# WC8: DFS - Investor Presentation

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af

Original source: https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03157044

Publisher: asx

Original announcement: 2026-10-25T23:30:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-10-26T00:16:11.366Z

Atlas analysis updated: 2026-10-26T00:16:11.366Z

- Company: Wildcat Resources Limited

- Ticker: WC8

- Exchange: ASX

- Region: Western Australia

- Primary commodity: Lithium

- Secondary commodities: Tantalum, Iron ore

- Document categories: Other, Resource update, Metallurgy, Drill results

- Extracted: 2026-10-26 00:10:51 UTC

Narrative sentiment: 0.80 · Bullish

## Minestarters Atlas summary

Wildcat Resources Limited has released a Definitive Feasibility Study \(DFS\) for its Tabba Tabba Lithium Project, outlining robust economics with a post-tax NPV8 of A$1.5 billion and an IRR of 28.4%. The study accelerates Stage 2 production to ~600ktpa by Year 3, significantly improving cash flow. The project benefits from a high-confidence 73.5 Mt Mineral Resource \(94% Indicated\) and a 48.3 Mt Probable Ore Reserve, supported by strong metallurgical recoveries of 75.7% Li2O.

Reasoning: The Definitive Feasibility Study for the Tabba Tabba project demonstrates robust economics, accelerated production, and a high-confidence resource base, positioning it as a globally significant lithium project.

- Positive factor: Strong NPV and IRR

- Positive factor: Accelerated production timeline

- Positive factor: Competitive capital intensity

- Positive factor: High Li2O recovery

- Positive factor: High confidence resource \(94% Indicated\)

- Positive factor: Substantial Probable Ore Reserve

- Positive factor: QP/CP signed for resource and reserve estimates

- Positive factor: Clear comparison to prior PFS

- Positive factor: Potential for additional value from petalite and tantalum

- Positive factor: Strategic location in Pilbara with existing infrastructure

- Negative factor: Increased pre-production CAPEX compared to PFS

- Negative factor: Slight increase in AISC compared to PFS

- Negative factor: Payback period slightly longer in combined case

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 30

## Classification and evidence

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: The document is a Definitive Feasibility Study \(DFS\) investor presentation, providing detailed economic and technical parameters to support project development.

Evidence · text

> Definitive Feasibility Study

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: The document includes Competent Person's Statements for Exploration Results, Open Pit Ore Reserves, Underground Ore Reserves, and Mineral Resources, with named individuals who are members of recognized professional associations.

Evidence · text

> Competent Person’s Statements

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: Footnote 1 on page 61 states 'Tabba Tabba JORC \(2012\) Mineral Resource as at April 2026'.

Evidence · text

> JORC \(2012\) Mineral Resource

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The Mineral Resource includes 69.1 Mt at 1.01% Li2O in the Indicated category, representing 94% of the total resource.

Evidence · table

> Indicated

Context: 69.1

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The Ore Reserve includes 48.3 Mt at 0.97% Li2O in the Probable category.

Evidence · table

> Probable

Context: 38.1

**Tonnage Growth**

Polarity: positive

Definition: Significant tonnage increase \(≥15%\) vs prior estimate with grade maintained or improved.

Why it applies: The DFS accelerates production, bringing Stage 2 \(600ktpa\) forward by 4 years, leading to ~1Mt of spodumene concentrate production brought forward by 2035 compared to the PFS.

Evidence · text

> + ~1Mt SPOD CONC. Production brought forward by 2035

**High Recovery**

Polarity: positive

Definition: Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: Metallurgical testwork achieved 75.7% Li2O recovery, which is strong for a flotation processing route.

Evidence · text

> 75.7% Metallurgical testwork recovery

**Pilot Scale Complete**

Polarity: positive

Definition: Pilot or demonstration plant testing completed under continuous operation.

Why it applies: DFS metallurgical testwork involved processing 5.1 tonnes of cumulative diamond core, indicating pilot-scale or extensive bulk testwork.

Evidence · text

> 5.1 Tonnes CUMULATIVE DIAMOND CORE PROCESSED IN TESTWORK

**Mill Route**

Polarity: neutral

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: The processing flowsheet is 100% flotation, which is a conventional mill route.

Evidence · text

> 100% Flotation of Ore

**Apparent Width Only**

Polarity: negative

Story-specific tag

Definition: Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Several drill intercepts from Bolt Cutter are reported with 'est. true width' but without a numerical value, indicating that only downhole length is explicitly stated.

Evidence · text

> \(est. true width\)

## Extracted facts

Stored fact records: 28. Some facts used in scoring do not have a stored record.

## Drill Results (5)

### BCRC002

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-drill-facts-24)

Bolt Cutter · lithium

#### Identity

- Hole ID: BCRC002
- Project: Bolt Cutter
- Commodity: lithium
- Region: australia
- Reported Region: australia
- Ticker: WC8

#### Geometry

- Grade: 1.7
- Grade Unit: %
- Intercept: 20 m
- True Width: 12 m
- From: 43 m
- To: 63 m
- Intercept Depth: 43 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: BCRC002:43-63

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: This intercept from the Bolt Cutter project shows good grade and width, indicating potential for resource growth.

- Positive factor: Strong grade

- Positive factor: Good intercept length

- Positive factor: True Width Disclosed

Evidence · text

> 20.0m @ 1.70% Li2O from 43.0m \(BCRC002\) \(12.0m est. true width\)

#### Tags used in scoring

**True Width Disclosed**

Polarity: positive

Definition: Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true\_width\_m is 12

**No QA/QC Disclosure**

Polarity: negative

Definition: Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc\_disclosed is not true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

### BCDD001

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-drill-facts-25)

Bolt Cutter · lithium

#### Identity

- Hole ID: BCDD001
- Project: Bolt Cutter
- Commodity: lithium
- Region: australia
- Reported Region: australia
- Ticker: WC8

#### Geometry

- Grade: 2.02
- Grade Unit: %
- Intercept: 12.8 m
- From: 45.3 m
- To: 58.1 m
- Intercept Depth: 45.3 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: BCDD001:45.3-58.1

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: A high-grade intercept from Bolt Cutter indicates strong mineralization, contributing to the project's potential.

- Positive factor: High grade

- Positive factor: Good intercept length

- Negative factor: Apparent Width Only

Evidence · text

> 12.8m @ 2.02% Li2O from 45.3m \(BCDD001\) \(est. true width\)

#### Tags used in scoring

**No QA/QC Disclosure**

Polarity: negative

Definition: Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc\_disclosed is not true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

### BCRC034

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-drill-facts-26)

Bolt Cutter · lithium

#### Identity

- Hole ID: BCRC034
- Project: Bolt Cutter
- Commodity: lithium
- Region: australia
- Reported Region: australia
- Ticker: WC8

#### Geometry

- Grade: 1.65
- Grade Unit: %
- Intercept: 12 m
- From: 90 m
- To: 102 m
- Intercept Depth: 90 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: BCRC034:90-102

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: This intercept from Bolt Cutter shows good grade and width at depth, suggesting continuity of mineralization.

- Positive factor: Strong grade

- Positive factor: Good intercept length

- Negative factor: Apparent Width Only

Evidence · text

> 12m @ 1.65% Li2O from 90m \(BCRC034\) \(est. true width\)

#### Tags used in scoring

**No QA/QC Disclosure**

Polarity: negative

Definition: Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc\_disclosed is not true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

### BCRC003

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-drill-facts-27)

Bolt Cutter · lithium

#### Identity

- Hole ID: BCRC003
- Project: Bolt Cutter
- Commodity: lithium
- Region: australia
- Reported Region: australia
- Ticker: WC8

#### Geometry

- Grade: 1.3
- Grade Unit: %
- Intercept: 12 m
- From: 39 m
- To: 51 m
- Intercept Depth: 39 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: BCRC003:39-51

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: A solid intercept from Bolt Cutter contributes to the understanding of the project's mineralization.

- Positive factor: Good intercept length

- Negative factor: Apparent Width Only

Evidence · text

> 12.0m @ 1.30% Li2O from 39.0m \(BCRC003\) \(est. true width\)

#### Tags used in scoring

**No QA/QC Disclosure**

Polarity: negative

Definition: Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc\_disclosed is not true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

### BCRC007

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-drill-facts-28)

Bolt Cutter · lithium

#### Identity

- Hole ID: BCRC007
- Project: Bolt Cutter
- Commodity: lithium
- Region: australia
- Reported Region: australia
- Ticker: WC8

#### Geometry

- Grade: 1.25
- Grade Unit: %
- Intercept: 14 m
- From: 40 m
- To: 54 m
- Intercept Depth: 40 m

#### Classification

- Program: exploration
- Sample Type: drill
- Group ID: BCRC007:40-54

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: This intercept from Bolt Cutter adds to the known mineralization, supporting the project's exploration potential.

- Positive factor: Good intercept length

- Negative factor: Apparent Width Only

Evidence · text

> 14.0m @ 1.25% Li2O from 40.0m \(BCRC007\) \(est. true width\)

#### Tags used in scoring

**No QA/QC Disclosure**

Polarity: negative

Definition: Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc\_disclosed is not true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

## Resource Estimates (15)

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-resource-facts-5)

Tabba Tabba · lithium

#### Identity

- Project: Tabba Tabba
- Commodity: lithium
- Ticker: WC8

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
- Resource group id: resource:064318cf9ea155827eaf

#### Resource Data

- Category: indicated
- Tonnes: 69100000
- Grade: 1.01
- Grade Unit: %
- Contained Metal: 698400
- Contained Unit: t
- Cutoff Grade: 0.45
- Cutoff Unit: % Li₂O

#### Prior Estimate

- Resource Date: 2026-04-01

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The Indicated Mineral Resource represents a high-confidence estimate, forming a strong basis for the DFS and future development.

- Positive factor: High confidence category \(Indicated\)

- Positive factor: Significant tonnage and contained metal

- Positive factor: QP/CP Signed

- Positive factor: JORC Compliant

Evidence · table

> 1.01

Context: 69.1

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-resource-facts-6)

Tabba Tabba · tantalum

#### Identity

- Project: Tabba Tabba
- Commodity: tantalum
- Ticker: WC8

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
- Resource group id: resource:064318cf9ea155827eaf

#### Resource Data

- Category: indicated
- Tonnes: 69100000
- Grade: 64
- Grade Unit: ppm
- Cutoff Grade: 0.45
- Cutoff Unit: % Li₂O

#### Prior Estimate

- Resource Date: 2026-04-01

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The Indicated Mineral Resource for tantalum provides additional value potential within the project, contributing to the overall resource base.

- Positive factor: High confidence category \(Indicated\)

- Positive factor: QP/CP Signed

- Positive factor: JORC Compliant

Evidence · table

> 64

Context: 69.1

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-resource-facts-7)

Tabba Tabba · iron\_ore

#### Identity

- Project: Tabba Tabba
- Commodity: iron\_ore
- Ticker: WC8

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
- Resource group id: resource:064318cf9ea155827eaf

#### Resource Data

- Category: indicated
- Tonnes: 69100000
- Grade: 0.64
- Grade Unit: %
- Cutoff Grade: 0.45
- Cutoff Unit: % Li₂O

#### Prior Estimate

- Resource Date: 2026-04-01

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The Indicated Mineral Resource for iron provides additional geological context and potential byproduct value.

- Positive factor: High confidence category \(Indicated\)

- Positive factor: QP/CP Signed

- Positive factor: JORC Compliant

Evidence · table

> 0.64

Context: 69.1

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-resource-facts-8)

Tabba Tabba · lithium

#### Identity

- Project: Tabba Tabba
- Commodity: lithium
- Ticker: WC8

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
- Resource group id: resource:ae411e728bd49a99de85

#### Resource Data

- Category: inferred
- Tonnes: 4400000
- Grade: 0.75
- Grade Unit: %
- Contained Metal: 32800
- Contained Unit: t
- Cutoff Grade: 0.45
- Cutoff Unit: % Li₂O

#### Prior Estimate

- Resource Date: 2026-04-01

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The Inferred Mineral Resource adds to the project's overall potential but requires further drilling to upgrade confidence.

- Positive factor: Adds to overall resource base

- Positive factor: QP/CP Signed

- Positive factor: JORC Compliant

- Negative factor: Lower confidence category \(Inferred\)

Evidence · table

> 0.75

Context: 4.4

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-resource-facts-9)

Tabba Tabba · tantalum

#### Identity

- Project: Tabba Tabba
- Commodity: tantalum
- Ticker: WC8

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
- Resource group id: resource:ae411e728bd49a99de85

#### Resource Data

- Category: inferred
- Tonnes: 4400000
- Grade: 74
- Grade Unit: ppm
- Cutoff Grade: 0.45
- Cutoff Unit: % Li₂O

#### Prior Estimate

- Resource Date: 2026-04-01

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The Inferred Mineral Resource for tantalum contributes to the project's overall potential but requires further work to increase confidence.

- Positive factor: Adds to overall resource base

- Positive factor: QP/CP Signed

- Positive factor: JORC Compliant

- Negative factor: Lower confidence category \(Inferred\)

Evidence · table

> 74

Context: 4.4

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-resource-facts-10)

Tabba Tabba · iron\_ore

#### Identity

- Project: Tabba Tabba
- Commodity: iron\_ore
- Ticker: WC8

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
- Resource group id: resource:ae411e728bd49a99de85

#### Resource Data

- Category: inferred
- Tonnes: 4400000
- Grade: 0.79
- Grade Unit: %
- Cutoff Grade: 0.45
- Cutoff Unit: % Li₂O

#### Prior Estimate

- Resource Date: 2026-04-01

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The Inferred Mineral Resource for iron provides additional geological context but requires further work to increase confidence.

- Positive factor: Adds to overall resource base

- Positive factor: QP/CP Signed

- Positive factor: JORC Compliant

- Negative factor: Lower confidence category \(Inferred\)

Evidence · table

> 0.79

Context: 4.4

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-resource-facts-11)

Tabba Tabba · lithium

#### Identity

- Project: Tabba Tabba
- Commodity: lithium
- Ticker: WC8

#### Resource scope

- Estimate type: reserve
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
- Resource group id: resource:d97c8310ff799e2012ab

#### Resource Data

- Category: probable
- Tonnes: 48300000
- Grade: 0.97
- Grade Unit: %
- Contained Metal: 467
- Contained Unit: kt

#### Prior Estimate

- Resource Date: 2026-01-01

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The Probable Ore Reserve provides a strong foundation for the project's economic viability and mine planning.

- Positive factor: Substantial Ore Reserve

- Positive factor: High confidence category \(Probable\)

- Positive factor: QP/CP Signed

- Positive factor: JORC Compliant

Evidence · table

> 0.97

Context: 48.3

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-resource-facts-12)

Tabba Tabba · tantalum

#### Identity

- Project: Tabba Tabba
- Commodity: tantalum
- Ticker: WC8

#### Resource scope

- Estimate type: reserve
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
- Resource group id: resource:d97c8310ff799e2012ab

#### Resource Data

- Category: probable
- Tonnes: 48300000
- Grade: 60.2
- Grade Unit: ppm

#### Prior Estimate

- Resource Date: 2026-01-01

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The Probable Ore Reserve for tantalum adds to the project's overall economic potential.

- Positive factor: Substantial Ore Reserve

- Positive factor: High confidence category \(Probable\)

- Positive factor: QP/CP Signed

- Positive factor: JORC Compliant

Evidence · table

> 60.2

Context: 48.3

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-resource-facts-13)

Tabba Tabba · iron\_ore

#### Identity

- Project: Tabba Tabba
- Commodity: iron\_ore
- Ticker: WC8

#### Resource scope

- Estimate type: reserve
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
- Resource group id: resource:d97c8310ff799e2012ab

#### Resource Data

- Category: probable
- Tonnes: 48300000
- Grade: 1.17
- Grade Unit: %

#### Prior Estimate

- Resource Date: 2026-01-01

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The Probable Ore Reserve for iron provides additional geological context and potential byproduct value.

- Positive factor: Substantial Ore Reserve

- Positive factor: High confidence category \(Probable\)

- Positive factor: QP/CP Signed

- Positive factor: JORC Compliant

Evidence · table

> 1.17

Context: 48.3

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-resource-facts-14)

Tabba Tabba · lithium

#### Identity

- Project: Tabba Tabba
- Commodity: lithium
- Ticker: WC8

#### Resource scope

- Estimate type: reserve
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
- Resource group id: resource:5fa17109b407a00e9d73

#### Resource Data

- Category: probable
- Tonnes: 38100000
- Grade: 0.99
- Grade Unit: %
- Contained Metal: 378
- Contained Unit: kt

#### Prior Estimate

- Resource Date: 2026-01-01

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The open pit Probable Ore Reserve forms the majority of the project's initial mine plan, indicating strong economic viability.

- Positive factor: Significant open pit component of reserve

- Positive factor: High confidence category \(Probable\)

- Positive factor: QP/CP Signed

- Positive factor: JORC Compliant

Evidence · table

> 0.99

Context: 38.1

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-resource-facts-15)

Tabba Tabba · tantalum

#### Identity

- Project: Tabba Tabba
- Commodity: tantalum
- Ticker: WC8

#### Resource scope

- Estimate type: reserve
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
- Resource group id: resource:5fa17109b407a00e9d73

#### Resource Data

- Category: probable
- Tonnes: 38100000
- Grade: 62.4
- Grade Unit: ppm

#### Prior Estimate

- Resource Date: 2026-01-01

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The open pit Probable Ore Reserve for tantalum contributes to the project's overall economic potential.

- Positive factor: Significant open pit component of reserve

- Positive factor: High confidence category \(Probable\)

- Positive factor: QP/CP Signed

- Positive factor: JORC Compliant

Evidence · table

> 62.4

Context: 38.1

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-resource-facts-16)

Tabba Tabba · iron\_ore

#### Identity

- Project: Tabba Tabba
- Commodity: iron\_ore
- Ticker: WC8

#### Resource scope

- Estimate type: reserve
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
- Resource group id: resource:5fa17109b407a00e9d73

#### Resource Data

- Category: probable
- Tonnes: 38100000
- Grade: 1.07
- Grade Unit: %

#### Prior Estimate

- Resource Date: 2026-01-01

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The open pit Probable Ore Reserve for iron provides additional geological context and potential byproduct value.

- Positive factor: Significant open pit component of reserve

- Positive factor: High confidence category \(Probable\)

- Positive factor: QP/CP Signed

- Positive factor: JORC Compliant

Evidence · table

> 1.07

Context: 38.1

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-resource-facts-17)

Tabba Tabba · lithium

#### Identity

- Project: Tabba Tabba
- Commodity: lithium
- Ticker: WC8

#### Resource scope

- Estimate type: reserve
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
- Resource group id: resource:602f0d8f34a60fb1614e

#### Resource Data

- Category: probable
- Tonnes: 10200000
- Grade: 0.94
- Grade Unit: %
- Contained Metal: 90
- Contained Unit: kt

#### Prior Estimate

- Resource Date: 2026-01-01

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The underground Probable Ore Reserve provides additional ore sources and extends the project's mine life.

- Positive factor: Adds to overall reserve base

- Positive factor: High confidence category \(Probable\)

- Positive factor: QP/CP Signed

- Positive factor: JORC Compliant

Evidence · table

> 0.94

Context: 10.2

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-resource-facts-18)

Tabba Tabba · tantalum

#### Identity

- Project: Tabba Tabba
- Commodity: tantalum
- Ticker: WC8

#### Resource scope

- Estimate type: reserve
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
- Resource group id: resource:602f0d8f34a60fb1614e

#### Resource Data

- Category: probable
- Tonnes: 10200000
- Grade: 51.9
- Grade Unit: ppm

#### Prior Estimate

- Resource Date: 2026-01-01

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The underground Probable Ore Reserve for tantalum contributes to the project's overall economic potential.

- Positive factor: Adds to overall reserve base

- Positive factor: High confidence category \(Probable\)

- Positive factor: QP/CP Signed

- Positive factor: JORC Compliant

Evidence · table

> 51.9

Context: 10.2

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-resource-facts-19)

Tabba Tabba · iron\_ore

#### Identity

- Project: Tabba Tabba
- Commodity: iron\_ore
- Ticker: WC8

#### Resource scope

- Estimate type: reserve
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
- Resource group id: resource:602f0d8f34a60fb1614e

#### Resource Data

- Category: probable
- Tonnes: 10200000
- Grade: 1.52
- Grade Unit: %

#### Prior Estimate

- Resource Date: 2026-01-01

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The underground Probable Ore Reserve for iron provides additional geological context and potential byproduct value.

- Positive factor: Adds to overall reserve base

- Positive factor: High confidence category \(Probable\)

- Positive factor: QP/CP Signed

- Positive factor: JORC Compliant

Evidence · table

> 1.52

Context: 10.2

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

## Metallurgical Results (8)

### Fact 1

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-metallurgical-facts-0)

Tabba Tabba · lithium

#### Identity

- Project: Tabba Tabba
- Commodity: lithium
- Ticker: WC8

#### Recovery

- Conc. Grade: 5.5
- Conc. Grade Unit: % Li₂O

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The DFS base case economics for Tabba Tabba show a robust NPV and IRR, indicating a highly viable project with a long mine life and competitive operating costs.

- Positive factor: Strong NPV and IRR

- Positive factor: Competitive operating costs

- Positive factor: Long mine life

- Positive factor: Significant production scale

Evidence · text

> Post-tax NPV8 A$1,503m 28.4% 3.8 years Pre-production Capex A$774m Expansion Capital Year-3 A$53m required Production concentrate SC5.5 279 ktpa Stage 1 ~600 ktpa Stage 2 \(year 3\) Project Life ~15 years Operating costs C1 US$570/t \| AISC US$709/t

### Fact 2

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-metallurgical-facts-2)

Tabba Tabba · lithium

#### Identity

- Project: Tabba Tabba
- Commodity: lithium
- Ticker: WC8

#### Recovery

- Conc. Grade: 5.5
- Conc. Grade Unit: % Li₂O

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The combined case, including petalite and tantalum, significantly enhances the project's economic metrics and production profile, demonstrating additional value upside.

- Positive factor: Higher NPV and IRR compared to spodumene-only case

- Positive factor: Lower operating costs due to byproduct credits

- Positive factor: Increased production scale

- Negative factor: Slightly longer payback period

Evidence · text

> Post-tax NPV8 A$1,65bn 29.4% 4.1 years Pre-production Capex Spodumene A$774m Petalite &amp; Tantalum Capex \(FCF\) A$159m Production Spodumene SC5.5 ~ increase to 657ktpa Petalite SC4.15 ~45ktpa Tantalum ~ 900tpa Project Life ~15 years Combined Operating costs C1 US$534/t \| AISC US$673/t

### Fact 3

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-metallurgical-facts-3)

Tabba Tabba · petalite

#### Identity

- Project: Tabba Tabba
- Commodity: petalite
- Ticker: WC8

#### Recovery

- Conc. Grade: 4.15
- Conc. Grade Unit: % SC4.15

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The inclusion of petalite production in the combined case provides additional revenue streams and contributes to the overall project value.

- Positive factor: Adds to project value

- Positive factor: Diversifies product stream

Evidence · text

> Petalite &amp; Tantalum Capex \(FCF\) A$159m Production Spodumene SC5.5 ~ increase to 657ktpa Petalite SC4.15 ~45ktpa Tantalum ~ 900tpa

### flotation

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-metallurgical-facts-20)

Tabba Tabba · lithium

#### Identity

- Project: Tabba Tabba
- Commodity: lithium
- Ticker: WC8

#### Test Work

- Program Status: detailed
- Test Type: flotation
- Processing Route: 100% Flotation
- Grind P80: 180 µm

#### Recovery

- Recovery: 75.7 %
- Recovery Basis: actual\_test
- Conc. Grade: 5.5
- Conc. Grade Unit: % Li₂O

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The DFS metallurgical testwork achieved a strong lithium recovery of 75.7% via flotation, indicating a robust processing solution.

- Positive factor: High Recovery

- Positive factor: Pilot Scale Complete

- Positive factor: Mill Route

Evidence · text

> 75.7% Metallurgical testwork recovery

#### Tags used in scoring

**Mill Route**

Polarity: neutral

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: processing\_route matches the flotation signal

### flotation

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-metallurgical-facts-21)

Tabba Tabba · lithium

#### Identity

- Project: Tabba Tabba
- Commodity: lithium
- Ticker: WC8

#### Test Work

- Program Status: detailed
- Test Type: flotation
- Processing Route: 100% Flotation
- Grind P80: 180 µm

#### Recovery

- Recovery: 74 %
- Recovery Basis: theoretical
- Conc. Grade: 5.5
- Conc. Grade Unit: % Li₂O

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: The DFS model uses a conservative 74% lithium recovery, which is slightly below the actual testwork results, providing a buffer in economic projections.

- Positive factor: Conservative modelling

- Positive factor: Mill Route

Evidence · text

> 74% LOM model recovery

#### Tags used in scoring

**Mill Route**

Polarity: neutral

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: processing\_route matches the flotation signal

**Theoretical Recovery Only**

Polarity: negative

Definition: Only theoretical or liberation-derived recovery reported, with no actual test result.

Why it applies: recovery\_basis is theoretical

### flotation

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-metallurgical-facts-22)

Tabba Tabba · lithium

#### Identity

- Project: Tabba Tabba
- Commodity: lithium
- Ticker: WC8

#### Test Work

- Program Status: scoping
- Test Type: flotation
- Processing Route: flotation

#### Recovery

- Recovery: 74 %
- Recovery Basis: actual\_test

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: Preliminary testwork confirmed the flotation flowsheet with a 74.0% recovery, providing an early indication of process viability.

- Positive factor: Established flowsheet

- Negative factor: Early stage testwork

Evidence · text

> PRELIMINARY TESTWORK ... AVERAGE RECOVERY 74.0%

#### Tags used in scoring

**Mill Route**

Polarity: neutral

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: processing\_route matches the flotation signal

### flotation

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-metallurgical-facts-23)

Tabba Tabba · lithium

#### Identity

- Project: Tabba Tabba
- Commodity: lithium
- Ticker: WC8

#### Test Work

- Program Status: preliminary
- Test Type: flotation
- Processing Route: flotation

#### Recovery

- Recovery: 74.6 %
- Recovery Basis: actual\_test

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: PFS-level testwork showed a 74.6% recovery, building confidence in the flotation flowsheet and variability response.

- Positive factor: Established flowsheet

- Positive factor: Variability testwork

Evidence · text

> PRELIMINARY FEASIBILITY STUDY ... AVERAGE RECOVERY 74.6%

#### Tags used in scoring

**Mill Route**

Polarity: neutral

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: processing\_route matches the flotation signal

### sighter testwork

[Link to this fact](https://atlas-aws.minestarters.com/news/wc8-dfs-investor-presentation--6591c35c-ab59-450e-87fe-5989740b99af#fact-metallurgical-facts-29)

Bolt Cutter · lithium

#### Identity

- Project: Bolt Cutter
- Commodity: lithium
- Ticker: WC8

#### Test Work

- Test Type: sighter testwork

#### Recovery

- Recovery: 82.5 %
- Recovery Basis: actual\_test
- Conc. Grade: 5.66
- Conc. Grade Unit: % Li2O

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: Sighter testwork for Bolt Cutter shows promising lithium recovery and concentrate grade, indicating good metallurgical characteristics for future development.

- Positive factor: High Recovery

- Positive factor: Good concentrate grade

- Negative factor: Bench Scale Only

Evidence · text

> Sighter testwork delivered an average lithium recovery of 82.5% for a 5.66% Li2O spodumene concentrate

#### Tags used in scoring

**High Recovery**

Polarity: positive

Definition: Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: 82.5% is at or above the exceptional band \(80%\)

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.