# Titan Mining Reports 146% Growth in Nine-Month Adjusted EBITDA to $19.8 Million and Advances U.S. Critical Minerals Strategy

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/titan-mining-reports-146-growth-in-nine-month-adjusted-ebitda-to-19-8-million-an--76c3beba-ffbb-48ad-91bf-70c1171f3849

Original source: https://orestocks.com/company/TI.TO/press-releases/8913125610042089

Publisher: orestocks

Original announcement: 2026-11-12T11:00:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-11-12T12:31:34.354Z

Atlas analysis updated: 2026-11-12T12:31:34.354Z

- Company: Titan Mining Corporation

- Ticker: TI.TO

- Exchange: Unavailable

- Region: New York State

- Primary commodity: Unavailable

- Secondary commodities: None reported

- Document categories: Production, Other, Metallurgy

- Extracted: 2026-11-12 12:19:23 UTC

Narrative sentiment: 0.80 · Bullish

## Minestarters Atlas summary

Titan Mining reported strong financial results for the first nine months of 2026, with Adjusted EBITDA increasing 146% to $19.8 million and net debt decreasing 54%. While Q3 zinc production was impacted by maintenance and lower grades, the company reaffirmed its full-year guidance and expects improved production in Q4. Concurrently, Titan is making significant progress in its U.S. critical minerals strategy, including a commercial framework with the U.S. Army for a graphite processing facility, advancement of the Kilbourne graphite project Feasibility Study, and optimization of germanium recovery.

Reasoning: Titan Mining reported strong financial growth and reaffirmed its zinc production guidance, indicating operational stability despite Q3 setbacks. Significant progress in its critical minerals strategy, particularly for graphite and germanium, signals future growth and diversification.

- Positive factor: Strong financial performance with significant Adjusted EBITDA growth

- Positive factor: Net debt reduction improving financial flexibility

- Positive factor: Reaffirmed full-year production and cost guidance for zinc

- Positive factor: Advancement of critical minerals strategy, including a commercial framework with the U.S. Army for graphite

- Positive factor: Kilbourne graphite project Feasibility Study on track for early 2027 release

- Positive factor: Progress in germanium recovery optimization

- Negative factor: Q3 zinc production impacted by temporary maintenance-driven delays and lower feed grade

- Negative factor: Net loss before tax in Q3 due to investment in growth strategy

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 10

## Classification and evidence

**QP/CP Signed**

Polarity: positive

Story-specific tag

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: Scientific and technical information related to exploration activities, zinc operations, germanium, and graphite development has been reviewed and approved by Qualified Persons.

Evidence · text

> The scientific and technical information contained in this news release related to the Company’s exploration activities and zinc operations has been reviewed and approved by Matthew Melnyk, CPG \#11540 \(AIPG\), Vice President Exploration and Geology of Titan, a Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects \(“NI 43-101"\). Mr. Melnyk is not independent of the Company. The scientific and technical information contained in this news release related to the Company’s germanium and graphite development has been reviewed and approved by Oliver Peters, MSc., P.Eng., who is a Qualified Person as defined by NI 43-101. Mr. Peters is independent of the Company.

**Production Delays**

Polarity: negative

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: Q3 2026 zinc production was affected by temporary maintenance-driven delays.

Evidence · text

> Quarterly production was affected by temporary maintenance-driven delays and lower grades

**Lower Feed Grade**

Polarity: negative

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: Q3 2026 zinc production was affected by lower feed grade.

Evidence · text

> Quarterly production was affected by temporary maintenance-driven delays and lower grades

**Project Advancement**

Polarity: positive

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The company is advancing its Kilbourne natural graphite project, graphite demonstration facility, and germanium initiatives.

Evidence · text

> Titan continues to advance its planned 40,000-tonne-per-year Kilbourne natural graphite project

**Strong Financial Performance**

Polarity: positive

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The company reported 146% growth in nine-month Adjusted EBITDA to $19.8 million.

Evidence · text

> Nine-month Adjusted EBITDA was $19.8 million, up 146% year-over-year.

**Mill Route**

Polarity: neutral

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: the document describes a flotation route \("concentrate"\)

## Extracted facts

Stored fact records: 1. Some facts used in scoring do not have a stored record.

## Metallurgical Results (1)

### Fact 1

[Link to this fact](https://atlas-aws.minestarters.com/news/titan-mining-reports-146-growth-in-nine-month-adjusted-ebitda-to-19-8-million-an--76c3beba-ffbb-48ad-91bf-70c1171f3849#fact-metallurgical-facts-0)

Empire State Mine · zinc

#### Identity

- Project: Empire State Mine
- Commodity: zinc
- Ticker: TI.TO

#### Recovery

- Recovery: 96.1 %
- Head Grade: 7.5
- Head Grade Unit: %
- Conc. Grade: 59.9
- Conc. Grade Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-12T00:00:00.000Z

Reasoning: Q3 2026 zinc production was affected by temporary maintenance and lower feed grade, leading to a lower production volume, though mill recovery and concentrate grade remained strong.

- Positive factor: Strong mill recovery

- Positive factor: High concentrate grade

- Negative factor: Production volume impacted by maintenance delays

- Negative factor: Lower feed grade

Evidence · table

> 13.67

Context: Payable zinc produced

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
