# TSO: Investor Presentation

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/tso-investor-presentation--11e48322-6866-4856-a67a-7538a7134b75

Original source: https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03163420

Publisher: asx

Original announcement: 2026-11-08T21:50:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-11-08T22:30:34.483Z

Atlas analysis updated: 2026-11-08T22:30:34.483Z

- Company: Tesoro Gold Limited

- Ticker: TSO

- Exchange: ASX

- Region: Chile

- Primary commodity: Unavailable

- Secondary commodities: None reported

- Document categories: Other, Resource update, Metallurgy

- Extracted: 2026-11-08 22:16:31 UTC

Narrative sentiment: 0.40 · Bullish

## Minestarters Atlas summary

This investor presentation from Tesoro Gold Limited outlines the El Zorro Gold Project in Chile, featuring the Ternera Gold Deposit with a 1.82 Moz Gold Mineral Resource Estimate and a 1.28 Moz Gold Ore Reserve. The document details positive PFS-level economics, including a post-tax NPV5% of US$994M and an IRR of 57%, alongside a clear development pathway and significant exploration upside. It emphasizes the project's development readiness, strong execution team, and favorable operating environment in Chile.

Reasoning: The investor presentation provides a comprehensive overview of the El Zorro Gold Project, highlighting its existing resource, economic potential, and future growth strategy, but it primarily consolidates previously released information without presenting new technical results.

- Positive factor: Consolidation of significant gold resource and reserve

- Positive factor: Positive PFS-level economics \(NPV, IRR, AISC\)

- Positive factor: Clear development pathway and strong project execution team/partners

- Positive factor: Significant exploration upside beyond current resource

- Positive factor: Favorable jurisdiction \(Chile\) with good infrastructure

- Negative factor: No new material technical results \(drilling, resource update\) presented in this document

- Negative factor: Reliance on previously announced data for core technical metrics

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 9

## Classification and evidence

**Mill Route**

Polarity: neutral

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: the document describes a mill\_cil route \("CIP"\)

**Gravity Route**

Polarity: neutral

Definition: Gravity separation forms a material part of the flowsheet.

Why it applies: the document describes a gravity route \("gravity"\)

## Extracted facts

Stored fact records: 8. Some facts used in scoring do not have a stored record.

## Resource Estimates (7)

### measured

[Link to this fact](https://atlas-aws.minestarters.com/news/tso-investor-presentation--11e48322-6866-4856-a67a-7538a7134b75#fact-resource-facts-0)

El Zorro Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: El Zorro Gold Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: TSO

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Mr Zeffron Reeves
- Resource group id: resource:9f0842adeaf4f631b288
- Deposit or zone: Ternera Gold Deposit

#### Resource Data

- Category: measured
- Tonnes: 2400000
- Grade: 1.24
- Grade Unit: g/t
- Contained Metal: 95
- Contained Unit: koz
- Cutoff Grade: 0.3
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-08-01

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-08-27T00:00:00.000Z

#### Dates

- Event date: 2026-11-08T00:00:00.000Z

Reasoning: This Measured resource provides high confidence for a portion of the Ternera deposit, contributing to the overall project scale, though it is a restatement of previously announced figures.

- Positive factor: High confidence Measured category

- Positive factor: Good grade for open pit gold

- Positive factor: Part of a significant total resource

- Negative factor: Information previously released

Evidence · table

> 2.4Mt

Context: Measured

#### Tags used in scoring

**Measured Resource**

Polarity: positive

Definition: Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/tso-investor-presentation--11e48322-6866-4856-a67a-7538a7134b75#fact-resource-facts-1)

El Zorro Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: El Zorro Gold Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: TSO

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Mr Zeffron Reeves
- Resource group id: resource:254460c81ac80136d18f
- Deposit or zone: Ternera Gold Deposit

#### Resource Data

- Category: indicated
- Tonnes: 37900000
- Grade: 1.13
- Grade Unit: g/t
- Contained Metal: 1371
- Contained Unit: koz
- Cutoff Grade: 0.3
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-08-01

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-08-27T00:00:00.000Z

#### Dates

- Event date: 2026-11-08T00:00:00.000Z

Reasoning: The substantial Indicated resource at Ternera provides a strong foundation for economic studies and future reserve conversion, despite being a restatement of prior news.

- Positive factor: Large tonnage in Indicated category

- Positive factor: Good grade for open pit gold

- Positive factor: Forms the bulk of the project's resource base

- Negative factor: Information previously released

Evidence · table

> 37.9Mt

Context: Indicated

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/tso-investor-presentation--11e48322-6866-4856-a67a-7538a7134b75#fact-resource-facts-2)

El Zorro Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: El Zorro Gold Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: TSO

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Mr Zeffron Reeves
- Resource group id: resource:560c49accf71649214b8
- Deposit or zone: Ternera Gold Deposit

#### Resource Data

- Category: inferred
- Tonnes: 11300000
- Grade: 0.98
- Grade Unit: g/t
- Contained Metal: 356
- Contained Unit: koz
- Cutoff Grade: 0.3
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-08-01

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-08-27T00:00:00.000Z

#### Dates

- Event date: 2026-11-08T00:00:00.000Z

Reasoning: The Inferred resource provides additional scale and exploration upside for the Ternera deposit, though its lower confidence category means it cannot directly support economic studies.

- Positive factor: Adds to overall resource scale

- Positive factor: Potential for future upgrade with further drilling

- Negative factor: Lower confidence Inferred category

- Negative factor: Information previously released

Evidence · table

> 11.3Mt

Context: Inferred

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/tso-investor-presentation--11e48322-6866-4856-a67a-7538a7134b75#fact-resource-facts-3)

El Zorro Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: El Zorro Gold Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: TSO

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Mr Zeffron Reeves
- Resource group id: resource:d3fc99176bbca1c3e90d
- Deposit or zone: Ternera Gold Deposit

#### Resource Data

- Category: indicated
- Tonnes: 51600000
- Grade: 1.1
- Grade Unit: g/t
- Contained Metal: 1822
- Contained Unit: koz
- Cutoff Grade: 0.3
- Cutoff Unit: g/t

#### Prior Estimate

- Resource Date: 2026-08-01

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-08-27T00:00:00.000Z

#### Dates

- Event date: 2026-11-08T00:00:00.000Z

Reasoning: The total Mineral Resource of 1.82 Moz gold at Ternera represents a substantial asset base for the project, providing confidence for future development, though it is a restatement.

- Positive factor: Significant total resource size

- Positive factor: Good average grade for open pit

- Positive factor: Strong foundation for project development

- Negative factor: Information previously released

Evidence · table

> 51.6Mt

Context: Total

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### proven

[Link to this fact](https://atlas-aws.minestarters.com/news/tso-investor-presentation--11e48322-6866-4856-a67a-7538a7134b75#fact-resource-facts-4)

El Zorro Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: El Zorro Gold Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: TSO

#### Resource scope

- Estimate type: reserve
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Mr Zeffron Reeves
- Resource group id: resource:25ff27ea32d59ddb872c
- Deposit or zone: Ternera Gold Deposit

#### Resource Data

- Category: proven
- Tonnes: 2800000
- Grade: 1.05
- Grade Unit: g/t
- Contained Metal: 93
- Contained Unit: koz
- Cutoff Grade: 0.3
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-09-01

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-09-18T00:00:00.000Z

#### Dates

- Event date: 2026-11-08T00:00:00.000Z

Reasoning: The Proven Reserve provides a high-confidence, economically viable portion of the Ternera deposit, supporting project de-risking, though it is a restatement of prior news.

- Positive factor: Highest confidence Proven Reserve category

- Positive factor: Good grade for open pit gold

- Positive factor: Demonstrates economic viability

- Negative factor: Information previously released

Evidence · table

> 2.8

Context: PROVED

#### Tags used in scoring

**Proven Reserve**

Polarity: positive

Definition: Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/tso-investor-presentation--11e48322-6866-4856-a67a-7538a7134b75#fact-resource-facts-5)

El Zorro Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: El Zorro Gold Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: TSO

#### Resource scope

- Estimate type: reserve
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Mr Zeffron Reeves
- Resource group id: resource:223ec47972264d76f66a
- Deposit or zone: Ternera Gold Deposit

#### Resource Data

- Category: probable
- Tonnes: 40100000
- Grade: 0.92
- Grade Unit: g/t
- Contained Metal: 1190
- Contained Unit: koz
- Cutoff Grade: 0.3
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-09-01

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-09-18T00:00:00.000Z

#### Dates

- Event date: 2026-11-08T00:00:00.000Z

Reasoning: The substantial Probable Reserve at Ternera confirms a large, economically viable portion of the deposit, providing a strong basis for mine planning, despite being a restatement.

- Positive factor: Large tonnage in Probable Reserve category

- Positive factor: Demonstrates economic viability

- Positive factor: Forms the bulk of the project's reserve base

- Negative factor: Information previously released

Evidence · table

> 40.1

Context: PROBABLE

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/tso-investor-presentation--11e48322-6866-4856-a67a-7538a7134b75#fact-resource-facts-6)

El Zorro Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: El Zorro Gold Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: TSO

#### Resource scope

- Estimate type: reserve
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Mr Zeffron Reeves
- Resource group id: resource:ef5cb4231687acf4cd71
- Deposit or zone: Ternera Gold Deposit

#### Resource Data

- Category: probable
- Tonnes: 42800000
- Grade: 0.93
- Grade Unit: g/t
- Contained Metal: 1283
- Contained Unit: koz
- Cutoff Grade: 0.3
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-09-01

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-09-18T00:00:00.000Z

#### Dates

- Event date: 2026-11-08T00:00:00.000Z

Reasoning: The total Ore Reserve of 1.28 Moz gold at Ternera represents a substantial, economically viable asset, providing high confidence for project development, though it is a restatement.

- Positive factor: Significant total Ore Reserve size

- Positive factor: Confirms economic viability of the project

- Positive factor: Strong foundation for project financing and development

- Negative factor: Information previously released

Evidence · table

> 42.8

Context: TOTAL

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

## Metallurgical Results (1)

### mill\_cip

[Link to this fact](https://atlas-aws.minestarters.com/news/tso-investor-presentation--11e48322-6866-4856-a67a-7538a7134b75#fact-metallurgical-facts-7)

El Zorro Gold Project · gold

#### Identity

- Project: El Zorro Gold Project
- Commodity: gold
- Region: chile
- Reported Region: Chile
- Ticker: TSO

#### Test Work

- Program Status: detailed
- Test Type: mill\_cip
- Processing Route: Standard CIP plant

#### Recovery

- Recovery: 95 %
- Recovery Basis: actual\_test

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-08T00:00:00.000Z

Reasoning: The 95% gold recovery from a standard CIP plant is a strong metallurgical outcome, significantly de-risking the processing aspect of the project and supporting the positive economic study results.

- Positive factor: High gold recovery for CIP plant

- Positive factor: Supports strong project economics

- Positive factor: Standard processing route reduces technical risk

- Negative factor: Information previously released as part of PFS

Evidence · text

> 95% Au RECOVERY Standard CIP plant

#### Tags used in scoring

**Mill Route**

Polarity: neutral

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: processing\_route matches the mill\_cil signal

**High Recovery**

Polarity: positive

Definition: Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: 95% is at or above the exceptional band \(95%\)

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
