TSO: Investor Presentation

Original announcement by asx on

Company
Tesoro Gold Limited
Ticker
TSO
Exchange
ASX
Region
Chile
Primary commodity
Unavailable
Secondary commodities
None reported
Document categories
Other, Resource update, Metallurgy
Extracted
2026-11-08 22:16:31 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

This investor presentation from Tesoro Gold Limited outlines the El Zorro Gold Project in Chile, featuring the Ternera Gold Deposit with a 1.82 Moz Gold Mineral Resource Estimate and a 1.28 Moz Gold Ore Reserve. The document details positive PFS-level economics, including a post-tax NPV5% of US$994M and an IRR of 57%, alongside a clear development pathway and significant exploration upside. It emphasizes the project's development readiness, strong execution team, and favorable operating environment in Chile.

Reasoning: The investor presentation provides a comprehensive overview of the El Zorro Gold Project, highlighting its existing resource, economic potential, and future growth strategy, but it primarily consolidates previously released information without presenting new technical results.

Positive factors

  • Consolidation of significant gold resource and reserve
  • Positive PFS-level economics (NPV, IRR, AISC)
  • Clear development pathway and strong project execution team/partners
  • Significant exploration upside beyond current resource
  • Favorable jurisdiction (Chile) with good infrastructure

Negative factors

  • No new material technical results (drilling, resource update) presented in this document
  • Reliance on previously announced data for core technical metrics

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 9

Atlas analysis — Tesoro Gold Limited: TSO: Investor Presentation. measured 2400000 tonnes; 95% recovery

Classification and evidence

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: the document describes a mill_cil route ("CIP")

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: the document describes a gravity route ("gravity")

Extracted facts

Stored fact records: 8. Some facts used in scoring do not have a stored record.

Resource Estimates (7)

measuredEl Zorro Gold Project · goldTonnes: 2400000Grade: 1.24Grade Unit: g/tContained Metal: 95Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
El Zorro Gold Project
Commodity
gold
Region
chile
Reported Region
Chile
Ticker
TSO

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Zeffron Reeves
Resource group id
resource:9f0842adeaf4f631b288
Deposit or zone
Ternera Gold Deposit

Resource Data

Category
measured
Tonnes
2400000
Grade
1.24
Grade Unit
g/t
Contained Metal
95
Contained Unit
koz
Cutoff Grade
0.3
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-08-27T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: This Measured resource provides high confidence for a portion of the Ternera deposit, contributing to the overall project scale, though it is a restatement of previously announced figures.

Positive factors

  • High confidence Measured category
  • Good grade for open pit gold
  • Part of a significant total resource

Negative factors

  • Information previously released

Evidence · table

“2.4Mt”

Context: Measured

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Zorro Gold Project · goldTonnes: 37900000Grade: 1.13Grade Unit: g/tContained Metal: 1371Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
El Zorro Gold Project
Commodity
gold
Region
chile
Reported Region
Chile
Ticker
TSO

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Zeffron Reeves
Resource group id
resource:254460c81ac80136d18f
Deposit or zone
Ternera Gold Deposit

Resource Data

Category
indicated
Tonnes
37900000
Grade
1.13
Grade Unit
g/t
Contained Metal
1371
Contained Unit
koz
Cutoff Grade
0.3
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-08-27T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The substantial Indicated resource at Ternera provides a strong foundation for economic studies and future reserve conversion, despite being a restatement of prior news.

Positive factors

  • Large tonnage in Indicated category
  • Good grade for open pit gold
  • Forms the bulk of the project's resource base

Negative factors

  • Information previously released

Evidence · table

“37.9Mt”

Context: Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredEl Zorro Gold Project · goldTonnes: 11300000Grade: 0.98Grade Unit: g/tContained Metal: 356Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
El Zorro Gold Project
Commodity
gold
Region
chile
Reported Region
Chile
Ticker
TSO

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Zeffron Reeves
Resource group id
resource:560c49accf71649214b8
Deposit or zone
Ternera Gold Deposit

Resource Data

Category
inferred
Tonnes
11300000
Grade
0.98
Grade Unit
g/t
Contained Metal
356
Contained Unit
koz
Cutoff Grade
0.3
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-08-27T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The Inferred resource provides additional scale and exploration upside for the Ternera deposit, though its lower confidence category means it cannot directly support economic studies.

Positive factors

  • Adds to overall resource scale
  • Potential for future upgrade with further drilling

Negative factors

  • Lower confidence Inferred category
  • Information previously released

Evidence · table

“11.3Mt”

Context: Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedEl Zorro Gold Project · goldTonnes: 51600000Grade: 1.1Grade Unit: g/tContained Metal: 1822Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
El Zorro Gold Project
Commodity
gold
Region
chile
Reported Region
Chile
Ticker
TSO

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Zeffron Reeves
Resource group id
resource:d3fc99176bbca1c3e90d
Deposit or zone
Ternera Gold Deposit

Resource Data

Category
indicated
Tonnes
51600000
Grade
1.1
Grade Unit
g/t
Contained Metal
1822
Contained Unit
koz
Cutoff Grade
0.3
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-08-01

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-08-27T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The total Mineral Resource of 1.82 Moz gold at Ternera represents a substantial asset base for the project, providing confidence for future development, though it is a restatement.

Positive factors

  • Significant total resource size
  • Good average grade for open pit
  • Strong foundation for project development

Negative factors

  • Information previously released

Evidence · table

“51.6Mt”

Context: Total

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

provenEl Zorro Gold Project · goldTonnes: 2800000Grade: 1.05Grade Unit: g/tContained Metal: 93Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
El Zorro Gold Project
Commodity
gold
Region
chile
Reported Region
Chile
Ticker
TSO

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Zeffron Reeves
Resource group id
resource:25ff27ea32d59ddb872c
Deposit or zone
Ternera Gold Deposit

Resource Data

Category
proven
Tonnes
2800000
Grade
1.05
Grade Unit
g/t
Contained Metal
93
Contained Unit
koz
Cutoff Grade
0.3
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-01

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-09-18T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The Proven Reserve provides a high-confidence, economically viable portion of the Ternera deposit, supporting project de-risking, though it is a restatement of prior news.

Positive factors

  • Highest confidence Proven Reserve category
  • Good grade for open pit gold
  • Demonstrates economic viability

Negative factors

  • Information previously released

Evidence · table

“2.8”

Context: PROVED

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableEl Zorro Gold Project · goldTonnes: 40100000Grade: 0.92Grade Unit: g/tContained Metal: 1190Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
El Zorro Gold Project
Commodity
gold
Region
chile
Reported Region
Chile
Ticker
TSO

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Zeffron Reeves
Resource group id
resource:223ec47972264d76f66a
Deposit or zone
Ternera Gold Deposit

Resource Data

Category
probable
Tonnes
40100000
Grade
0.92
Grade Unit
g/t
Contained Metal
1190
Contained Unit
koz
Cutoff Grade
0.3
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-01

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-09-18T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The substantial Probable Reserve at Ternera confirms a large, economically viable portion of the deposit, providing a strong basis for mine planning, despite being a restatement.

Positive factors

  • Large tonnage in Probable Reserve category
  • Demonstrates economic viability
  • Forms the bulk of the project's reserve base

Negative factors

  • Information previously released

Evidence · table

“40.1”

Context: PROBABLE

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableEl Zorro Gold Project · goldTonnes: 42800000Grade: 0.93Grade Unit: g/tContained Metal: 1283Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
El Zorro Gold Project
Commodity
gold
Region
chile
Reported Region
Chile
Ticker
TSO

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Zeffron Reeves
Resource group id
resource:ef5cb4231687acf4cd71
Deposit or zone
Ternera Gold Deposit

Resource Data

Category
probable
Tonnes
42800000
Grade
0.93
Grade Unit
g/t
Contained Metal
1283
Contained Unit
koz
Cutoff Grade
0.3
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-09-01

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-09-18T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The total Ore Reserve of 1.28 Moz gold at Ternera represents a substantial, economically viable asset, providing high confidence for project development, though it is a restatement.

Positive factors

  • Significant total Ore Reserve size
  • Confirms economic viability of the project
  • Strong foundation for project financing and development

Negative factors

  • Information previously released

Evidence · table

“42.8”

Context: TOTAL

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Metallurgical Results (1)

mill_cipEl Zorro Gold Project · goldRecovery: 95 %View all details
Link to this fact

Identity

Project
El Zorro Gold Project
Commodity
gold
Region
chile
Reported Region
Chile
Ticker
TSO

Test Work

Program Status
detailed
Test Type
mill_cip
Processing Route
Standard CIP plant

Recovery

Recovery
95 %
Recovery Basis
actual_test

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The 95% gold recovery from a standard CIP plant is a strong metallurgical outcome, significantly de-risking the processing aspect of the project and supporting the positive economic study results.

Positive factors

  • High gold recovery for CIP plant
  • Supports strong project economics
  • Standard processing route reduces technical risk

Negative factors

  • Information previously released as part of PFS

Evidence · text

“95% Au RECOVERY Standard CIP plant”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the mill_cil signal

High Recoverypositive

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: 95% is at or above the exceptional band (95%)

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.