WC8: DFS - Investor Presentation

Original announcement by asx on

Company
Wildcat Resources Limited
Ticker
WC8
Exchange
ASX
Region
Western Australia
Primary commodity
Lithium
Secondary commodities
Tantalum, Iron ore
Document categories
Other, Resource update, Metallurgy, Drill results
Extracted
2026-10-26 00:10:51 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Wildcat Resources Limited has released a Definitive Feasibility Study (DFS) for its Tabba Tabba Lithium Project, outlining robust economics with a post-tax NPV8 of A$1.5 billion and an IRR of 28.4%. The study accelerates Stage 2 production to ~600ktpa by Year 3, significantly improving cash flow. The project benefits from a high-confidence 73.5 Mt Mineral Resource (94% Indicated) and a 48.3 Mt Probable Ore Reserve, supported by strong metallurgical recoveries of 75.7% Li2O.

Reasoning: The Definitive Feasibility Study for the Tabba Tabba project demonstrates robust economics, accelerated production, and a high-confidence resource base, positioning it as a globally significant lithium project.

Positive factors

  • Strong NPV and IRR
  • Accelerated production timeline
  • Competitive capital intensity
  • High Li2O recovery
  • High confidence resource (94% Indicated)
  • Substantial Probable Ore Reserve
  • QP/CP signed for resource and reserve estimates
  • Clear comparison to prior PFS
  • Potential for additional value from petalite and tantalum
  • Strategic location in Pilbara with existing infrastructure

Negative factors

  • Increased pre-production CAPEX compared to PFS
  • Slight increase in AISC compared to PFS
  • Payback period slightly longer in combined case

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 30

Atlas analysis — Wildcat Resources Limited: WC8: DFS - Investor Presentation. 1.7 % over 20 m; indicated 69100000 tonnes; 75.7% recovery

Classification and evidence

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: The document is a Definitive Feasibility Study (DFS) investor presentation, providing detailed economic and technical parameters to support project development.

Evidence · text

“Definitive Feasibility Study”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The document includes Competent Person's Statements for Exploration Results, Open Pit Ore Reserves, Underground Ore Reserves, and Mineral Resources, with named individuals who are members of recognized professional associations.

Evidence · text

“Competent Person’s Statements”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: Footnote 1 on page 61 states 'Tabba Tabba JORC (2012) Mineral Resource as at April 2026'.

Evidence · text

“JORC (2012) Mineral Resource”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The Mineral Resource includes 69.1 Mt at 1.01% Li2O in the Indicated category, representing 94% of the total resource.

Evidence · table

“Indicated”

Context: 69.1

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The Ore Reserve includes 48.3 Mt at 0.97% Li2O in the Probable category.

Evidence · table

“Probable”

Context: 38.1

Tonnage Growthpositive

Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.

Why it applies: The DFS accelerates production, bringing Stage 2 (600ktpa) forward by 4 years, leading to ~1Mt of spodumene concentrate production brought forward by 2035 compared to the PFS.

Evidence · text

“+ ~1Mt SPOD CONC. Production brought forward by 2035”

High Recoverypositive

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: Metallurgical testwork achieved 75.7% Li2O recovery, which is strong for a flotation processing route.

Evidence · text

“75.7% Metallurgical testwork recovery”

Pilot Scale Completepositive

Pilot or demonstration plant testing completed under continuous operation.

Why it applies: DFS metallurgical testwork involved processing 5.1 tonnes of cumulative diamond core, indicating pilot-scale or extensive bulk testwork.

Evidence · text

“5.1 Tonnes CUMULATIVE DIAMOND CORE PROCESSED IN TESTWORK”

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: The processing flowsheet is 100% flotation, which is a conventional mill route.

Evidence · text

“100% Flotation of Ore”

Apparent Width Onlynegative · Story-specific tag

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: Several drill intercepts from Bolt Cutter are reported with 'est. true width' but without a numerical value, indicating that only downhole length is explicitly stated.

Evidence · text

“(est. true width)”

Extracted facts

Stored fact records: 28. Some facts used in scoring do not have a stored record.

Drill Results (5)

BCRC002Bolt Cutter · lithiumGrade: 1.7Grade Unit: %Intercept: 20 mView all details
Link to this fact

Identity

Hole ID
BCRC002
Project
Bolt Cutter
Commodity
lithium
Region
australia
Reported Region
australia
Ticker
WC8

Geometry

Grade
1.7
Grade Unit
%
Intercept
20 m
True Width
12 m
From
43 m
To
63 m
Intercept Depth
43 m

Classification

Program
exploration
Sample Type
drill
Group ID
BCRC002:43-63

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: This intercept from the Bolt Cutter project shows good grade and width, indicating potential for resource growth.

Positive factors

  • Strong grade
  • Good intercept length
  • True Width Disclosed

Evidence · text

“20.0m @ 1.70% Li2O from 43.0m (BCRC002) (12.0m est. true width)”

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 12

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

BCDD001Bolt Cutter · lithiumGrade: 2.02Grade Unit: %Intercept: 12.8 mView all details
Link to this fact

Identity

Hole ID
BCDD001
Project
Bolt Cutter
Commodity
lithium
Region
australia
Reported Region
australia
Ticker
WC8

Geometry

Grade
2.02
Grade Unit
%
Intercept
12.8 m
From
45.3 m
To
58.1 m
Intercept Depth
45.3 m

Classification

Program
exploration
Sample Type
drill
Group ID
BCDD001:45.3-58.1

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: A high-grade intercept from Bolt Cutter indicates strong mineralization, contributing to the project's potential.

Positive factors

  • High grade
  • Good intercept length

Negative factors

  • Apparent Width Only

Evidence · text

“12.8m @ 2.02% Li2O from 45.3m (BCDD001) (est. true width)”

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

BCRC034Bolt Cutter · lithiumGrade: 1.65Grade Unit: %Intercept: 12 mView all details
Link to this fact

Identity

Hole ID
BCRC034
Project
Bolt Cutter
Commodity
lithium
Region
australia
Reported Region
australia
Ticker
WC8

Geometry

Grade
1.65
Grade Unit
%
Intercept
12 m
From
90 m
To
102 m
Intercept Depth
90 m

Classification

Program
exploration
Sample Type
drill
Group ID
BCRC034:90-102

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: This intercept from Bolt Cutter shows good grade and width at depth, suggesting continuity of mineralization.

Positive factors

  • Strong grade
  • Good intercept length

Negative factors

  • Apparent Width Only

Evidence · text

“12m @ 1.65% Li2O from 90m (BCRC034) (est. true width)”

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

BCRC003Bolt Cutter · lithiumGrade: 1.3Grade Unit: %Intercept: 12 mView all details
Link to this fact

Identity

Hole ID
BCRC003
Project
Bolt Cutter
Commodity
lithium
Region
australia
Reported Region
australia
Ticker
WC8

Geometry

Grade
1.3
Grade Unit
%
Intercept
12 m
From
39 m
To
51 m
Intercept Depth
39 m

Classification

Program
exploration
Sample Type
drill
Group ID
BCRC003:39-51

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: A solid intercept from Bolt Cutter contributes to the understanding of the project's mineralization.

Positive factors

  • Good intercept length

Negative factors

  • Apparent Width Only

Evidence · text

“12.0m @ 1.30% Li2O from 39.0m (BCRC003) (est. true width)”

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

BCRC007Bolt Cutter · lithiumGrade: 1.25Grade Unit: %Intercept: 14 mView all details
Link to this fact

Identity

Hole ID
BCRC007
Project
Bolt Cutter
Commodity
lithium
Region
australia
Reported Region
australia
Ticker
WC8

Geometry

Grade
1.25
Grade Unit
%
Intercept
14 m
From
40 m
To
54 m
Intercept Depth
40 m

Classification

Program
exploration
Sample Type
drill
Group ID
BCRC007:40-54

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: This intercept from Bolt Cutter adds to the known mineralization, supporting the project's exploration potential.

Positive factors

  • Good intercept length

Negative factors

  • Apparent Width Only

Evidence · text

“14.0m @ 1.25% Li2O from 40.0m (BCRC007) (est. true width)”

Tags used in scoring

No QA/QC Disclosurenegative

Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc_disclosed is not true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

Resource Estimates (15)

indicatedTabba Tabba · lithiumTonnes: 69100000Grade: 1.01Grade Unit: %Contained Metal: 698400Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
Resource group id
resource:064318cf9ea155827eaf

Resource Data

Category
indicated
Tonnes
69100000
Grade
1.01
Grade Unit
%
Contained Metal
698400
Contained Unit
t
Cutoff Grade
0.45
Cutoff Unit
% Li₂O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Indicated Mineral Resource represents a high-confidence estimate, forming a strong basis for the DFS and future development.

Positive factors

  • High confidence category (Indicated)
  • Significant tonnage and contained metal
  • QP/CP Signed
  • JORC Compliant

Evidence · table

“1.01”

Context: 69.1

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedTabba Tabba · tantalumTonnes: 69100000Grade: 64Grade Unit: ppmView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
Resource group id
resource:064318cf9ea155827eaf

Resource Data

Category
indicated
Tonnes
69100000
Grade
64
Grade Unit
ppm
Cutoff Grade
0.45
Cutoff Unit
% Li₂O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Indicated Mineral Resource for tantalum provides additional value potential within the project, contributing to the overall resource base.

Positive factors

  • High confidence category (Indicated)
  • QP/CP Signed
  • JORC Compliant

Evidence · table

“64”

Context: 69.1

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

indicatedTabba Tabba · iron_oreTonnes: 69100000Grade: 0.64Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
Resource group id
resource:064318cf9ea155827eaf

Resource Data

Category
indicated
Tonnes
69100000
Grade
0.64
Grade Unit
%
Cutoff Grade
0.45
Cutoff Unit
% Li₂O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Indicated Mineral Resource for iron provides additional geological context and potential byproduct value.

Positive factors

  • High confidence category (Indicated)
  • QP/CP Signed
  • JORC Compliant

Evidence · table

“0.64”

Context: 69.1

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredTabba Tabba · lithiumTonnes: 4400000Grade: 0.75Grade Unit: %Contained Metal: 32800Contained Unit: tView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
Resource group id
resource:ae411e728bd49a99de85

Resource Data

Category
inferred
Tonnes
4400000
Grade
0.75
Grade Unit
%
Contained Metal
32800
Contained Unit
t
Cutoff Grade
0.45
Cutoff Unit
% Li₂O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Inferred Mineral Resource adds to the project's overall potential but requires further drilling to upgrade confidence.

Positive factors

  • Adds to overall resource base
  • QP/CP Signed
  • JORC Compliant

Negative factors

  • Lower confidence category (Inferred)

Evidence · table

“0.75”

Context: 4.4

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredTabba Tabba · tantalumTonnes: 4400000Grade: 74Grade Unit: ppmView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
Resource group id
resource:ae411e728bd49a99de85

Resource Data

Category
inferred
Tonnes
4400000
Grade
74
Grade Unit
ppm
Cutoff Grade
0.45
Cutoff Unit
% Li₂O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Inferred Mineral Resource for tantalum contributes to the project's overall potential but requires further work to increase confidence.

Positive factors

  • Adds to overall resource base
  • QP/CP Signed
  • JORC Compliant

Negative factors

  • Lower confidence category (Inferred)

Evidence · table

“74”

Context: 4.4

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredTabba Tabba · iron_oreTonnes: 4400000Grade: 0.79Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Ticker
WC8

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
Resource group id
resource:ae411e728bd49a99de85

Resource Data

Category
inferred
Tonnes
4400000
Grade
0.79
Grade Unit
%
Cutoff Grade
0.45
Cutoff Unit
% Li₂O

Prior Estimate

Resource Date
2026-04-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Inferred Mineral Resource for iron provides additional geological context but requires further work to increase confidence.

Positive factors

  • Adds to overall resource base
  • QP/CP Signed
  • JORC Compliant

Negative factors

  • Lower confidence category (Inferred)

Evidence · table

“0.79”

Context: 4.4

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

probableTabba Tabba · lithiumTonnes: 48300000Grade: 0.97Grade Unit: %Contained Metal: 467Contained Unit: ktView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
Resource group id
resource:d97c8310ff799e2012ab

Resource Data

Category
probable
Tonnes
48300000
Grade
0.97
Grade Unit
%
Contained Metal
467
Contained Unit
kt

Prior Estimate

Resource Date
2026-01-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Probable Ore Reserve provides a strong foundation for the project's economic viability and mine planning.

Positive factors

  • Substantial Ore Reserve
  • High confidence category (Probable)
  • QP/CP Signed
  • JORC Compliant

Evidence · table

“0.97”

Context: 48.3

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

probableTabba Tabba · tantalumTonnes: 48300000Grade: 60.2Grade Unit: ppmView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
Resource group id
resource:d97c8310ff799e2012ab

Resource Data

Category
probable
Tonnes
48300000
Grade
60.2
Grade Unit
ppm

Prior Estimate

Resource Date
2026-01-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Probable Ore Reserve for tantalum adds to the project's overall economic potential.

Positive factors

  • Substantial Ore Reserve
  • High confidence category (Probable)
  • QP/CP Signed
  • JORC Compliant

Evidence · table

“60.2”

Context: 48.3

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

probableTabba Tabba · iron_oreTonnes: 48300000Grade: 1.17Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
Resource group id
resource:d97c8310ff799e2012ab

Resource Data

Category
probable
Tonnes
48300000
Grade
1.17
Grade Unit
%

Prior Estimate

Resource Date
2026-01-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The Probable Ore Reserve for iron provides additional geological context and potential byproduct value.

Positive factors

  • Substantial Ore Reserve
  • High confidence category (Probable)
  • QP/CP Signed
  • JORC Compliant

Evidence · table

“1.17”

Context: 48.3

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

probableTabba Tabba · lithiumTonnes: 38100000Grade: 0.99Grade Unit: %Contained Metal: 378Contained Unit: ktView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
Resource group id
resource:5fa17109b407a00e9d73

Resource Data

Category
probable
Tonnes
38100000
Grade
0.99
Grade Unit
%
Contained Metal
378
Contained Unit
kt

Prior Estimate

Resource Date
2026-01-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The open pit Probable Ore Reserve forms the majority of the project's initial mine plan, indicating strong economic viability.

Positive factors

  • Significant open pit component of reserve
  • High confidence category (Probable)
  • QP/CP Signed
  • JORC Compliant

Evidence · table

“0.99”

Context: 38.1

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

probableTabba Tabba · tantalumTonnes: 38100000Grade: 62.4Grade Unit: ppmView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
Resource group id
resource:5fa17109b407a00e9d73

Resource Data

Category
probable
Tonnes
38100000
Grade
62.4
Grade Unit
ppm

Prior Estimate

Resource Date
2026-01-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The open pit Probable Ore Reserve for tantalum contributes to the project's overall economic potential.

Positive factors

  • Significant open pit component of reserve
  • High confidence category (Probable)
  • QP/CP Signed
  • JORC Compliant

Evidence · table

“62.4”

Context: 38.1

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

probableTabba Tabba · iron_oreTonnes: 38100000Grade: 1.07Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
Resource group id
resource:5fa17109b407a00e9d73

Resource Data

Category
probable
Tonnes
38100000
Grade
1.07
Grade Unit
%

Prior Estimate

Resource Date
2026-01-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The open pit Probable Ore Reserve for iron provides additional geological context and potential byproduct value.

Positive factors

  • Significant open pit component of reserve
  • High confidence category (Probable)
  • QP/CP Signed
  • JORC Compliant

Evidence · table

“1.07”

Context: 38.1

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

probableTabba Tabba · lithiumTonnes: 10200000Grade: 0.94Grade Unit: %Contained Metal: 90Contained Unit: ktView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
Resource group id
resource:602f0d8f34a60fb1614e

Resource Data

Category
probable
Tonnes
10200000
Grade
0.94
Grade Unit
%
Contained Metal
90
Contained Unit
kt

Prior Estimate

Resource Date
2026-01-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The underground Probable Ore Reserve provides additional ore sources and extends the project's mine life.

Positive factors

  • Adds to overall reserve base
  • High confidence category (Probable)
  • QP/CP Signed
  • JORC Compliant

Evidence · table

“0.94”

Context: 10.2

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

probableTabba Tabba · tantalumTonnes: 10200000Grade: 51.9Grade Unit: ppmView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
tantalum
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
Resource group id
resource:602f0d8f34a60fb1614e

Resource Data

Category
probable
Tonnes
10200000
Grade
51.9
Grade Unit
ppm

Prior Estimate

Resource Date
2026-01-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The underground Probable Ore Reserve for tantalum contributes to the project's overall economic potential.

Positive factors

  • Adds to overall reserve base
  • High confidence category (Probable)
  • QP/CP Signed
  • JORC Compliant

Evidence · table

“51.9”

Context: 10.2

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

probableTabba Tabba · iron_oreTonnes: 10200000Grade: 1.52Grade Unit: %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
iron_ore
Ticker
WC8

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Torrin Rowe, Jonathon Nortier, Cailli Knievel, Lauritz Barnes
Resource group id
resource:602f0d8f34a60fb1614e

Resource Data

Category
probable
Tonnes
10200000
Grade
1.52
Grade Unit
%

Prior Estimate

Resource Date
2026-01-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The underground Probable Ore Reserve for iron provides additional geological context and potential byproduct value.

Positive factors

  • Adds to overall reserve base
  • High confidence category (Probable)
  • QP/CP Signed
  • JORC Compliant

Evidence · table

“1.52”

Context: 10.2

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Metallurgical Results (8)

Fact 1Tabba Tabba · lithiumView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Ticker
WC8

Recovery

Conc. Grade
5.5
Conc. Grade Unit
% Li₂O

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The DFS base case economics for Tabba Tabba show a robust NPV and IRR, indicating a highly viable project with a long mine life and competitive operating costs.

Positive factors

  • Strong NPV and IRR
  • Competitive operating costs
  • Long mine life
  • Significant production scale

Evidence · text

“Post-tax NPV8 A$1,503m 28.4% 3.8 years Pre-production Capex A$774m Expansion Capital Year-3 A$53m required Production concentrate SC5.5 279 ktpa Stage 1 ~600 ktpa Stage 2 (year 3) Project Life ~15 years Operating costs C1 US$570/t | AISC US$709/t”
Fact 2Tabba Tabba · lithiumView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Ticker
WC8

Recovery

Conc. Grade
5.5
Conc. Grade Unit
% Li₂O

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The combined case, including petalite and tantalum, significantly enhances the project's economic metrics and production profile, demonstrating additional value upside.

Positive factors

  • Higher NPV and IRR compared to spodumene-only case
  • Lower operating costs due to byproduct credits
  • Increased production scale

Negative factors

  • Slightly longer payback period

Evidence · text

“Post-tax NPV8 A$1,65bn 29.4% 4.1 years Pre-production Capex Spodumene A$774m Petalite & Tantalum Capex (FCF) A$159m Production Spodumene SC5.5 ~ increase to 657ktpa Petalite SC4.15 ~45ktpa Tantalum ~ 900tpa Project Life ~15 years Combined Operating costs C1 US$534/t | AISC US$673/t”
Fact 3Tabba Tabba · petaliteView all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
petalite
Ticker
WC8

Recovery

Conc. Grade
4.15
Conc. Grade Unit
% SC4.15

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The inclusion of petalite production in the combined case provides additional revenue streams and contributes to the overall project value.

Positive factors

  • Adds to project value
  • Diversifies product stream

Evidence · text

“Petalite & Tantalum Capex (FCF) A$159m Production Spodumene SC5.5 ~ increase to 657ktpa Petalite SC4.15 ~45ktpa Tantalum ~ 900tpa”
flotationTabba Tabba · lithiumRecovery: 75.7 %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Ticker
WC8

Test Work

Program Status
detailed
Test Type
flotation
Processing Route
100% Flotation
Grind P80
180 µm

Recovery

Recovery
75.7 %
Recovery Basis
actual_test
Conc. Grade
5.5
Conc. Grade Unit
% Li₂O

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The DFS metallurgical testwork achieved a strong lithium recovery of 75.7% via flotation, indicating a robust processing solution.

Positive factors

  • High Recovery
  • Pilot Scale Complete
  • Mill Route

Evidence · text

“75.7% Metallurgical testwork recovery”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

flotationTabba Tabba · lithiumRecovery: 74 %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Ticker
WC8

Test Work

Program Status
detailed
Test Type
flotation
Processing Route
100% Flotation
Grind P80
180 µm

Recovery

Recovery
74 %
Recovery Basis
theoretical
Conc. Grade
5.5
Conc. Grade Unit
% Li₂O

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: The DFS model uses a conservative 74% lithium recovery, which is slightly below the actual testwork results, providing a buffer in economic projections.

Positive factors

  • Conservative modelling
  • Mill Route

Evidence · text

“74% LOM model recovery”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

Theoretical Recovery Onlynegative

Only theoretical or liberation-derived recovery reported, with no actual test result.

Why it applies: recovery_basis is theoretical

flotationTabba Tabba · lithiumRecovery: 74 %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Ticker
WC8

Test Work

Program Status
scoping
Test Type
flotation
Processing Route
flotation

Recovery

Recovery
74 %
Recovery Basis
actual_test

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: Preliminary testwork confirmed the flotation flowsheet with a 74.0% recovery, providing an early indication of process viability.

Positive factors

  • Established flowsheet

Negative factors

  • Early stage testwork

Evidence · text

“PRELIMINARY TESTWORK ... AVERAGE RECOVERY 74.0%”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

flotationTabba Tabba · lithiumRecovery: 74.6 %View all details
Link to this fact

Identity

Project
Tabba Tabba
Commodity
lithium
Ticker
WC8

Test Work

Program Status
preliminary
Test Type
flotation
Processing Route
flotation

Recovery

Recovery
74.6 %
Recovery Basis
actual_test

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: PFS-level testwork showed a 74.6% recovery, building confidence in the flotation flowsheet and variability response.

Positive factors

  • Established flowsheet
  • Variability testwork

Evidence · text

“PRELIMINARY FEASIBILITY STUDY ... AVERAGE RECOVERY 74.6%”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

sighter testworkBolt Cutter · lithiumRecovery: 82.5 %View all details
Link to this fact

Identity

Project
Bolt Cutter
Commodity
lithium
Ticker
WC8

Test Work

Test Type
sighter testwork

Recovery

Recovery
82.5 %
Recovery Basis
actual_test
Conc. Grade
5.66
Conc. Grade Unit
% Li2O

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-25T00:00:00.000Z

Reasoning: Sighter testwork for Bolt Cutter shows promising lithium recovery and concentrate grade, indicating good metallurgical characteristics for future development.

Positive factors

  • High Recovery
  • Good concentrate grade

Negative factors

  • Bench Scale Only

Evidence · text

“Sighter testwork delivered an average lithium recovery of 82.5% for a 5.66% Li2O spodumene concentrate”

Tags used in scoring

High Recoverypositive

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: 82.5% is at or above the exceptional band (80%)

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.