TSO: Investor Presentation
Original announcement by asx on
- Company
- Tesoro Gold Limited
- Ticker
- TSO
- Exchange
- ASX
- Region
- Chile
- Primary commodity
- Unavailable
- Secondary commodities
- None reported
- Document categories
- Other, Resource update, Metallurgy
- Extracted
- 2026-11-08 22:16:31 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
This investor presentation from Tesoro Gold Limited outlines the El Zorro Gold Project in Chile, featuring the Ternera Gold Deposit with a 1.82 Moz Gold Mineral Resource Estimate and a 1.28 Moz Gold Ore Reserve. The document details positive PFS-level economics, including a post-tax NPV5% of US$994M and an IRR of 57%, alongside a clear development pathway and significant exploration upside. It emphasizes the project's development readiness, strong execution team, and favorable operating environment in Chile.
Reasoning: The investor presentation provides a comprehensive overview of the El Zorro Gold Project, highlighting its existing resource, economic potential, and future growth strategy, but it primarily consolidates previously released information without presenting new technical results.
Positive factors
- Consolidation of significant gold resource and reserve
- Positive PFS-level economics (NPV, IRR, AISC)
- Clear development pathway and strong project execution team/partners
- Significant exploration upside beyond current resource
- Favorable jurisdiction (Chile) with good infrastructure
Negative factors
- No new material technical results (drilling, resource update) presented in this document
- Reliance on previously announced data for core technical metrics
Low confidence — this extraction should be reviewed alongside the original source.
Facts used in scoring: 9

Classification and evidence
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: the document describes a mill_cil route ("CIP")
Gravity Routeneutral
Gravity separation forms a material part of the flowsheet.
Why it applies: the document describes a gravity route ("gravity")
Extracted facts
Stored fact records: 8. Some facts used in scoring do not have a stored record.
Resource Estimates (7)
measuredEl Zorro Gold Project · goldTonnes: 2400000Grade: 1.24Grade Unit: g/tContained Metal: 95Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- El Zorro Gold Project
- Commodity
- gold
- Region
- chile
- Reported Region
- Chile
- Ticker
- TSO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Zeffron Reeves
- Resource group id
- resource:9f0842adeaf4f631b288
- Deposit or zone
- Ternera Gold Deposit
Resource Data
- Category
- measured
- Tonnes
- 2400000
- Grade
- 1.24
- Grade Unit
- g/t
- Contained Metal
- 95
- Contained Unit
- koz
- Cutoff Grade
- 0.3
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-08-01
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-08-27T00:00:00.000Z
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: This Measured resource provides high confidence for a portion of the Ternera deposit, contributing to the overall project scale, though it is a restatement of previously announced figures.
Positive factors
- High confidence Measured category
- Good grade for open pit gold
- Part of a significant total resource
Negative factors
- Information previously released
Evidence · table
“2.4Mt”
Context: Measured
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedEl Zorro Gold Project · goldTonnes: 37900000Grade: 1.13Grade Unit: g/tContained Metal: 1371Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- El Zorro Gold Project
- Commodity
- gold
- Region
- chile
- Reported Region
- Chile
- Ticker
- TSO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Zeffron Reeves
- Resource group id
- resource:254460c81ac80136d18f
- Deposit or zone
- Ternera Gold Deposit
Resource Data
- Category
- indicated
- Tonnes
- 37900000
- Grade
- 1.13
- Grade Unit
- g/t
- Contained Metal
- 1371
- Contained Unit
- koz
- Cutoff Grade
- 0.3
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-08-01
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-08-27T00:00:00.000Z
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The substantial Indicated resource at Ternera provides a strong foundation for economic studies and future reserve conversion, despite being a restatement of prior news.
Positive factors
- Large tonnage in Indicated category
- Good grade for open pit gold
- Forms the bulk of the project's resource base
Negative factors
- Information previously released
Evidence · table
“37.9Mt”
Context: Indicated
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredEl Zorro Gold Project · goldTonnes: 11300000Grade: 0.98Grade Unit: g/tContained Metal: 356Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- El Zorro Gold Project
- Commodity
- gold
- Region
- chile
- Reported Region
- Chile
- Ticker
- TSO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Zeffron Reeves
- Resource group id
- resource:560c49accf71649214b8
- Deposit or zone
- Ternera Gold Deposit
Resource Data
- Category
- inferred
- Tonnes
- 11300000
- Grade
- 0.98
- Grade Unit
- g/t
- Contained Metal
- 356
- Contained Unit
- koz
- Cutoff Grade
- 0.3
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-08-01
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-08-27T00:00:00.000Z
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The Inferred resource provides additional scale and exploration upside for the Ternera deposit, though its lower confidence category means it cannot directly support economic studies.
Positive factors
- Adds to overall resource scale
- Potential for future upgrade with further drilling
Negative factors
- Lower confidence Inferred category
- Information previously released
Evidence · table
“11.3Mt”
Context: Inferred
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedEl Zorro Gold Project · goldTonnes: 51600000Grade: 1.1Grade Unit: g/tContained Metal: 1822Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- El Zorro Gold Project
- Commodity
- gold
- Region
- chile
- Reported Region
- Chile
- Ticker
- TSO
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Zeffron Reeves
- Resource group id
- resource:d3fc99176bbca1c3e90d
- Deposit or zone
- Ternera Gold Deposit
Resource Data
- Category
- indicated
- Tonnes
- 51600000
- Grade
- 1.1
- Grade Unit
- g/t
- Contained Metal
- 1822
- Contained Unit
- koz
- Cutoff Grade
- 0.3
- Cutoff Unit
- g/t
Prior Estimate
- Resource Date
- 2026-08-01
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-08-27T00:00:00.000Z
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The total Mineral Resource of 1.82 Moz gold at Ternera represents a substantial asset base for the project, providing confidence for future development, though it is a restatement.
Positive factors
- Significant total resource size
- Good average grade for open pit
- Strong foundation for project development
Negative factors
- Information previously released
Evidence · table
“51.6Mt”
Context: Total
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
provenEl Zorro Gold Project · goldTonnes: 2800000Grade: 1.05Grade Unit: g/tContained Metal: 93Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- El Zorro Gold Project
- Commodity
- gold
- Region
- chile
- Reported Region
- Chile
- Ticker
- TSO
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Zeffron Reeves
- Resource group id
- resource:25ff27ea32d59ddb872c
- Deposit or zone
- Ternera Gold Deposit
Resource Data
- Category
- proven
- Tonnes
- 2800000
- Grade
- 1.05
- Grade Unit
- g/t
- Contained Metal
- 93
- Contained Unit
- koz
- Cutoff Grade
- 0.3
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-01
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-09-18T00:00:00.000Z
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The Proven Reserve provides a high-confidence, economically viable portion of the Ternera deposit, supporting project de-risking, though it is a restatement of prior news.
Positive factors
- Highest confidence Proven Reserve category
- Good grade for open pit gold
- Demonstrates economic viability
Negative factors
- Information previously released
Evidence · table
“2.8”
Context: PROVED
Tags used in scoring
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "proven"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
probableEl Zorro Gold Project · goldTonnes: 40100000Grade: 0.92Grade Unit: g/tContained Metal: 1190Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- El Zorro Gold Project
- Commodity
- gold
- Region
- chile
- Reported Region
- Chile
- Ticker
- TSO
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Zeffron Reeves
- Resource group id
- resource:223ec47972264d76f66a
- Deposit or zone
- Ternera Gold Deposit
Resource Data
- Category
- probable
- Tonnes
- 40100000
- Grade
- 0.92
- Grade Unit
- g/t
- Contained Metal
- 1190
- Contained Unit
- koz
- Cutoff Grade
- 0.3
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-01
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-09-18T00:00:00.000Z
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The substantial Probable Reserve at Ternera confirms a large, economically viable portion of the deposit, providing a strong basis for mine planning, despite being a restatement.
Positive factors
- Large tonnage in Probable Reserve category
- Demonstrates economic viability
- Forms the bulk of the project's reserve base
Negative factors
- Information previously released
Evidence · table
“40.1”
Context: PROBABLE
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
probableEl Zorro Gold Project · goldTonnes: 42800000Grade: 0.93Grade Unit: g/tContained Metal: 1283Contained Unit: kozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- El Zorro Gold Project
- Commodity
- gold
- Region
- chile
- Reported Region
- Chile
- Ticker
- TSO
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Zeffron Reeves
- Resource group id
- resource:ef5cb4231687acf4cd71
- Deposit or zone
- Ternera Gold Deposit
Resource Data
- Category
- probable
- Tonnes
- 42800000
- Grade
- 0.93
- Grade Unit
- g/t
- Contained Metal
- 1283
- Contained Unit
- koz
- Cutoff Grade
- 0.3
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-09-01
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-09-18T00:00:00.000Z
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The total Ore Reserve of 1.28 Moz gold at Ternera represents a substantial, economically viable asset, providing high confidence for project development, though it is a restatement.
Positive factors
- Significant total Ore Reserve size
- Confirms economic viability of the project
- Strong foundation for project financing and development
Negative factors
- Information previously released
Evidence · table
“42.8”
Context: TOTAL
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Metallurgical Results (1)
mill_cipEl Zorro Gold Project · goldRecovery: 95 %View all detailsHide details
Identity
- Project
- El Zorro Gold Project
- Commodity
- gold
- Region
- chile
- Reported Region
- Chile
- Ticker
- TSO
Test Work
- Program Status
- detailed
- Test Type
- mill_cip
- Processing Route
- Standard CIP plant
Recovery
- Recovery
- 95 %
- Recovery Basis
- actual_test
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The 95% gold recovery from a standard CIP plant is a strong metallurgical outcome, significantly de-risking the processing aspect of the project and supporting the positive economic study results.
Positive factors
- High gold recovery for CIP plant
- Supports strong project economics
- Standard processing route reduces technical risk
Negative factors
- Information previously released as part of PFS
Evidence · text
“95% Au RECOVERY Standard CIP plant”
Tags used in scoring
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: processing_route matches the mill_cil signal
High Recoverypositive
Recovery at or above the exceptional band for the commodity and processing route.
Why it applies: 95% is at or above the exceptional band (95%)
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.