by 27.7%, from 617 g/t Ag to 446 g/t Ag.
Evidence · text
“The inclusion of additional lower-grade material reduced the average silver grade by 27.7%, from 617 g/t Ag to 446 g/t Ag.”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The updated MRE includes 776 koz Ag in the Inferred category.
Evidence · table
“776”
Context: 38.8
No Measured Resourcenegative · Story-specific tag
No canonical definition is currently available.
Why it applies: No Measured Mineral Resource or Ore Reserve is reported.
Evidence · text
“No Measured Mineral Resource or Ore Reserve is reported.”
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: The announcement provides an updated Mineral Resource Estimate for the Elizabeth Hill Silver Project.
Evidence · text
“announces an updated Mineral Resource Estimate (MRE)”
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: The increased level of confidence supports West Coast Silver advancing to a Scoping Study.
Evidence · text
“The increased level of confidence supports West Coast Silver advancing to a Scoping Study”
Extracted facts
Stored fact records: 2. Some facts used in scoring do not have a stored record.
Resource Estimates (2)
indicatedElizabeth Hill Silver Project · silverTonnes: 195900Grade: 411Grade Unit: g/tContained Metal: 2587Contained Unit: kozView all detailsHide details
Identity
- Project
- Elizabeth Hill Silver Project
- Commodity
- silver
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- WCE
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-03T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dmitry Pertel
- Resource group id
- resource:026af173928d68792f32
- Mining method
- combined
- Material type
- mixed
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- indicated
- Tonnes
- 195900
- Grade
- 411
- Grade Unit
- g/t
- Contained Metal
- 2587
- Contained Unit
- koz
- Cutoff Grade
- 20
- Cutoff Unit
- g/t Ag
Prior Estimate
- Resource Date
- 2026-09-03
- Prior Tonnes
- 84000
- Prior Grade
- 137
- Prior Contained Metal
- 369
- Prior Cutoff Grade
- 20
Metal Equivalent
- Assumptions Disclosed
- No
Lab
- Laboratory
- ALS Perth
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: The Indicated resource shows a significant increase in contained silver and a substantial upgrade in confidence from the previous estimate, de-risking the project.
Positive factors
- Significant increase in contained metal
- Substantial category upgrade
- JORC compliant
- QP/CP signed
- Cut-off grade disclosed
Evidence · table
“2,587”
Context: 195.9
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Tonnage Growthpositive
Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.
Why it applies: 195900 against 84000 previously
Grade Improvementpositive
Average resource grade improved vs prior estimate — better deposit economics.
Why it applies: 411 against 137 previously
Contained Metal Growthpositive
True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.
Why it applies: 2587 against 369 previously
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredElizabeth Hill Silver Project · silverTonnes: 38800Grade: 622Grade Unit: g/tContained Metal: 776Contained Unit: kozView all detailsHide details
Identity
- Project
- Elizabeth Hill Silver Project
- Commodity
- silver
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- WCE
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-03T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Dmitry Pertel
- Resource group id
- resource:5840b306a97dd13c1f1f
- Mining method
- combined
- Material type
- mixed
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 38800
- Grade
- 622
- Grade Unit
- g/t
- Contained Metal
- 776
- Contained Unit
- koz
- Cutoff Grade
- 20
- Cutoff Unit
- g/t Ag
Prior Estimate
- Resource Date
- 2026-09-03
- Prior Tonnes
- 57000
- Prior Grade
- 1331
- Prior Contained Metal
- 2426
- Prior Cutoff Grade
- 20
Metal Equivalent
- Assumptions Disclosed
- No
Lab
- Laboratory
- ALS Perth
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-10T00:00:00.000Z
Reasoning: The Inferred resource shows a significant decrease in contained silver and grade compared to the previous estimate, indicating a reclassification of ounces to the Indicated category rather than new Inferred growth.
Positive factors
- JORC compliant
- QP/CP signed
- Cut-off grade disclosed
Negative factors
- Contained metal decline
- Grade decline
- Inferred category
Evidence · table
“776”
Context: 38.8
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Tonnage Declinenegative
Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.
Why it applies: 38800 against 57000 previously
Grade Declinenegative
Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.
Why it applies: 622 against 1331 previously
Contained Metal Declinenegative
Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.
Why it applies: 776 against 2426 previously
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.