Victory Metals reported a highly positive Pre-Feasibility Study for its North Stanmore Heavy Rare Earth Project, outlining a 20-year development case with a post-tax NPV8 of A$1.21 billion and an IRR of 240%. This was underpinned by a maiden Probable Ore Reserve of 47.0 Mt at 692 ppm TREO and an updated Mineral Resource Estimate including a new Measured category. The company also secured its mining lease and dispatched heavy rare earth concentrate to potential offtake partners.

Reasoning: Victory Metals delivered a robust Pre-Feasibility Study with strong economics, established a maiden Ore Reserve, updated its Mineral Resource Estimate with a Measured category, and secured key mining tenure, significantly de-risking the North Stanmore project. Metallurgical work also confirmed favorable mineralogy.

Positive factors

  • Strong PFS economics (high NPV, IRR, low capex, quick payback)
  • Maiden Probable Ore Reserve established
  • Updated Mineral Resource Estimate includes a new Measured category and high-grade domain
  • Mining Lease granted, securing tenure
  • Positive metallurgical results (TIMA mineralogy confirming REE deportment)
  • Concentrate dispatched to potential offtake partners

Negative factors

  • TIMA study does not by itself establish leach recovery, reagent consumption or final process conditions
  • ALS noted a high degree of uncertainty for Pr and Nd and a very high degree of uncertainty for Tb and Dy, and recommended LA-ICP-MS analysis to refine phase compositions

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 33

Atlas analysis — Victory Metals Limited: VTM: Quarterly Activities/Appendix 5B Cash Flow Report. probable 47000000 tonnes; 86% recovery

Classification and evidence

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: Resource and Reserve estimates are reported in accordance with the 2012 JORC Code.

Evidence · text

“This Quarterly Activities Report contains information extracted from ASX market announcements reported in accordance with the 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" (2012 JORC Code).”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Competent Persons (Professor Ken Collerson, Dean O'Keefe, Rodrick Bonner, Paul King) are named and consent to the inclusion of information.

Evidence · text

“Professor Collerson (PhD), Principal of KDC Geo Consulting and Director of Victory Metals Limited, is a Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM No. 100125) and a geochemist/geologist with sufficient relevant experience in relation to rare earth element and critical metal mineralisation being reported on, to qualify as a Competent Person as defined in the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012). Professor Collerson consents to the inclusion of this information in the form and context in which it appears.”

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: A maiden Probable Ore Reserve of 47.0 Mt at 692 ppm TREO was established.

Evidence · text

“Maiden Probable Ore Reserve of 47.0 Mt at 692 ppm TREO and 248 ppm HREO, underpinning 100% of the PFS production target.”

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: The updated MRE includes a maiden 70.7 Mt Measured category.

Evidence · text

“Updated Mineral Resource Estimate of 278.8 Mt at 483 ppm TREO, including a maiden 70.7 Mt Measured category and a 53.3 Mt high-grade domain at 1,024 ppm TREO.”

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The document reports an updated Mineral Resource Estimate for the North Stanmore project.

Evidence · text

“Updated Mineral Resource Estimate of 278.8 Mt at 483 ppm TREO, including a maiden 70.7 Mt Measured category and a 53.3 Mt high-grade domain at 1,024 ppm TREO.”

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: The updated MRE includes a maiden 70.7 Mt Measured category.

Evidence · text

“Updated Mineral Resource Estimate of 278.8 Mt at 483 ppm TREO, including a maiden 70.7 Mt Measured category and a 53.3 Mt high-grade domain at 1,024 ppm TREO.”

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: The resource and reserve estimates were prepared to support a Pre-Feasibility Study.

Evidence · text

“On 18 August 2026, Victory released the results of the North Stanmore Pre-Feasibility Study (PFS), a maiden Ore Reserve and an updated Mineral Resource Estimate (MRE) for its 100%-owned North Stanmore Heavy Rare Earth Project near Cue, Western Australia.”

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The MRE and Ore Reserve are reported with a ≥300 ppm TREO cut-off grade, and the high-grade domain with a ≥600 ppm TREO cut-off.

Evidence · text

“Maiden Probable Ore Reserve of 47.0 Mt at 692 ppm TREO and 248 ppm HREO (≥300 ppm TREO cut-off)”

Pilot Scale Completepositive · Story-specific tag

Pilot or demonstration plant testing completed under continuous operation.

Why it applies: The Perth flotation pilot plant continued to operate under continuous, steady-state conditions.

Evidence · text

“Victory's Perth flotation pilot plant continued to operate under continuous, steady-state conditions at ambient temperature during the Quarter, producing heavy rare earth-enriched concentrate consistent with the 7.1% TREO result reported on 17 June 2026.”

Mill Routeneutral · Story-specific tag

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: The PFS outlines flotation beneficiation at 2.4 Mtpa to produce concentrate.

Evidence · text

“shallow, predominantly free-dig open-pit mining and flotation beneficiation at 2.4 Mtpa to produce ~29,000 wet tonnes a year of heavy rare earth-enriched mineral concentrate”

Multi-Domain Testedpositive · Story-specific tag

Variability across ore domains (oxide, transition, fresh) has been addressed.

Why it applies: Material previously logged as saprock was reclassified as saprolite, adding further high-grade material to the PFS mine plan, indicating variability consideration.

Evidence · text

“Material previously logged as saprock reclassified as saprolite, adding further high-grade material to the PFS mine plan.”

Extracted facts

Stored fact records: 26. Some facts used in scoring do not have a stored record.

Resource Estimates (20)

probableNorth Stanmore · rare earth elementsTonnes: 47000000Grade: 692Grade Unit: ppm TREOContained Metal: 32.6Contained Unit: ktView all details
Link to this fact

Identity

Project
North Stanmore
Commodity
rare earth elements
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Rodrick Bonner, Paul King
Resource group id
resource:63457b0693a882bda878
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
47000000
Grade
692
Grade Unit
ppm TREO
Contained Metal
32.6
Contained Unit
kt
Cutoff Grade
300
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The maiden Probable Ore Reserve provides a high-confidence estimate of economically extractable material, fully supporting the project's production target.

Positive factors

  • Maiden Ore Reserve established
  • Probable category indicates good confidence
  • Underpins 100% of PFS production target

Evidence · table

“692”

Context: 47.0

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableNorth Stanmore · rare earth elementsTonnes: 47000000Grade: 248Grade Unit: ppm HREOContained Metal: 11.6Contained Unit: ktView all details
Link to this fact

Identity

Project
North Stanmore
Commodity
rare earth elements
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Rodrick Bonner, Paul King
Resource group id
resource:63457b0693a882bda878
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
47000000
Grade
248
Grade Unit
ppm HREO
Contained Metal
11.6
Contained Unit
kt
Cutoff Grade
300
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The maiden Probable Ore Reserve provides a high-confidence estimate of economically extractable material, fully supporting the project's production target.

Positive factors

  • Maiden Ore Reserve established
  • Probable category indicates good confidence
  • Underpins 100% of PFS production target

Evidence · table

“248”

Context: 47.0

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableNorth Stanmore · hafniumTonnes: 47000000Grade: 6.4Grade Unit: ppm HfO₂View all details
Link to this fact

Identity

Project
North Stanmore
Commodity
hafnium
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Rodrick Bonner, Paul King
Resource group id
resource:63457b0693a882bda878
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
47000000
Grade
6.4
Grade Unit
ppm HfO₂
Cutoff Grade
300
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The maiden Probable Ore Reserve provides a high-confidence estimate of economically extractable material, fully supporting the project's production target.

Positive factors

  • Maiden Ore Reserve established
  • Probable category indicates good confidence
  • Underpins 100% of PFS production target

Evidence · table

“6.4”

Context: 47.0

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredNorth Stanmore · rare earth elementsTonnes: 70670000Grade: 535Grade Unit: ppm TREOView all details
Link to this fact

Identity

Project
North Stanmore
Commodity
rare earth elements
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dean O'Keefe
Resource group id
resource:8ee142bbd4bf5f62d878
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
70670000
Grade
535
Grade Unit
ppm TREO
Cutoff Grade
300
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The introduction of a maiden Measured category significantly increases the confidence in the resource estimate, de-risking the project.

Positive factors

  • Maiden Measured category introduced
  • High confidence resource

Evidence · table

“535”

Context: 70.67

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredNorth Stanmore · rare earth elementsTonnes: 70670000Grade: 192Grade Unit: ppm HREOView all details
Link to this fact

Identity

Project
North Stanmore
Commodity
rare earth elements
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dean O'Keefe
Resource group id
resource:8ee142bbd4bf5f62d878
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
70670000
Grade
192
Grade Unit
ppm HREO
Cutoff Grade
300
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The introduction of a maiden Measured category significantly increases the confidence in the resource estimate, de-risking the project.

Positive factors

  • Maiden Measured category introduced
  • High confidence resource

Evidence · table

“192”

Context: 70.67

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredNorth Stanmore · rare earth elementsTonnes: 70670000Grade: 343Grade Unit: ppm LREOView all details
Link to this fact

Identity

Project
North Stanmore
Commodity
rare earth elements
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dean O'Keefe
Resource group id
resource:8ee142bbd4bf5f62d878
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
70670000
Grade
343
Grade Unit
ppm LREO
Cutoff Grade
300
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The introduction of a maiden Measured category significantly increases the confidence in the resource estimate, de-risking the project.

Positive factors

  • Maiden Measured category introduced
  • High confidence resource

Evidence · table

“343”

Context: 70.67

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredNorth Stanmore · hafniumTonnes: 70670000Grade: 7.4Grade Unit: ppm HfO₂View all details
Link to this fact

Identity

Project
North Stanmore
Commodity
hafnium
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dean O'Keefe
Resource group id
resource:8ee142bbd4bf5f62d878
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
70670000
Grade
7.4
Grade Unit
ppm HfO₂
Cutoff Grade
300
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The introduction of a maiden Measured category significantly increases the confidence in the resource estimate, de-risking the project.

Positive factors

  • Maiden Measured category introduced
  • High confidence resource

Evidence · table

“7.4”

Context: 70.67

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedNorth Stanmore · rare earth elementsTonnes: 84090000Grade: 510Grade Unit: ppm TREOView all details
Link to this fact

Identity

Project
North Stanmore
Commodity
rare earth elements
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dean O'Keefe
Resource group id
resource:95e3635dcb27dbd2b635
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
84090000
Grade
510
Grade Unit
ppm TREO
Cutoff Grade
300
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Indicated resource provides a reasonable level of geological confidence for future studies.

Positive factors

  • Significant Indicated resource tonnage

Evidence · table

“510”

Context: 84.09

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedNorth Stanmore · rare earth elementsTonnes: 84090000Grade: 180Grade Unit: ppm HREOView all details
Link to this fact

Identity

Project
North Stanmore
Commodity
rare earth elements
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dean O'Keefe
Resource group id
resource:95e3635dcb27dbd2b635
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
84090000
Grade
180
Grade Unit
ppm HREO
Cutoff Grade
300
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Indicated resource provides a reasonable level of geological confidence for future studies.

Positive factors

  • Significant Indicated resource tonnage

Evidence · table

“180”

Context: 84.09

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedNorth Stanmore · rare earth elementsTonnes: 84090000Grade: 329Grade Unit: ppm LREOView all details
Link to this fact

Identity

Project
North Stanmore
Commodity
rare earth elements
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dean O'Keefe
Resource group id
resource:95e3635dcb27dbd2b635
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
84090000
Grade
329
Grade Unit
ppm LREO
Cutoff Grade
300
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Indicated resource provides a reasonable level of geological confidence for future studies.

Positive factors

  • Significant Indicated resource tonnage

Evidence · table

“329”

Context: 84.09

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedNorth Stanmore · hafniumTonnes: 84090000Grade: 7Grade Unit: ppm HfO₂View all details
Link to this fact

Identity

Project
North Stanmore
Commodity
hafnium
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dean O'Keefe
Resource group id
resource:95e3635dcb27dbd2b635
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
84090000
Grade
7
Grade Unit
ppm HfO₂
Cutoff Grade
300
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Indicated resource provides a reasonable level of geological confidence for future studies.

Positive factors

  • Significant Indicated resource tonnage

Evidence · table

“7.0”

Context: 84.09

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredNorth Stanmore · rare earth elementsTonnes: 124040000Grade: 434Grade Unit: ppm TREOView all details
Link to this fact

Identity

Project
North Stanmore
Commodity
rare earth elements
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dean O'Keefe
Resource group id
resource:530f56e229af86cce6c8
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
124040000
Grade
434
Grade Unit
ppm TREO
Cutoff Grade
300
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Inferred resource contributes to the overall scale of the project but has lower geological confidence compared to Measured and Indicated categories.

Positive factors

  • Adds to overall resource scale

Negative factors

  • Inferred category has lower geological confidence

Evidence · table

“434”

Context: 124.04

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredNorth Stanmore · rare earth elementsTonnes: 124040000Grade: 154Grade Unit: ppm HREOView all details
Link to this fact

Identity

Project
North Stanmore
Commodity
rare earth elements
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dean O'Keefe
Resource group id
resource:530f56e229af86cce6c8
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
124040000
Grade
154
Grade Unit
ppm HREO
Cutoff Grade
300
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Inferred resource contributes to the overall scale of the project but has lower geological confidence compared to Measured and Indicated categories.

Positive factors

  • Adds to overall resource scale

Negative factors

  • Inferred category has lower geological confidence

Evidence · table

“154”

Context: 124.04

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredNorth Stanmore · rare earth elementsTonnes: 124040000Grade: 281Grade Unit: ppm LREOView all details
Link to this fact

Identity

Project
North Stanmore
Commodity
rare earth elements
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dean O'Keefe
Resource group id
resource:530f56e229af86cce6c8
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
124040000
Grade
281
Grade Unit
ppm LREO
Cutoff Grade
300
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Inferred resource contributes to the overall scale of the project but has lower geological confidence compared to Measured and Indicated categories.

Positive factors

  • Adds to overall resource scale

Negative factors

  • Inferred category has lower geological confidence

Evidence · table

“281”

Context: 124.04

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredNorth Stanmore · hafniumTonnes: 124040000Grade: 6.8Grade Unit: ppm HfO₂View all details
Link to this fact

Identity

Project
North Stanmore
Commodity
hafnium
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dean O'Keefe
Resource group id
resource:530f56e229af86cce6c8
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
124040000
Grade
6.8
Grade Unit
ppm HfO₂
Cutoff Grade
300
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Inferred resource contributes to the overall scale of the project but has lower geological confidence compared to Measured and Indicated categories.

Positive factors

  • Adds to overall resource scale

Negative factors

  • Inferred category has lower geological confidence

Evidence · table

“6.8”

Context: 124.04

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredNorth Stanmore · rare earth elementsTonnes: 278800000Grade: 483Grade Unit: ppm TREOView all details
Link to this fact

Identity

Project
North Stanmore
Commodity
rare earth elements
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dean O'Keefe
Resource group id
resource:ba67a37ef0bb7baec088
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
278800000
Grade
483
Grade Unit
ppm TREO
Cutoff Grade
300
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The updated MRE shows a substantial total resource, providing a strong foundation for the project, with a significant portion in higher confidence categories.

Positive factors

  • Significant total resource tonnage
  • Includes Measured and Indicated categories

Evidence · table

“483”

Context: 278.80

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredNorth Stanmore · rare earth elementsTonnes: 278800000Grade: 171Grade Unit: ppm HREOView all details
Link to this fact

Identity

Project
North Stanmore
Commodity
rare earth elements
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dean O'Keefe
Resource group id
resource:ba67a37ef0bb7baec088
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
278800000
Grade
171
Grade Unit
ppm HREO
Cutoff Grade
300
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The updated MRE shows a substantial total resource, providing a strong foundation for the project, with a significant portion in higher confidence categories.

Positive factors

  • Significant total resource tonnage
  • Includes Measured and Indicated categories

Evidence · table

“171”

Context: 278.80

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredNorth Stanmore · rare earth elementsTonnes: 278800000Grade: 311Grade Unit: ppm LREOView all details
Link to this fact

Identity

Project
North Stanmore
Commodity
rare earth elements
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dean O'Keefe
Resource group id
resource:ba67a37ef0bb7baec088
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
278800000
Grade
311
Grade Unit
ppm LREO
Cutoff Grade
300
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The updated MRE shows a substantial total resource, providing a strong foundation for the project, with a significant portion in higher confidence categories.

Positive factors

  • Significant total resource tonnage
  • Includes Measured and Indicated categories

Evidence · table

“311”

Context: 278.80

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredNorth Stanmore · hafniumTonnes: 278800000Grade: 7Grade Unit: ppm HfO₂View all details
Link to this fact

Identity

Project
North Stanmore
Commodity
hafnium
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dean O'Keefe
Resource group id
resource:ba67a37ef0bb7baec088
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
278800000
Grade
7
Grade Unit
ppm HfO₂
Cutoff Grade
300
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The updated MRE shows a substantial total resource, providing a strong foundation for the project, with a significant portion in higher confidence categories.

Positive factors

  • Significant total resource tonnage
  • Includes Measured and Indicated categories

Evidence · table

“7.0”

Context: 278.80

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredNorth Stanmore · rare earth elementsTonnes: 53300000Grade: 1024Grade Unit: ppm TREOView all details
Link to this fact

Identity

Project
North Stanmore
Commodity
rare earth elements
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Dean O'Keefe
Resource group id
resource:73b71e59f991d6b00d9b
Deposit or zone
high-grade domain
Mining method
open_pit
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
53300000
Grade
1024
Grade Unit
ppm TREO
Cutoff Grade
600
Cutoff Unit
ppm TREO

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The identification of a substantial high-grade domain within the resource enhances the project's potential economics.

Positive factors

  • High-grade domain identified
  • Significant tonnage within the high-grade domain

Evidence · text

“Includes a high-grade domain of 53.34 Mt at 1,024 ppm TREO (≥600 ppm TREO cut-off).”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Metallurgical Results (6)

pilot plantNorth Stanmore · rare earth elementsHead Grade: 1189Head Grade Unit: ppm TREOHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
North Stanmore
Commodity
rare earth elements
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Test Work

Program Status
detailed
Test Type
pilot plant
Processing Route
flotation beneficiation
Sample
composite of 33 air core samples from 18 drill holes within Indicated Mineral Resource areas

Recovery

Head Grade
1189
Head Grade Unit
ppm TREO
Conc. Grade
7.1
Conc. Grade Unit
% TREO

Lab

Laboratory
ALS Metallurgy

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-06-17T00:00:00.000Z

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: Pilot plant operations are successfully producing heavy rare earth concentrate, which is being dispatched for qualification, indicating progress towards commercialization.

Positive factors

  • Pilot plant operations producing concentrate
  • Concentrate dispatched for independent qualification
  • Consistent concentrate grade

Evidence · text

“Victory's Perth flotation pilot plant continued to operate under continuous, steady-state conditions at ambient temperature during the Quarter, producing heavy rare earth-enriched concentrate consistent with the 7.1% TREO result reported on 17 June 2026.”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

Pilot Scale Completepositive

Pilot or demonstration plant testing completed under continuous operation.

Why it applies: test_type names pilot-scale work

TIMA mineralogyNorth Stanmore · dysprosiumRecovery: 86 %View all details
Link to this fact

Identity

Project
North Stanmore
Commodity
dysprosium
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Test Work

Test Type
TIMA mineralogy
Processing Route
flotation beneficiation
Sample
pilot plant concentrate

Recovery

Recovery
86 %
Recovery Basis
to_concentrate

Reagents

Reagent Notes
Most of the target rare earth value reports to the secondary phosphate system: Element Deportment to secondary phosphate groups (%) Largest individual host Dysprosium (Dy) 86 Churchite and similar Terbium (Tb) 82 Churchite and similar Yttrium (Y) 96 – Praseodymium (Pr) 88 Rhabdophane and similar Neodymium (Nd) 91 Rhabdophane and similar

Lab

Laboratory
ALS Metallurgy

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: TIMA mineralogy confirms high deportment of dysprosium to secondary phosphate groups, supporting the chosen beneficiation route and indicating favorable processing characteristics, though further analysis is recommended.

Positive factors

  • High deportment to secondary phosphate groups
  • Supports wet screening and flotation-led beneficiation route
  • Favorable for acid consumption (calcium in feldspar)

Negative factors

  • TIMA study does not by itself establish leach recovery, reagent consumption or final process conditions
  • ALS noted a high degree of uncertainty for Pr and Nd and a very high degree of uncertainty for Tb and Dy, and recommended LA-ICP-MS analysis to refine phase compositions

Evidence · table

“86”

Context: Dysprosium (Dy)

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

TIMA mineralogyNorth Stanmore · terbiumRecovery: 82 %View all details
Link to this fact

Identity

Project
North Stanmore
Commodity
terbium
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Test Work

Test Type
TIMA mineralogy
Processing Route
flotation beneficiation
Sample
pilot plant concentrate

Recovery

Recovery
82 %
Recovery Basis
to_concentrate

Reagents

Reagent Notes
Most of the target rare earth value reports to the secondary phosphate system: Element Deportment to secondary phosphate groups (%) Largest individual host Dysprosium (Dy) 86 Churchite and similar Terbium (Tb) 82 Churchite and similar Yttrium (Y) 96 – Praseodymium (Pr) 88 Rhabdophane and similar Neodymium (Nd) 91 Rhabdophane and similar

Lab

Laboratory
ALS Metallurgy

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: TIMA mineralogy confirms high deportment of terbium to secondary phosphate groups, supporting the chosen beneficiation route and indicating favorable processing characteristics, though further analysis is recommended.

Positive factors

  • High deportment to secondary phosphate groups
  • Supports wet screening and flotation-led beneficiation route
  • Favorable for acid consumption (calcium in feldspar)

Negative factors

  • TIMA study does not by itself establish leach recovery, reagent consumption or final process conditions
  • ALS noted a high degree of uncertainty for Pr and Nd and a very high degree of uncertainty for Tb and Dy, and recommended LA-ICP-MS analysis to refine phase compositions

Evidence · table

“82”

Context: Terbium (Tb)

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

TIMA mineralogyNorth Stanmore · yttriumRecovery: 96 %View all details
Link to this fact

Identity

Project
North Stanmore
Commodity
yttrium
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Test Work

Test Type
TIMA mineralogy
Processing Route
flotation beneficiation
Sample
pilot plant concentrate

Recovery

Recovery
96 %
Recovery Basis
to_concentrate

Reagents

Reagent Notes
Most of the target rare earth value reports to the secondary phosphate system: Element Deportment to secondary phosphate groups (%) Largest individual host Dysprosium (Dy) 86 Churchite and similar Terbium (Tb) 82 Churchite and similar Yttrium (Y) 96 – Praseodymium (Pr) 88 Rhabdophane and similar Neodymium (Nd) 91 Rhabdophane and similar

Lab

Laboratory
ALS Metallurgy

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: TIMA mineralogy confirms high deportment of yttrium to secondary phosphate groups, supporting the chosen beneficiation route and indicating favorable processing characteristics, though further analysis is recommended.

Positive factors

  • High deportment to secondary phosphate groups
  • Supports wet screening and flotation-led beneficiation route
  • Favorable for acid consumption (calcium in feldspar)

Negative factors

  • TIMA study does not by itself establish leach recovery, reagent consumption or final process conditions
  • ALS noted a high degree of uncertainty for Pr and Nd and a very high degree of uncertainty for Tb and Dy, and recommended LA-ICP-MS analysis to refine phase compositions

Evidence · table

“96”

Context: Yttrium (Y)

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

TIMA mineralogyNorth Stanmore · praseodymiumRecovery: 88 %View all details
Link to this fact

Identity

Project
North Stanmore
Commodity
praseodymium
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Test Work

Test Type
TIMA mineralogy
Processing Route
flotation beneficiation
Sample
pilot plant concentrate

Recovery

Recovery
88 %
Recovery Basis
to_concentrate

Reagents

Reagent Notes
Most of the target rare earth value reports to the secondary phosphate system: Element Deportment to secondary phosphate groups (%) Largest individual host Dysprosium (Dy) 86 Churchite and similar Terbium (Tb) 82 Churchite and similar Yttrium (Y) 96 – Praseodymium (Pr) 88 Rhabdophane and similar Neodymium (Nd) 91 Rhabdophane and similar

Lab

Laboratory
ALS Metallurgy

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: TIMA mineralogy confirms high deportment of praseodymium to secondary phosphate groups, supporting the chosen beneficiation route and indicating favorable processing characteristics, though further analysis is recommended.

Positive factors

  • High deportment to secondary phosphate groups
  • Supports wet screening and flotation-led beneficiation route
  • Favorable for acid consumption (calcium in feldspar)

Negative factors

  • TIMA study does not by itself establish leach recovery, reagent consumption or final process conditions
  • ALS noted a high degree of uncertainty for Pr and Nd and a very high degree of uncertainty for Tb and Dy, and recommended LA-ICP-MS analysis to refine phase compositions

Evidence · table

“88”

Context: Praseodymium (Pr)

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

TIMA mineralogyNorth Stanmore · neodymiumRecovery: 91 %View all details
Link to this fact

Identity

Project
North Stanmore
Commodity
neodymium
Region
australia_wa
Reported Region
Western Australia
Ticker
VTM

Test Work

Test Type
TIMA mineralogy
Processing Route
flotation beneficiation
Sample
pilot plant concentrate

Recovery

Recovery
91 %
Recovery Basis
to_concentrate

Reagents

Reagent Notes
Most of the target rare earth value reports to the secondary phosphate system: Element Deportment to secondary phosphate groups (%) Largest individual host Dysprosium (Dy) 86 Churchite and similar Terbium (Tb) 82 Churchite and similar Yttrium (Y) 96 – Praseodymium (Pr) 88 Rhabdophane and similar Neodymium (Nd) 91 Rhabdophane and similar

Lab

Laboratory
ALS Metallurgy

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: TIMA mineralogy confirms high deportment of neodymium to secondary phosphate groups, supporting the chosen beneficiation route and indicating favorable processing characteristics, though further analysis is recommended.

Positive factors

  • High deportment to secondary phosphate groups
  • Supports wet screening and flotation-led beneficiation route
  • Favorable for acid consumption (calcium in feldspar)

Negative factors

  • TIMA study does not by itself establish leach recovery, reagent consumption or final process conditions
  • ALS noted a high degree of uncertainty for Pr and Nd and a very high degree of uncertainty for Tb and Dy, and recommended LA-ICP-MS analysis to refine phase compositions

Evidence · table

“91”

Context: Neodymium (Nd)

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.