Summary

The Definitive Feasibility Study (DFS) for Wildcat Resources' Tabba Tabba Project confirms its potential as a large-scale lithium development, reporting a post-tax NPV8 of A$1.5 billion and an IRR of 28.4%. The study outlines a Probable Ore Reserve of 48.3 Mt at 0.97% Li2O and confirms the ability to produce a 5.5% Li2O spodumene concentrate at 75.7% recovery. The DFS significantly accelerates cash generation and de-risks key aspects of the project, with the company fully funded to a Final Investment Decision.

Reasoning: The Definitive Feasibility Study (DFS) for Wildcat Resources' Tabba Tabba Project confirms strong economic viability with improved financial metrics, a large Probable Ore Reserve, and confirmed metallurgy, significantly de-risking the project and accelerating its development pathway. The study also includes a Preliminary Feasibility Study (PFS) for combined by-product potential, further enhancing project value.

Positive factors

  • Strong Financials
  • Accelerated Development
  • Probable Reserve
  • Category Upgrade
  • Tonnage Growth
  • Contained Metal Growth
  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed
  • High Recovery
  • Pilot Scale Complete
  • Multi-Domain Tested

Negative factors

  • Increased Capex
  • Deleterious Elements Present
  • Contained metal calculation discrepancy

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 160

Atlas analysis — Wildcat Resources Limited: WC8: TABBA TABBA DFS CLEARS PATHWAY FOR LARGE-SCALE DEVELOPMENT. probable 38100000 tonnes

Classification and evidence

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: the document describes a mill_cil route ("concentrator")

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: the document describes a gravity route ("gravity")

Extracted facts

Stored fact records: 75. Some facts used in scoring do not have a stored record.

Resource Estimates (75)

probableTabba Tabba · lithiumTonnes: 38100000Grade: 0.99Grade Unit: %Contained Metal: 378Contained Unit: ktView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Jonathon Nortier
Resource group id
resource:de4ef287c01240add8c1
Deposit or zone
Leia
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
38100000
Grade
0.99
Grade Unit
%
Contained Metal
378
Contained Unit
kt
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Leia open pit Probable Ore Reserve of 38.1 Mt at 0.99% Li2O represents a significant, high-confidence portion of the project's economic inventory.

Positive factors

  • Probable Reserve
  • Category Upgrade
  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“38.1”

Context: Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · iron_oreTonnes: 38100000Grade: 1.07Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Jonathon Nortier
Resource group id
resource:de4ef287c01240add8c1
Deposit or zone
Leia
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
38100000
Grade
1.07
Grade Unit
%

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Fe2O3 grade of 1.07% in the Leia open pit Probable Ore Reserve indicates the presence of iron, which is managed as a deleterious element.

Negative factors

  • Deleterious Elements Present

Evidence · table

“1.07%”

Context: Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · lithiumTonnes: 3400000Grade: 0.98Grade Unit: %Contained Metal: 33Contained Unit: ktView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Cailli Knievel
Resource group id
resource:9474c725a93180fb2c69
Deposit or zone
Leia
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
3400000
Grade
0.98
Grade Unit
%
Contained Metal
33
Contained Unit
kt
Cutoff Grade
0.6
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Leia underground Probable Ore Reserve of 3.4 Mt at 0.98% Li2O contributes to the overall project inventory with a higher cut-off grade for underground mining.

Positive factors

  • Probable Reserve
  • Category Upgrade
  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“3.4”

Context: Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · iron_oreTonnes: 3400000Grade: 0.79Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Cailli Knievel
Resource group id
resource:9474c725a93180fb2c69
Deposit or zone
Leia
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
3400000
Grade
0.79
Grade Unit
%

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Fe2O3 grade of 0.79% in the Leia underground Probable Ore Reserve indicates the presence of iron, which is managed as a deleterious element.

Negative factors

  • Deleterious Elements Present

Evidence · table

“0.79”

Context: Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · lithiumTonnes: 6800000Grade: 0.83Grade Unit: %Contained Metal: 56Contained Unit: ktView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Cailli Knievel
Resource group id
resource:894c068ef1f1913921fa
Deposit or zone
Luke
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
6800000
Grade
0.83
Grade Unit
%
Contained Metal
56
Contained Unit
kt
Cutoff Grade
0.6
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Luke underground Probable Ore Reserve of 6.8 Mt at 0.83% Li2O adds to the project's high-confidence inventory, with a higher cut-off grade for underground mining.

Positive factors

  • Probable Reserve
  • Category Upgrade
  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“6.8”

Context: Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · iron_oreTonnes: 6800000Grade: 1.88Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Cailli Knievel
Resource group id
resource:894c068ef1f1913921fa
Deposit or zone
Luke
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
6800000
Grade
1.88
Grade Unit
%

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Fe2O3 grade of 1.88% in the Luke underground Probable Ore Reserve indicates the presence of iron, which is managed as a deleterious element.

Negative factors

  • Deleterious Elements Present

Evidence · table

“1.88”

Context: Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · lithiumTonnes: 48300000Grade: 0.97Grade Unit: %Contained Metal: 467Contained Unit: ktView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Jonathon Nortier, Cailli Knievel
Resource group id
resource:3cdbdd669f852b0cee26
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
48300000
Grade
0.97
Grade Unit
%
Contained Metal
467
Contained Unit
kt

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The total Probable Ore Reserve of 48.3 Mt at 0.97% Li2O represents a substantial, high-confidence economic inventory for the project.

Positive factors

  • Probable Reserve
  • Category Upgrade
  • JORC Compliant
  • QP/CP Signed
  • Contained Metal Growth

Evidence · table

“48.3”

Context: Sub-Total Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · iron_oreTonnes: 48300000Grade: 1.17Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Jonathon Nortier, Cailli Knievel
Resource group id
resource:3cdbdd669f852b0cee26
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
48300000
Grade
1.17
Grade Unit
%

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The total Fe2O3 grade of 1.17% in the Probable Ore Reserve indicates the presence of iron, which is managed as a deleterious element.

Negative factors

  • Deleterious Elements Present

Evidence · table

“1.17%”

Context: Sub-Total Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · lithiumTonnes: 69100000Grade: 1.01Grade Unit: %Contained Metal: 698400Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:7f1f630b779918cb5573
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
69100000
Grade
1.01
Grade Unit
%
Contained Metal
698400
Contained Unit
t
Cutoff Grade
0.45
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Indicated Mineral Resource of 69.1 Mt at 1.01% Li2O provides a high-confidence estimate for project planning, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“69.1”

Context: Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · tantalumTonnes: 69100000Grade: 64Grade Unit: ppmContained Metal: 9798700Contained Unit: lbView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:7f1f630b779918cb5573
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
69100000
Grade
64
Grade Unit
ppm
Contained Metal
9798700
Contained Unit
lb
Cutoff Grade
0.45
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Indicated Mineral Resource includes 64 ppm Ta2O5, indicating tantalum as a potential by-product, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“64”

Context: Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · iron_oreTonnes: 69100000Grade: 0.64Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:7f1f630b779918cb5573
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
69100000
Grade
0.64
Grade Unit
%
Cutoff Grade
0.45
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Indicated Mineral Resource includes 0.64% Fe2O3, which is a deleterious element that needs to be managed.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Deleterious Elements Present

Evidence · table

“0.64”

Context: Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · lithiumTonnes: 4400000Grade: 0.75Grade Unit: %Contained Metal: 32800Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:65df193a0d2397d5dcd7
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4400000
Grade
0.75
Grade Unit
%
Contained Metal
32800
Contained Unit
t
Cutoff Grade
0.45
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Inferred Mineral Resource of 4.4 Mt at 0.75% Li2O provides an estimate of potential, but with lower geological confidence, and a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“4.4”

Context: Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · tantalumTonnes: 4400000Grade: 74Grade Unit: ppmContained Metal: 714800Contained Unit: lbView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:65df193a0d2397d5dcd7
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4400000
Grade
74
Grade Unit
ppm
Contained Metal
714800
Contained Unit
lb
Cutoff Grade
0.45
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Inferred Mineral Resource includes 74 ppm Ta2O5, indicating potential for tantalum by-product, but with lower geological confidence, and a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“74”

Context: Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · iron_oreTonnes: 4400000Grade: 0.79Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:65df193a0d2397d5dcd7
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
4400000
Grade
0.79
Grade Unit
%
Cutoff Grade
0.45
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Inferred Mineral Resource includes 0.79% Fe2O3, which is a deleterious element, and has lower geological confidence, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource
  • Deleterious Elements Present

Evidence · table

“0.79”

Context: Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · lithiumTonnes: 84000000Grade: 0.9Grade Unit: %Contained Metal: 754000Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:f3a8827a4dddfc0ffbc6
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
84000000
Grade
0.9
Grade Unit
%
Contained Metal
754000
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Indicated Mineral Resource at a 0.3% Li2O cut-off is 84.0 Mt at 0.90% Li2O, providing a larger tonnage estimate with good confidence.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“84.0”

Context: Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · tantalumTonnes: 84000000Grade: 66Grade Unit: ppmContained Metal: 12222100Contained Unit: lbView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:f3a8827a4dddfc0ffbc6
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
84000000
Grade
66
Grade Unit
ppm
Contained Metal
12222100
Contained Unit
lb
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Indicated Mineral Resource at a 0.3% Li2O cut-off includes 66 ppm Ta2O5, indicating potential for tantalum by-product.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“66”

Context: Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · iron_oreTonnes: 84000000Grade: 0.65Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:f3a8827a4dddfc0ffbc6
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
84000000
Grade
0.65
Grade Unit
%
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Indicated Mineral Resource at a 0.3% Li2O cut-off includes 0.65% Fe2O3, which is a deleterious element that needs to be managed.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Deleterious Elements Present

Evidence · table

“0.65”

Context: Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · lithiumTonnes: 6500000Grade: 0.63Grade Unit: %Contained Metal: 40500Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:ad62baa0f3fe2a34aa98
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
6500000
Grade
0.63
Grade Unit
%
Contained Metal
40500
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Inferred Mineral Resource at a 0.3% Li2O cut-off is 6.5 Mt at 0.63% Li2O, providing an estimate of potential, but with lower geological confidence.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“6.5”

Context: Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · tantalumTonnes: 6500000Grade: 70Grade Unit: ppmContained Metal: 995500Contained Unit: lbView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:ad62baa0f3fe2a34aa98
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
6500000
Grade
70
Grade Unit
ppm
Contained Metal
995500
Contained Unit
lb
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Inferred Mineral Resource at a 0.3% Li2O cut-off includes 70 ppm Ta2O5, indicating potential for tantalum by-product, but with lower geological confidence.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“70”

Context: Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · iron_oreTonnes: 6500000Grade: 0.83Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:ad62baa0f3fe2a34aa98
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
6500000
Grade
0.83
Grade Unit
%
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Inferred Mineral Resource at a 0.3% Li2O cut-off includes 0.83% Fe2O3, which is a deleterious element, and has lower geological confidence.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource
  • Deleterious Elements Present

Evidence · table

“0.83”

Context: Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · lithiumTonnes: 38100000Grade: 0.99Grade Unit: %Contained Metal: 378Contained Unit: ktView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Jonathon Nortier
Resource group id
resource:de4ef287c01240add8c1
Deposit or zone
Leia
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
38100000
Grade
0.99
Grade Unit
%
Contained Metal
378
Contained Unit
kt
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Leia open pit Probable Ore Reserve of 38.1 Mt at 0.99% Li2O represents a significant, high-confidence portion of the project's economic inventory.

Positive factors

  • Probable Reserve
  • Category Upgrade
  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“38.1”

Context: Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · iron_oreTonnes: 38100000Grade: 1.07Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Jonathon Nortier
Resource group id
resource:de4ef287c01240add8c1
Deposit or zone
Leia
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
38100000
Grade
1.07
Grade Unit
%

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Fe2O3 grade of 1.07% in the Leia open pit Probable Ore Reserve indicates the presence of iron, which is managed as a deleterious element.

Negative factors

  • Deleterious Elements Present

Evidence · table

“1.07%”

Context: Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · petaliteTonnes: 4600000Grade: 0.74Grade Unit: %Contained Metal: 34Contained Unit: ktView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
petalite
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Jonathon Nortier
Resource group id
resource:391ba2c2362de7607e57
Deposit or zone
Chewy
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
4600000
Grade
0.74
Grade Unit
%
Contained Metal
34
Contained Unit
kt
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Chewy open pit Probable Ore Reserve of 4.6 Mt at 0.74% Li2O (petalite) adds to the project's economic inventory, with a clear cut-off grade.

Positive factors

  • Probable Reserve
  • Category Upgrade
  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“4.6”

Context: Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · iron_oreTonnes: 4600000Grade: 2.08Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Jonathon Nortier
Resource group id
resource:391ba2c2362de7607e57
Deposit or zone
Chewy
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
4600000
Grade
2.08
Grade Unit
%
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Fe2O3 grade of 2.08% in the Chewy open pit Probable Ore Reserve indicates the presence of iron, which is managed as a deleterious element.

Negative factors

  • Deleterious Elements Present

Evidence · table

“2.08%”

Context: Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · petaliteTonnes: 2700000Grade: 0.81Grade Unit: %Contained Metal: 22Contained Unit: ktView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
petalite
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Jonathon Nortier
Resource group id
resource:a784634ca3b4320dca22
Deposit or zone
Han and Hutt
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
2700000
Grade
0.81
Grade Unit
%
Contained Metal
22
Contained Unit
kt
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Han and Hutt open pit Probable Ore Reserve of 2.7 Mt at 0.81% Li2O (petalite) adds to the project's economic inventory, with a clear cut-off grade.

Positive factors

  • Probable Reserve
  • Category Upgrade
  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“2.7”

Context: Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · iron_oreTonnes: 2700000Grade: 2.61Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Jonathon Nortier
Resource group id
resource:a784634ca3b4320dca22
Deposit or zone
Han and Hutt
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
2700000
Grade
2.61
Grade Unit
%
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Fe2O3 grade of 2.61% in the Han and Hutt open pit Probable Ore Reserve indicates the presence of iron, which is managed as a deleterious element.

Negative factors

  • Deleterious Elements Present

Evidence · table

“2.61%”

Context: Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · lithiumTonnes: 3400000Grade: 0.98Grade Unit: %Contained Metal: 33Contained Unit: ktView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Cailli Knievel
Resource group id
resource:9474c725a93180fb2c69
Deposit or zone
Leia
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
3400000
Grade
0.98
Grade Unit
%
Contained Metal
33
Contained Unit
kt
Cutoff Grade
0.6
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Leia underground Probable Ore Reserve of 3.4 Mt at 0.98% Li2O contributes to the overall project inventory with a higher cut-off grade for underground mining.

Positive factors

  • Probable Reserve
  • Category Upgrade
  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“3.4”

Context: Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · iron_oreTonnes: 3400000Grade: 0.79Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Cailli Knievel
Resource group id
resource:9474c725a93180fb2c69
Deposit or zone
Leia
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
3400000
Grade
0.79
Grade Unit
%

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Fe2O3 grade of 0.79% in the Leia underground Probable Ore Reserve indicates the presence of iron, which is managed as a deleterious element.

Negative factors

  • Deleterious Elements Present

Evidence · table

“0.79”

Context: Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · lithiumTonnes: 6800000Grade: 0.83Grade Unit: %Contained Metal: 56Contained Unit: ktView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Cailli Knievel
Resource group id
resource:894c068ef1f1913921fa
Deposit or zone
Luke
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
6800000
Grade
0.83
Grade Unit
%
Contained Metal
56
Contained Unit
kt
Cutoff Grade
0.6
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Luke underground Probable Ore Reserve of 6.8 Mt at 0.83% Li2O adds to the project's high-confidence inventory, with a higher cut-off grade for underground mining.

Positive factors

  • Probable Reserve
  • Category Upgrade
  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“6.8”

Context: Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · iron_oreTonnes: 6800000Grade: 1.88Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Cailli Knievel
Resource group id
resource:894c068ef1f1913921fa
Deposit or zone
Luke
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
6800000
Grade
1.88
Grade Unit
%

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Fe2O3 grade of 1.88% in the Luke underground Probable Ore Reserve indicates the presence of iron, which is managed as a deleterious element.

Negative factors

  • Deleterious Elements Present

Evidence · table

“1.88”

Context: Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · lithiumTonnes: 55600000Grade: 0.94Grade Unit: %Contained Metal: 523Contained Unit: ktView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Jonathon Nortier, Cailli Knievel
Resource group id
resource:fa51245520476e8dc066
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
55600000
Grade
0.94
Grade Unit
%
Contained Metal
523
Contained Unit
kt

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The total lithium Probable Ore Reserve of 55.6 Mt at 0.94% Li2O represents a substantial, high-confidence economic inventory for the combined project, showing growth compared to the DFS.

Positive factors

  • Probable Reserve
  • Category Upgrade
  • JORC Compliant
  • QP/CP Signed
  • Tonnage Growth
  • Contained Metal Growth

Evidence · table

“55.6”

Context: Sub-Total Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · iron_oreTonnes: 55600000Grade: 1.31Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Jonathon Nortier, Cailli Knievel
Resource group id
resource:fa51245520476e8dc066
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
55600000
Grade
1.31
Grade Unit
%

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The total Fe2O3 grade of 1.31% in the lithium Probable Ore Reserve indicates the presence of iron, which is managed as a deleterious element.

Negative factors

  • Deleterious Elements Present

Evidence · table

“1.31%”

Context: Sub-Total Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableTabba Tabba · tantalumTonnes: 900000Grade: 457Grade Unit: ppmContained Metal: 422Contained Unit: ktView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Jonathon Nortier
Resource group id
resource:e2b86b112ed4d15bb1ae
Deposit or zone
Tabba Tabba
Mining method
combined
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
900000
Grade
457
Grade Unit
ppm
Contained Metal
422
Contained Unit
kt
Cutoff Grade
200
Cutoff Unit
ppm Ta2O5

Prior Estimate

Resource Date
2026-10-26

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Tabba Tabba open pit Probable Ore Reserve of 0.9 Mt at 457 ppm Ta2O5 provides an economic inventory for tantalum, with a clear cut-off grade, though the contained metal figure appears anomalous.

Positive factors

  • Probable Reserve
  • Category Upgrade
  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Contained metal calculation discrepancy

Evidence · table

“0.9”

Context: Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · lithiumTonnes: 54600000Grade: 0.95Grade Unit: %Contained Metal: 515600Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:bc770015eacd8441657c
Deposit or zone
Leia
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
54600000
Grade
0.95
Grade Unit
%
Contained Metal
515600
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Leia Indicated Mineral Resource of 54.6 Mt at 0.95% Li2O provides a high-confidence estimate for project planning, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“54.6”

Context: Leia

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · tantalumTonnes: 54600000Grade: 67Grade Unit: ppmContained Metal: 8011300Contained Unit: lbView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:bc770015eacd8441657c
Deposit or zone
Leia
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
54600000
Grade
67
Grade Unit
ppm
Contained Metal
8011300
Contained Unit
lb
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Leia Indicated Mineral Resource includes 67 ppm Ta2O5, indicating tantalum as a potential by-product, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“67”

Context: Leia

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · iron_oreTonnes: 54600000Grade: 0.6Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:bc770015eacd8441657c
Deposit or zone
Leia
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
54600000
Grade
0.6
Grade Unit
%
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Leia Indicated Mineral Resource includes 0.60% Fe2O3, which is a deleterious element that needs to be managed.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Deleterious Elements Present

Evidence · table

“0.60”

Context: Leia

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · lithiumTonnes: 300000Grade: 0.79Grade Unit: %Contained Metal: 2600Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:c703318e4418bbd8beb2
Deposit or zone
Leia
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
300000
Grade
0.79
Grade Unit
%
Contained Metal
2600
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Leia Inferred Mineral Resource of 0.3 Mt at 0.79% Li2O provides an estimate of potential, but with lower geological confidence, and a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“0.3”

Context: Leia

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · tantalumTonnes: 300000Grade: 51Grade Unit: ppmContained Metal: 36700Contained Unit: lbView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:c703318e4418bbd8beb2
Deposit or zone
Leia
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
300000
Grade
51
Grade Unit
ppm
Contained Metal
36700
Contained Unit
lb
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Leia Inferred Mineral Resource includes 51 ppm Ta2O5, indicating potential for tantalum by-product, but with lower geological confidence, and a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“51”

Context: Leia

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · iron_oreTonnes: 300000Grade: 0.75Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:c703318e4418bbd8beb2
Deposit or zone
Leia
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
300000
Grade
0.75
Grade Unit
%
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Leia Inferred Mineral Resource includes 0.75% Fe2O3, which is a deleterious element, and has lower geological confidence, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource
  • Deleterious Elements Present

Evidence · table

“0.75”

Context: Leia

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · lithiumTonnes: 17400000Grade: 0.81Grade Unit: %Contained Metal: 141900Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:6959c6c18fb062541685
Deposit or zone
Luke
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
17400000
Grade
0.81
Grade Unit
%
Contained Metal
141900
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Luke Indicated Mineral Resource of 17.4 Mt at 0.81% Li2O provides a high-confidence estimate for project planning, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“17.4”

Context: Luke

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · tantalumTonnes: 17400000Grade: 75Grade Unit: ppmContained Metal: 2875300Contained Unit: lbView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:6959c6c18fb062541685
Deposit or zone
Luke
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
17400000
Grade
75
Grade Unit
ppm
Contained Metal
2875300
Contained Unit
lb
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Luke Indicated Mineral Resource includes 75 ppm Ta2O5, indicating tantalum as a potential by-product, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“75”

Context: Luke

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · iron_oreTonnes: 17400000Grade: 0.63Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:6959c6c18fb062541685
Deposit or zone
Luke
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
17400000
Grade
0.63
Grade Unit
%
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Luke Indicated Mineral Resource includes 0.63% Fe2O3, which is a deleterious element that needs to be managed.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Deleterious Elements Present

Evidence · table

“0.63”

Context: Luke

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · lithiumTonnes: 2600000Grade: 0.68Grade Unit: %Contained Metal: 17800Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:b2ac257e6179e8a831a1
Deposit or zone
Luke
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
2600000
Grade
0.68
Grade Unit
%
Contained Metal
17800
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Luke Inferred Mineral Resource of 2.6 Mt at 0.68% Li2O provides an estimate of potential, but with lower geological confidence, and a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“2.6”

Context: Luke

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · tantalumTonnes: 2600000Grade: 64Grade Unit: ppmContained Metal: 366100Contained Unit: lbView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:b2ac257e6179e8a831a1
Deposit or zone
Luke
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
2600000
Grade
64
Grade Unit
ppm
Contained Metal
366100
Contained Unit
lb
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Luke Inferred Mineral Resource includes 64 ppm Ta2O5, indicating potential for tantalum by-product, but with lower geological confidence, and a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“64”

Context: Luke

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · iron_oreTonnes: 2600000Grade: 0.48Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:b2ac257e6179e8a831a1
Deposit or zone
Luke
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
2600000
Grade
0.48
Grade Unit
%
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Luke Inferred Mineral Resource includes 0.48% Fe2O3, which is a deleterious element, and has lower geological confidence, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource
  • Deleterious Elements Present

Evidence · table

“0.48”

Context: Luke

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · lithiumTonnes: 7300000Grade: 0.78Grade Unit: %Contained Metal: 56800Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:bcb9d704ba55635213f2
Deposit or zone
Chewy
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
7300000
Grade
0.78
Grade Unit
%
Contained Metal
56800
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Chewy Indicated Mineral Resource of 7.3 Mt at 0.78% Li2O provides a high-confidence estimate for project planning, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“7.3”

Context: Chewy

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · tantalumTonnes: 7300000Grade: 51Grade Unit: ppmContained Metal: 817700Contained Unit: lbView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:bcb9d704ba55635213f2
Deposit or zone
Chewy
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
7300000
Grade
51
Grade Unit
ppm
Contained Metal
817700
Contained Unit
lb
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Chewy Indicated Mineral Resource includes 51 ppm Ta2O5, indicating tantalum as a potential by-product, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“51”

Context: Chewy

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · iron_oreTonnes: 7300000Grade: 0.78Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:bcb9d704ba55635213f2
Deposit or zone
Chewy
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
7300000
Grade
0.78
Grade Unit
%
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Chewy Indicated Mineral Resource includes 0.78% Fe2O3, which is a deleterious element that needs to be managed.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Deleterious Elements Present

Evidence · table

“0.78”

Context: Chewy

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · lithiumTonnes: 1600000Grade: 0.54Grade Unit: %Contained Metal: 8600Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:113b13f4c62ef82f91ca
Deposit or zone
Chewy
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1600000
Grade
0.54
Grade Unit
%
Contained Metal
8600
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Chewy Inferred Mineral Resource of 1.6 Mt at 0.54% Li2O provides an estimate of potential, but with lower geological confidence, and a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“1.6”

Context: Chewy

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · tantalumTonnes: 1600000Grade: 40Grade Unit: ppmContained Metal: 140100Contained Unit: lbView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:113b13f4c62ef82f91ca
Deposit or zone
Chewy
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1600000
Grade
40
Grade Unit
ppm
Contained Metal
140100
Contained Unit
lb
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Chewy Inferred Mineral Resource includes 40 ppm Ta2O5, indicating potential for tantalum by-product, but with lower geological confidence, and a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“40”

Context: Chewy

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · iron_oreTonnes: 1600000Grade: 0.77Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:113b13f4c62ef82f91ca
Deposit or zone
Chewy
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1600000
Grade
0.77
Grade Unit
%
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Chewy Inferred Mineral Resource includes 0.77% Fe2O3, which is a deleterious element, and has lower geological confidence, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource
  • Deleterious Elements Present

Evidence · table

“0.77”

Context: Chewy

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · lithiumTonnes: 800000Grade: 0.66Grade Unit: %Contained Metal: 5200Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:bd07286449d70cbc8f8d
Deposit or zone
Han
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
800000
Grade
0.66
Grade Unit
%
Contained Metal
5200
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Han Indicated Mineral Resource of 0.8 Mt at 0.66% Li2O provides a high-confidence estimate for project planning, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“0.8”

Context: Han

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · tantalumTonnes: 800000Grade: 59Grade Unit: ppmContained Metal: 102000Contained Unit: lbView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:bd07286449d70cbc8f8d
Deposit or zone
Han
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
800000
Grade
59
Grade Unit
ppm
Contained Metal
102000
Contained Unit
lb
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Han Indicated Mineral Resource includes 59 ppm Ta2O5, indicating tantalum as a potential by-product, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“59”

Context: Han

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · iron_oreTonnes: 800000Grade: 1.25Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:bd07286449d70cbc8f8d
Deposit or zone
Han
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
800000
Grade
1.25
Grade Unit
%
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Han Indicated Mineral Resource includes 1.25% Fe2O3, which is a deleterious element that needs to be managed.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Deleterious Elements Present

Evidence · table

“1.25”

Context: Han

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · lithiumTonnes: 200000Grade: 0.42Grade Unit: %Contained Metal: 900Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:3eb4c3458ec3d5d13428
Deposit or zone
Han
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
200000
Grade
0.42
Grade Unit
%
Contained Metal
900
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Han Inferred Mineral Resource of 0.2 Mt at 0.42% Li2O provides an estimate of potential, but with lower geological confidence, and a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“0.2”

Context: Han

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · tantalumTonnes: 200000Grade: 58Grade Unit: ppmContained Metal: 27100Contained Unit: lbView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:3eb4c3458ec3d5d13428
Deposit or zone
Han
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
200000
Grade
58
Grade Unit
ppm
Contained Metal
27100
Contained Unit
lb
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Han Inferred Mineral Resource includes 58 ppm Ta2O5, indicating potential for tantalum by-product, but with lower geological confidence, and a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“58”

Context: Han

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · iron_oreTonnes: 200000Grade: 1.17Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:3eb4c3458ec3d5d13428
Deposit or zone
Han
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
200000
Grade
1.17
Grade Unit
%
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Han Inferred Mineral Resource includes 1.17% Fe2O3, which is a deleterious element, and has lower geological confidence, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource
  • Deleterious Elements Present

Evidence · table

“1.17”

Context: Han

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · lithiumTonnes: 3900000Grade: 0.88Grade Unit: %Contained Metal: 34200Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:b2634eca8d0f02d00c78
Deposit or zone
Hutt
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
3900000
Grade
0.88
Grade Unit
%
Contained Metal
34200
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Hutt Indicated Mineral Resource of 3.9 Mt at 0.88% Li2O provides a high-confidence estimate for project planning, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“3.9”

Context: Hutt

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · tantalumTonnes: 3900000Grade: 46Grade Unit: ppmContained Metal: 391900Contained Unit: lbView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:b2634eca8d0f02d00c78
Deposit or zone
Hutt
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
3900000
Grade
46
Grade Unit
ppm
Contained Metal
391900
Contained Unit
lb
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Hutt Indicated Mineral Resource includes 46 ppm Ta2O5, indicating tantalum as a potential by-product, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“46”

Context: Hutt

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · iron_oreTonnes: 3900000Grade: 1.06Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:b2634eca8d0f02d00c78
Deposit or zone
Hutt
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
3900000
Grade
1.06
Grade Unit
%
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Hutt Indicated Mineral Resource includes 1.06% Fe2O3, which is a deleterious element that needs to be managed.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Deleterious Elements Present

Evidence · table

“1.06”

Context: Hutt

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · lithiumTonnes: 1400000Grade: 0.59Grade Unit: %Contained Metal: 8300Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:4467e727c871764276ac
Deposit or zone
Hutt
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1400000
Grade
0.59
Grade Unit
%
Contained Metal
8300
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Hutt Inferred Mineral Resource of 1.4 Mt at 0.59% Li2O provides an estimate of potential, but with lower geological confidence, and a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“1.4”

Context: Hutt

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · tantalumTonnes: 1400000Grade: 52Grade Unit: ppmContained Metal: 161300Contained Unit: lbView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:4467e727c871764276ac
Deposit or zone
Hutt
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1400000
Grade
52
Grade Unit
ppm
Contained Metal
161300
Contained Unit
lb
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Hutt Inferred Mineral Resource includes 52 ppm Ta2O5, indicating potential for tantalum by-product, but with lower geological confidence, and a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“52”

Context: Hutt

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · iron_oreTonnes: 1400000Grade: 1.52Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:4467e727c871764276ac
Deposit or zone
Hutt
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
1400000
Grade
1.52
Grade Unit
%
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Hutt Inferred Mineral Resource includes 1.52% Fe2O3, which is a deleterious element, and has lower geological confidence, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource
  • Deleterious Elements Present

Evidence · table

“1.52”

Context: Hutt

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · lithiumTonnes: 300000Grade: 0.73Grade Unit: %Contained Metal: 2300Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:a51c6d1dba3be2982862
Deposit or zone
B. Crumbs
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
300000
Grade
0.73
Grade Unit
%
Contained Metal
2300
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The B. Crumbs Inferred Mineral Resource of 0.3 Mt at 0.73% Li2O provides an estimate of potential, but with lower geological confidence, and a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“0.3”

Context: B. Crumbs

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · tantalumTonnes: 300000Grade: 373Grade Unit: ppmContained Metal: 264000Contained Unit: lbView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:a51c6d1dba3be2982862
Deposit or zone
B. Crumbs
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
300000
Grade
373
Grade Unit
ppm
Contained Metal
264000
Contained Unit
lb
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The B. Crumbs Inferred Mineral Resource includes 373 ppm Ta2O5, indicating potential for tantalum by-product, but with lower geological confidence, and a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“373”

Context: B. Crumbs

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · iron_oreTonnes: 300000Grade: 0.79Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:a51c6d1dba3be2982862
Deposit or zone
B. Crumbs
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
300000
Grade
0.79
Grade Unit
%
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The B. Crumbs Inferred Mineral Resource includes 0.79% Fe2O3, which is a deleterious element, and has lower geological confidence, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource
  • Deleterious Elements Present

Evidence · table

“0.79”

Context: B. Crumbs

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · lithiumTonnes: 100000Grade: 0.42Grade Unit: %Contained Metal: 200Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:a65949842cbaf312d8be
Deposit or zone
TabbaTabba
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
100000
Grade
0.42
Grade Unit
%
Contained Metal
200
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The TabbaTabba Indicated Mineral Resource of 0.1 Mt at 0.42% Li2O provides a high-confidence estimate for project planning, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“0.1”

Context: TabbaTabba

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · tantalumTonnes: 100000Grade: 216Grade Unit: ppmContained Metal: 23900Contained Unit: lbView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:a65949842cbaf312d8be
Deposit or zone
TabbaTabba
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
100000
Grade
216
Grade Unit
ppm
Contained Metal
23900
Contained Unit
lb
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The TabbaTabba Indicated Mineral Resource includes 216 ppm Ta2O5, indicating tantalum as a potential by-product, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“216”

Context: TabbaTabba

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · iron_oreTonnes: 100000Grade: 0.88Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:a65949842cbaf312d8be
Deposit or zone
TabbaTabba
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
100000
Grade
0.88
Grade Unit
%
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The TabbaTabba Indicated Mineral Resource includes 0.88% Fe2O3, which is a deleterious element that needs to be managed.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Deleterious Elements Present

Evidence · table

“0.88”

Context: TabbaTabba

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · lithiumTonnes: 84000000Grade: 0.9Grade Unit: %Contained Metal: 754000Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:f3a8827a4dddfc0ffbc6
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
84000000
Grade
0.9
Grade Unit
%
Contained Metal
754000
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The combined Indicated Mineral Resource of 84.0 Mt at 0.90% Li2O provides a large, high-confidence estimate for project planning, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“84.0”

Context: Combined

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · tantalumTonnes: 84000000Grade: 66Grade Unit: ppmContained Metal: 12222100Contained Unit: lbView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:f3a8827a4dddfc0ffbc6
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
84000000
Grade
66
Grade Unit
ppm
Contained Metal
12222100
Contained Unit
lb
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The combined Indicated Mineral Resource includes 66 ppm Ta2O5, indicating tantalum as a potential by-product, with a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Evidence · table

“66”

Context: Combined

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedTabba Tabba · iron_oreTonnes: 84000000Grade: 0.65Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:f3a8827a4dddfc0ffbc6
Mining method
combined
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
84000000
Grade
0.65
Grade Unit
%
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The combined Indicated Mineral Resource includes 0.65% Fe2O3, which is a deleterious element that needs to be managed.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Deleterious Elements Present

Evidence · table

“0.65”

Context: Combined

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · lithiumTonnes: 6500000Grade: 0.63Grade Unit: %Contained Metal: 40500Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:ad62baa0f3fe2a34aa98
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
6500000
Grade
0.63
Grade Unit
%
Contained Metal
40500
Contained Unit
t
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The combined Inferred Mineral Resource of 6.5 Mt at 0.63% Li2O provides an estimate of potential, but with lower geological confidence, and a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“6.5”

Context: Combined

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · tantalumTonnes: 6500000Grade: 70Grade Unit: ppmContained Metal: 995500Contained Unit: lbView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:ad62baa0f3fe2a34aa98
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
6500000
Grade
70
Grade Unit
ppm
Contained Metal
995500
Contained Unit
lb
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The combined Inferred Mineral Resource includes 70 ppm Ta2O5, indicating potential for tantalum by-product, but with lower geological confidence, and a clear cut-off grade.

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Evidence · table

“70”

Context: Combined

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredTabba Tabba · iron_oreTonnes: 6500000Grade: 0.83Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Region
australia_wa
Reported Region
Western Australia
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Lauritz Barnes, Torrin Rowe
Resource group id
resource:ad62baa0f3fe2a34aa98
Mining method
combined
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
6500000
Grade
0.83
Grade Unit
%
Cutoff Grade
0.3
Cutoff Unit
% Li2O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Positive factors

  • JORC Compliant
  • QP/CP Signed
  • Cut-off Disclosed

Negative factors

  • Inferred Resource

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.