WC1: Quarterly Activities/Appendix 5B Cash Flow Report

Original announcement by asx on

Company
West Cobar Metals Limited
Ticker
WC1
Exchange
ASX
Region
Unavailable
Primary commodity
Unavailable
Secondary commodities
None reported
Document categories
Other, Capital raise, Agreement transaction, Resource update, Metallurgy
Extracted
2026-10-29 22:42:26 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

West Cobar Metals Limited released its quarterly activities report, highlighting ongoing planning for a scandium drilling program at Salazar and progress in metallurgical testwork. The company received an R&D tax refund but discontinued the proposed Baxter acquisition following due diligence. The report also indicated a low cash runway of 1.72 quarters, with no significant new drill results or resource updates reported.

Reasoning: Routine quarterly activities report with financial updates, including a tax refund and a discontinued acquisition. While exploration planning and metallurgical work are progressing, no new material drill results or resource updates were announced, and the company faces a short cash runway.

Positive factors

  • R&D tax refund received
  • Planned scandium drilling at Newmont and Benriach
  • Metallurgical testwork progressing for scandium

Negative factors

  • Low cash runway of 1.72 quarters
  • Proposed Baxter acquisition discontinued after due diligence
  • No significant drill results reported from Blind Freddie
  • Relinquishment and reduction of tenements to minimize holding expense
  • Resource estimates are historical restatements, not new updates
  • Metallurgical testwork results are historical and preliminary (bench scale only)

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 16

Atlas analysis — West Cobar Metals Limited: WC1: Quarterly Activities/Appendix 5B Cash Flow Report. inferred 15000000 tonnes; 81% recovery

Classification and evidence

Inferred Resourcenegative · Story-specific tag

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The resource estimates for Scandium, Rare Earth Elements, TiO2, Gallium, Alumina, Copper, Antimony, and Silver are all classified as Inferred.

Evidence · text

“Scandium: 15 Mt of 153 ppm Sc2O3 (Inferred)”

All Inferrednegative · Story-specific tag

100% of resource is Inferred category — very early stage, no engineering confidence.

Why it applies: The resource estimates for Scandium, TiO2, Gallium, and Alumina are entirely in the Inferred category.

Evidence · text

“Scandium: 15 Mt of 153 ppm Sc2O3 (Inferred)”

QP/CP Signedpositive · Story-specific tag

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The resource estimates are stated to be in accordance with JORC Code (2012 edition) and have a Competent Person named and consented.

Evidence · text

“The Mineral Resources for the Bulla Park deposit were reported by West Cobar in accordance with ASX Listing Rule 5.8 and the JORC Code (2012 edition) in the announcement released to the ASX on 14 April 2025 (Competent Person: Mr Jeremy Clark), and for which the consent of the Competent Person was obtained.”

JORC Compliantpositive · Story-specific tag

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The resource estimates are reported in accordance with the JORC Code (2012 edition).

Evidence · text

“The Mineral Resources for the Bulla Park deposit were reported by West Cobar in accordance with ASX Listing Rule 5.8 and the JORC Code (2012 edition)”

Stale Estimatenegative · Story-specific tag

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: The effective dates for the Salazar resource estimate (October 2024) and Bulla Park resource estimate (April 2025) are over one year old relative to the October 2026 report date.

Evidence · text

“8 October 2024, Major Resource Expansions at Salazar”

Low Recoverynegative · Story-specific tag

Recovery below the weak band for the commodity and processing route.

Why it applies: The previously reported scandium recovery of 39% from bioleaching screening is below the weak band for typical metallurgical recoveries.

Evidence · text

“up to 39% in bioleaching screening”

Bench Scale Onlynegative · Story-specific tag

Only preliminary bench tests completed — no locked-cycle or pilot work.

Why it applies: The metallurgical testwork mentioned for scandium is described as 'bioleaching screening', indicating preliminary bench-scale tests.

Evidence · text

“up to 39% in bioleaching screening”

Refractory Orenegative · Story-specific tag

Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Why it applies: The metallurgical testwork for scandium involves 'atmospheric-pressure acid leaching' and 'bioleaching screening', suggesting complex mineralogy requiring oxidation or special processing.

Evidence · text

“achieved up to 81% scandium extraction by atmospheric-pressure acid leaching and up to 39% in bioleaching screening”

Cash Runway Shortnegative · Story-specific tag

No canonical definition is currently available.

Why it applies: The estimated quarters of funding available is 1.72, which is less than 2 quarters.

Evidence · text

“Estimated quarters of funding available (item 8.6 divided by item 8.3) 1.72”

Acquisition Discontinuednegative · Story-specific tag

No canonical definition is currently available.

Why it applies: The proposed Baxter acquisition was discontinued following due diligence.

Evidence · text

“Proposed Baxter acquisition discontinued following due diligence.”

Heap Leach Routeneutral

Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.

Why it applies: the document describes a heap_leach route ("heap-leach")

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: the document describes a gravity route ("gravity")

Extracted facts

Stored fact records: 11. Some facts used in scoring do not have a stored record.

Resource Estimates (9)

inferredsalazar · scandiumTonnes: 15000000Grade: 153Grade Unit: ppm Sc2O3Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
salazar
Commodity
scandium
Ticker
WC1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Serik Urbisinov
Resource group id
resource:a70c1e39ed2657f6eea0

Resource Data

Category
inferred
Tonnes
15000000
Grade
153
Grade Unit
ppm Sc2O3

Prior Estimate

Resource Date
2024-10-08

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-10-08T00:00:00.000Z

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a restatement of a previously reported Inferred resource estimate for scandium, with no new updates in this document. The estimate is over two years old.

Negative factors

  • Inferred Resource
  • Stale Estimate

Evidence · text

“Scandium: 15 Mt of 153 ppm Sc2O3 (Inferred)”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.1 years before this release

indicatedsalazar · rare earth elementsTonnes: 44000000Grade: 1239Grade Unit: ppm TREOHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
salazar
Commodity
rare earth elements
Ticker
WC1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Serik Urbisinov
Resource group id
resource:fe72080e7bc6f2fac586

Resource Data

Category
indicated
Tonnes
44000000
Grade
1239
Grade Unit
ppm TREO
Cutoff Grade
600
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2024-10-08

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-10-08T00:00:00.000Z

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a restatement of a previously reported Indicated resource estimate for rare earth elements, with no new updates in this document. The estimate is over two years old.

Negative factors

  • Stale Estimate

Evidence · text

“Includes 44Mt of 1239ppm TREO (Indicated) using a 600ppm TREO cut-off”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.1 years before this release

inferredsalazar · rare earth elementsTonnes: 230000000Grade: 1178Grade Unit: ppm TREOHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
salazar
Commodity
rare earth elements
Ticker
WC1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Serik Urbisinov
Resource group id
resource:c019ff3939ff479769fe

Resource Data

Category
inferred
Tonnes
230000000
Grade
1178
Grade Unit
ppm TREO

Prior Estimate

Resource Date
2024-10-08

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-10-08T00:00:00.000Z

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a restatement of a previously reported total (Indicated and Inferred) resource estimate for rare earth elements, treated as Inferred per guidelines. No new updates in this document, and the estimate is over two years old.

Negative factors

  • Inferred Resource
  • Stale Estimate

Evidence · text

“230 Mt of 1,178 ppm TREO * (Total Indicated and Inferred)”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.1 years before this release

inferredsalazar · titanium dioxideTonnes: 42000000Grade: 5.2Grade Unit: % TiO2Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
salazar
Commodity
titanium dioxide
Ticker
WC1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Serik Urbisinov
Resource group id
resource:ec299ee3e159c3674811

Resource Data

Category
inferred
Tonnes
42000000
Grade
5.2
Grade Unit
% TiO2

Prior Estimate

Resource Date
2024-10-08

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-10-08T00:00:00.000Z

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a restatement of a previously reported Inferred resource estimate for titanium dioxide, with no new updates in this document. The estimate is over two years old.

Negative factors

  • Inferred Resource
  • Stale Estimate

Evidence · text

“TiO2: 42 Mt of 5.2% TiO2 (Inferred)”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.1 years before this release

inferredsalazar · galliumTonnes: 263000000Grade: 35Grade Unit: ppm Ga2O3Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
salazar
Commodity
gallium
Ticker
WC1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Serik Urbisinov
Resource group id
resource:a6ac7d12f7f4da49f4d3

Resource Data

Category
inferred
Tonnes
263000000
Grade
35
Grade Unit
ppm Ga2O3

Prior Estimate

Resource Date
2024-10-08

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-10-08T00:00:00.000Z

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a restatement of a previously reported Inferred resource estimate for gallium, with no new updates in this document. The estimate is over two years old.

Negative factors

  • Inferred Resource
  • Stale Estimate

Evidence · text

“Gallium: 263 Mt of 35 ppm Ga2O3 (Inferred)”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.1 years before this release

inferredsalazar · aluminaTonnes: 4000000Grade: 29.7Grade Unit: % Al2O3Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
salazar
Commodity
alumina
Ticker
WC1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Serik Urbisinov
Resource group id
resource:e74dc2629305cf4cefa6

Resource Data

Category
inferred
Tonnes
4000000
Grade
29.7
Grade Unit
% Al2O3

Prior Estimate

Resource Date
2024-10-08

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2024-10-08T00:00:00.000Z

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a restatement of a previously reported Inferred resource estimate for alumina, with no new updates in this document. The estimate is over two years old.

Negative factors

  • Inferred Resource
  • Stale Estimate

Evidence · text

“Alumina: 4 Mt of 29.7% Al2O3 (Inferred)”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 2.1 years before this release

inferredbulla park · copperTonnes: 20000000Grade: 0.3Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
bulla park
Commodity
copper
Ticker
WC1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Jeremy Clark
Resource group id
resource:88105736bcd716a43214

Resource Data

Category
inferred
Tonnes
20000000
Grade
0.3
Grade Unit
%

Prior Estimate

Resource Date
2025-04-14

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2025-04-14T00:00:00.000Z

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a restatement of a previously reported Inferred resource estimate for copper, with no new updates in this document. The estimate is over one year old.

Negative factors

  • Inferred Resource
  • Stale Estimate

Evidence · text

“Bulla Park contains an Inferred Mineral Resource of 20 Mt at 0.30% copper”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredbulla park · antimonyTonnes: 20000000Grade: 0.1Grade Unit: %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
bulla park
Commodity
antimony
Ticker
WC1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Jeremy Clark
Resource group id
resource:88105736bcd716a43214

Resource Data

Category
inferred
Tonnes
20000000
Grade
0.1
Grade Unit
%

Prior Estimate

Resource Date
2025-04-14

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2025-04-14T00:00:00.000Z

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a restatement of a previously reported Inferred resource estimate for antimony, with no new updates in this document. The estimate is over one year old.

Negative factors

  • Inferred Resource
  • Stale Estimate

Evidence · text

“0.10% antimony”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

inferredbulla park · silverTonnes: 20000000Grade: 4.7Grade Unit: g/tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
bulla park
Commodity
silver
Ticker
WC1

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Jeremy Clark
Resource group id
resource:88105736bcd716a43214

Resource Data

Category
inferred
Tonnes
20000000
Grade
4.7
Grade Unit
g/t

Prior Estimate

Resource Date
2025-04-14

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2025-04-14T00:00:00.000Z

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a restatement of a previously reported Inferred resource estimate for silver, with no new updates in this document. The estimate is over one year old.

Negative factors

  • Inferred Resource
  • Stale Estimate

Evidence · text

“4.7 g/t silver”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Metallurgical Results (2)

acid-leachsalazar · scandiumRecovery: 81 %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
salazar
Commodity
scandium
Ticker
WC1

Test Work

Program Status
preliminary
Test Type
acid-leach
Processing Route
atmospheric-pressure acid leaching

Recovery

Recovery
81 %
Recovery Basis
actual_test

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-08-10T00:00:00.000Z

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a restatement of a previously reported scandium recovery of 81% via atmospheric-pressure acid leaching. While the recovery is strong, the testwork is preliminary and historical.

Positive factors

  • High Recovery

Negative factors

  • Bench Scale Only
  • Refractory Ore

Evidence · text

“Previously reported tests achieved up to 81% scandium extraction by atmospheric-pressure acid leaching”
bioleaching screeningsalazar · scandiumRecovery: 39 %Historical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
salazar
Commodity
scandium
Ticker
WC1

Test Work

Program Status
preliminary
Test Type
bioleaching screening

Recovery

Recovery
39 %
Recovery Basis
actual_test

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-08-10T00:00:00.000Z

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: This is a restatement of a previously reported scandium recovery of 39% via bioleaching screening. This recovery is low and the testwork is preliminary and historical.

Negative factors

  • Low Recovery
  • Bench Scale Only
  • Refractory Ore

Evidence · text

“up to 39% in bioleaching screening”

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.