Summary

Silver Mines Limited announced a Definitive Feasibility Study (DFS) for its Bowdens Silver Project, confirming robust economics with a pre-tax NPV5% of A$1.04 billion and an IRR of 31.5%. The DFS led to a significant increase in Ore Reserves to 47.9 million tonnes at 60.8 g/t silver for 93.5 million ounces of contained silver, representing a 30% increase in contained silver. The company also completed a A$70 million capital raise and royalty buy-backs, further de-risking the project and providing funding for its development and ongoing exploration activities.

Reasoning: Silver Mines Limited announced a Definitive Feasibility Study (DFS) for its Bowdens Silver Project, confirming robust economics and significantly increasing Ore Reserves and updating the Mineral Resource Estimate. This was supported by a successful A$70 million capital raise and royalty buy-backs, de-risking the project and providing funding for its advancement.

Positive factors

  • Definitive Feasibility Study confirms robust economics for the Bowdens Silver Project with strong NPV and IRR.
  • Significant increase in Ore Reserves, with contained silver increasing by 30% to 93.5 million ounces and ore tonnes increasing by 46%.
  • Updated Mineral Resource Estimate reflects additional drilling and improved metallurgy.
  • Successful A$70 million capital raise provides funding for project development and exploration.
  • Royalty buy-backs simplify the project's royalty structure and increase direct exposure to future production.
  • Permitting process for the Bowdens Silver Project is advancing with DPHI assessment provided to IPC.

Negative factors

  • Stage 2 of the Life of Mine plan carries a higher level of uncertainty as its tailings landform design is at pre-feasibility study status.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 31

Atlas analysis — Silver Mines Limited: SVL: Quarterly Activities/Appendix 5B Cash Flow Report. proven 44600000 tonnes; probable 3300000 tonnes

Extracted facts

Stored fact records: 29. Some facts used in scoring do not have a stored record.

Resource Estimates (29)

provenBowdens Silver Project · silverTonnes: 44600000Grade: 88.5Grade Unit: mozContained Metal: 88.5Contained Unit: mozView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
silver
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:5d6086714d28131cd6a1
Mining method
underground
Ownership percent
100 %

Resource Data

Category
proven
Tonnes
44600000
Grade
88.5
Grade Unit
moz
Contained Metal
88.5
Contained Unit
moz
Cutoff Grade
30
Cutoff Unit
A$/t

Prior Estimate

Resource Date
2026-07-21
Prior Tonnes
32808219
Prior Contained Metal
71.7

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Proven Ore Reserve for silver is substantial at 44.6 Mt at 61.7 g/t, contributing significantly to the overall 30% increase in contained silver in reserves, indicating high confidence and improved project scale.

Positive factors

  • Proven Reserve category indicates high confidence in tonnage, grade, and shape.
  • Contained silver in Ore Reserves increased by 30% to 93.5 million ounces.
  • Ore tonnes increased by 46% relative to the 2024 estimate.

Evidence · table

“88.5”

Context: 44.6

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

provenBowdens Silver Project · zincTonnes: 44600000Grade: 165Grade Unit: ktContained Metal: 165Contained Unit: ktView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
zinc
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:5d6086714d28131cd6a1
Mining method
underground
Ownership percent
100 %

Resource Data

Category
proven
Tonnes
44600000
Grade
165
Grade Unit
kt
Contained Metal
165
Contained Unit
kt
Cutoff Grade
30
Cutoff Unit
A$/t

Prior Estimate

Resource Date
2026-07-21
Prior Tonnes
32808219

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Proven Ore Reserve for zinc is 44.6 Mt at 0.37%, providing a solid base for byproduct recovery and contributing to the overall project economics.

Positive factors

  • Proven Reserve category indicates high confidence in tonnage, grade, and shape.
  • Ore tonnes increased by 46% relative to the 2024 estimate.

Evidence · table

“165”

Context: 44.6

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

provenBowdens Silver Project · leadTonnes: 44600000Grade: 122Grade Unit: ktContained Metal: 122Contained Unit: ktView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
lead
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:5d6086714d28131cd6a1
Mining method
underground
Ownership percent
100 %

Resource Data

Category
proven
Tonnes
44600000
Grade
122
Grade Unit
kt
Contained Metal
122
Contained Unit
kt
Cutoff Grade
30
Cutoff Unit
A$/t

Prior Estimate

Resource Date
2026-07-21
Prior Tonnes
32808219

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Proven Ore Reserve for lead is 44.6 Mt at 0.27%, providing a solid base for byproduct recovery and contributing to the overall project economics.

Positive factors

  • Proven Reserve category indicates high confidence in tonnage, grade, and shape.
  • Ore tonnes increased by 46% relative to the 2024 estimate.

Evidence · table

“122”

Context: 44.6

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableBowdens Silver Project · silverTonnes: 3300000Grade: 4.9Grade Unit: mozContained Metal: 4.9Contained Unit: mozView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
silver
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:91bfad9b37aaed877c2e
Mining method
underground
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
3300000
Grade
4.9
Grade Unit
moz
Contained Metal
4.9
Contained Unit
moz
Cutoff Grade
30
Cutoff Unit
A$/t

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Probable Ore Reserve for silver is 3.3 Mt at 47.3 g/t, adding to the overall contained silver in reserves and indicating further economic potential.

Positive factors

  • Probable Reserve category indicates reasonable geological confidence.
  • Contained silver in Ore Reserves increased by 30% to 93.5 million ounces.
  • Ore tonnes increased by 46% relative to the 2024 estimate.

Evidence · table

“4.9”

Context: 3.3

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableBowdens Silver Project · zincTonnes: 3300000Grade: 7Grade Unit: ktContained Metal: 7Contained Unit: ktView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
zinc
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:91bfad9b37aaed877c2e
Mining method
underground
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
3300000
Grade
7
Grade Unit
kt
Contained Metal
7
Contained Unit
kt
Cutoff Grade
30
Cutoff Unit
A$/t

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Probable Ore Reserve for zinc is 3.3 Mt at 0.21%, contributing to the overall contained metal and project economics.

Positive factors

  • Probable Reserve category indicates reasonable geological confidence.
  • Ore tonnes increased by 46% relative to the 2024 estimate.

Evidence · table

“7”

Context: 3.3

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableBowdens Silver Project · leadTonnes: 3300000Grade: 5Grade Unit: ktContained Metal: 5Contained Unit: ktView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
lead
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:91bfad9b37aaed877c2e
Mining method
underground
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
3300000
Grade
5
Grade Unit
kt
Contained Metal
5
Contained Unit
kt
Cutoff Grade
30
Cutoff Unit
A$/t

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Probable Ore Reserve for lead is 3.3 Mt at 0.15%, contributing to the overall contained metal and project economics.

Positive factors

  • Probable Reserve category indicates reasonable geological confidence.
  • Ore tonnes increased by 46% relative to the 2024 estimate.

Evidence · table

“5”

Context: 3.3

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableBowdens Silver Project · silverTonnes: 47900000Grade: 93.5Grade Unit: mozContained Metal: 93.5Contained Unit: mozView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
silver
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:794aeacdea14e536c52b
Mining method
underground
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
47900000
Grade
93.5
Grade Unit
moz
Contained Metal
93.5
Contained Unit
moz
Cutoff Grade
30
Cutoff Unit
A$/t

Prior Estimate

Resource Date
2026-07-21
Prior Tonnes
32808219
Prior Contained Metal
71.7

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The total Ore Reserve for silver is 47.9 Mt at 60.8 g/t, resulting in 93.5 Moz of contained silver, representing a 30% increase in contained silver and a 46% increase in ore tonnes, significantly enhancing the project's scale and economic viability.

Positive factors

  • Total Ore Reserves for silver show a significant increase in contained metal and tonnage.
  • Contained silver in Ore Reserves increased by 30% to 93.5 million ounces.
  • Ore tonnes increased by 46% relative to the 2024 estimate.

Evidence · table

“93.5”

Context: 47.9

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableBowdens Silver Project · zincTonnes: 47900000Grade: 172Grade Unit: ktContained Metal: 172Contained Unit: ktView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
zinc
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:794aeacdea14e536c52b
Mining method
underground
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
47900000
Grade
172
Grade Unit
kt
Contained Metal
172
Contained Unit
kt
Cutoff Grade
30
Cutoff Unit
A$/t

Prior Estimate

Resource Date
2026-07-21
Prior Tonnes
32808219

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The total Ore Reserve for zinc is 47.9 Mt at 0.36%, providing a substantial base for byproduct recovery and contributing to the overall project economics.

Positive factors

  • Total Ore Reserves for zinc show a significant increase in tonnage.
  • Ore tonnes increased by 46% relative to the 2024 estimate.

Evidence · table

“172”

Context: 47.9

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableBowdens Silver Project · leadTonnes: 47900000Grade: 127Grade Unit: ktContained Metal: 127Contained Unit: ktView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
lead
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:794aeacdea14e536c52b
Mining method
underground
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
47900000
Grade
127
Grade Unit
kt
Contained Metal
127
Contained Unit
kt
Cutoff Grade
30
Cutoff Unit
A$/t

Prior Estimate

Resource Date
2026-07-21
Prior Tonnes
32808219

Metal Equivalent

Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The total Ore Reserve for lead is 47.9 Mt at 0.26%, providing a substantial base for byproduct recovery and contributing to the overall project economics.

Positive factors

  • Total Ore Reserves for lead show a significant increase in tonnage.
  • Ore tonnes increased by 46% relative to the 2024 estimate.

Evidence · table

“127”

Context: 47.9

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredBowdens Silver Project · silverTonnes: 105000000Grade: 139Grade Unit: mozContained Metal: 139Contained Unit: mozView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
silver
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:8b927b89cddbacde5d87
Mining method
underground
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
105000000
Grade
139
Grade Unit
moz
Contained Metal
139
Contained Unit
moz
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
58
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Measured Mineral Resource for silver is substantial at 105 Mt at 41 g/t, indicating high confidence in a significant portion of the resource, with transparent metal equivalent calculations.

Positive factors

  • Measured Resource category indicates high confidence in tonnage, grade, and shape.
  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Evidence · table

“139”

Context: 105

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredBowdens Silver Project · zincTonnes: 105000000Grade: 377Grade Unit: ktContained Metal: 377Contained Unit: ktView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
zinc
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:8b927b89cddbacde5d87
Mining method
underground
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
105000000
Grade
377
Grade Unit
kt
Contained Metal
377
Contained Unit
kt
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
58
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Measured Mineral Resource for zinc is 105 Mt at 0.36%, providing a high-confidence base for byproduct recovery, with transparent metal equivalent calculations.

Positive factors

  • Measured Resource category indicates high confidence in tonnage, grade, and shape.
  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Evidence · table

“377”

Context: 105

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredBowdens Silver Project · leadTonnes: 105000000Grade: 270Grade Unit: ktContained Metal: 270Contained Unit: ktView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
lead
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:8b927b89cddbacde5d87
Mining method
underground
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
105000000
Grade
270
Grade Unit
kt
Contained Metal
270
Contained Unit
kt
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
58
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Measured Mineral Resource for lead is 105 Mt at 0.26%, providing a high-confidence base for byproduct recovery, with transparent metal equivalent calculations.

Positive factors

  • Measured Resource category indicates high confidence in tonnage, grade, and shape.
  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Evidence · table

“270”

Context: 105

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredBowdens Silver Project · goldTonnes: 105000000Grade: 0.02Grade Unit: g/tContained Metal: 81Contained Unit: kozView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
gold
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:8b927b89cddbacde5d87
Mining method
underground
Ownership percent
100 %

Resource Data

Category
measured
Tonnes
105000000
Grade
0.02
Grade Unit
g/t
Contained Metal
81
Contained Unit
koz
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
58
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Measured Mineral Resource for gold is 105 Mt at 0.02 g/t, providing a high-confidence base for potential byproduct recovery, with transparent metal equivalent calculations.

Positive factors

  • Measured Resource category indicates high confidence in tonnage, grade, and shape.
  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Evidence · table

“0.02”

Context: 105

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedBowdens Silver Project · silverTonnes: 38000000Grade: 29Grade Unit: mozContained Metal: 29Contained Unit: mozView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
silver
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:1508aa5e567a95633401
Mining method
underground
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
38000000
Grade
29
Grade Unit
moz
Contained Metal
29
Contained Unit
moz
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
44
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Indicated Mineral Resource for silver is 38 Mt at 23 g/t, adding to the overall resource base with reasonable geological confidence and transparent metal equivalent calculations.

Positive factors

  • Indicated Resource category indicates reasonable geological confidence.
  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Evidence · table

“29”

Context: 38

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedBowdens Silver Project · zincTonnes: 38000000Grade: 163Grade Unit: ktContained Metal: 163Contained Unit: ktView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
zinc
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:1508aa5e567a95633401
Mining method
underground
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
38000000
Grade
163
Grade Unit
kt
Contained Metal
163
Contained Unit
kt
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
44
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Indicated Mineral Resource for zinc is 38 Mt at 0.43%, contributing to the overall resource base with reasonable geological confidence and transparent metal equivalent calculations.

Positive factors

  • Indicated Resource category indicates reasonable geological confidence.
  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Evidence · table

“163”

Context: 38

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedBowdens Silver Project · leadTonnes: 38000000Grade: 110Grade Unit: ktContained Metal: 110Contained Unit: ktView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
lead
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:1508aa5e567a95633401
Mining method
underground
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
38000000
Grade
110
Grade Unit
kt
Contained Metal
110
Contained Unit
kt
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
44
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Indicated Mineral Resource for lead is 38 Mt at 0.29%, contributing to the overall resource base with reasonable geological confidence and transparent metal equivalent calculations.

Positive factors

  • Indicated Resource category indicates reasonable geological confidence.
  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Evidence · table

“110”

Context: 38

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedBowdens Silver Project · goldTonnes: 38000000Grade: 0.08Grade Unit: g/tContained Metal: 103Contained Unit: kozView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
gold
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:1508aa5e567a95633401
Mining method
underground
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
38000000
Grade
0.08
Grade Unit
g/t
Contained Metal
103
Contained Unit
koz
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
44
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Indicated Mineral Resource for gold is 38 Mt at 0.08 g/t, contributing to the overall resource base with reasonable geological confidence and transparent metal equivalent calculations.

Positive factors

  • Indicated Resource category indicates reasonable geological confidence.
  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Evidence · table

“0.08”

Context: 38

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedBowdens Silver Project · silverTonnes: 143000000Grade: 168Grade Unit: mozContained Metal: 168Contained Unit: mozView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
silver
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:37d8c9b0cc229b77beaa
Mining method
underground
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
143000000
Grade
168
Grade Unit
moz
Contained Metal
168
Contained Unit
moz
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
54
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The combined Measured and Indicated Mineral Resource for silver is 143 Mt at 37 g/t, representing a significant high-confidence resource base with transparent metal equivalent calculations.

Positive factors

  • Combined Measured and Indicated Resource provides a large, high-confidence resource base.
  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Evidence · table

“168”

Context: 143

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedBowdens Silver Project · zincTonnes: 143000000Grade: 540Grade Unit: ktContained Metal: 540Contained Unit: ktView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
zinc
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:37d8c9b0cc229b77beaa
Mining method
underground
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
143000000
Grade
540
Grade Unit
kt
Contained Metal
540
Contained Unit
kt
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
54
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The combined Measured and Indicated Mineral Resource for zinc is 143 Mt at 0.38%, representing a significant high-confidence resource base for byproduct recovery with transparent metal equivalent calculations.

Positive factors

  • Combined Measured and Indicated Resource provides a large, high-confidence resource base.
  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Evidence · table

“540”

Context: 143

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedBowdens Silver Project · leadTonnes: 143000000Grade: 380Grade Unit: ktContained Metal: 380Contained Unit: ktView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
lead
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:37d8c9b0cc229b77beaa
Mining method
underground
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
143000000
Grade
380
Grade Unit
kt
Contained Metal
380
Contained Unit
kt
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
54
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The combined Measured and Indicated Mineral Resource for lead is 143 Mt at 0.27%, representing a significant high-confidence resource base for byproduct recovery with transparent metal equivalent calculations.

Positive factors

  • Combined Measured and Indicated Resource provides a large, high-confidence resource base.
  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Evidence · table

“380”

Context: 143

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedBowdens Silver Project · goldTonnes: 143000000Grade: 0.04Grade Unit: g/tContained Metal: 184Contained Unit: kozView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
gold
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:37d8c9b0cc229b77beaa
Mining method
underground
Ownership percent
100 %

Resource Data

Category
indicated
Tonnes
143000000
Grade
0.04
Grade Unit
g/t
Contained Metal
184
Contained Unit
koz
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
54
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The combined Measured and Indicated Mineral Resource for gold is 143 Mt at 0.04 g/t, representing a significant high-confidence resource base for byproduct recovery with transparent metal equivalent calculations.

Positive factors

  • Combined Measured and Indicated Resource provides a large, high-confidence resource base.
  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Evidence · table

“0.04”

Context: 143

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredBowdens Silver Project · silverTonnes: 30000000Grade: 16Grade Unit: mozContained Metal: 16Contained Unit: mozView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
silver
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:8d218e21fdeb16113929
Mining method
underground
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
30000000
Grade
16
Grade Unit
moz
Contained Metal
16
Contained Unit
moz
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
38
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Inferred Mineral Resource for silver is 30 Mt at 16 g/t, providing exploration upside but with lower confidence, requiring further drilling for upgrade.

Positive factors

  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Negative factors

  • Inferred Resource category indicates lower geological confidence and cannot support economic studies alone.

Evidence · table

“16”

Context: 30

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredBowdens Silver Project · zincTonnes: 30000000Grade: 134Grade Unit: ktContained Metal: 134Contained Unit: ktView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
zinc
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:8d218e21fdeb16113929
Mining method
underground
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
30000000
Grade
134
Grade Unit
kt
Contained Metal
134
Contained Unit
kt
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
38
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Inferred Mineral Resource for zinc is 30 Mt at 0.44%, providing exploration upside but with lower confidence, requiring further drilling for upgrade.

Positive factors

  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Negative factors

  • Inferred Resource category indicates lower geological confidence and cannot support economic studies alone.

Evidence · table

“134”

Context: 30

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredBowdens Silver Project · leadTonnes: 30000000Grade: 101Grade Unit: ktContained Metal: 101Contained Unit: ktView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
lead
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:8d218e21fdeb16113929
Mining method
underground
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
30000000
Grade
101
Grade Unit
kt
Contained Metal
101
Contained Unit
kt
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
38
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Inferred Mineral Resource for lead is 30 Mt at 0.33%, providing exploration upside but with lower confidence, requiring further drilling for upgrade.

Positive factors

  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Negative factors

  • Inferred Resource category indicates lower geological confidence and cannot support economic studies alone.

Evidence · table

“101”

Context: 30

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredBowdens Silver Project · goldTonnes: 30000000Grade: 0.12Grade Unit: g/tContained Metal: 118Contained Unit: kozView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
gold
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:8d218e21fdeb16113929
Mining method
underground
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
30000000
Grade
0.12
Grade Unit
g/t
Contained Metal
118
Contained Unit
koz
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
38
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Inferred Mineral Resource for gold is 30 Mt at 0.12 g/t, providing exploration upside but with lower confidence, requiring further drilling for upgrade.

Positive factors

  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Negative factors

  • Inferred Resource category indicates lower geological confidence and cannot support economic studies alone.

Evidence · table

“0.12”

Context: 30

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredBowdens Silver Project · silverTonnes: 173000000Grade: 184Grade Unit: mozContained Metal: 184Contained Unit: mozView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
silver
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:76f36463282578e26ea4
Mining method
underground
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
173000000
Grade
184
Grade Unit
moz
Contained Metal
184
Contained Unit
moz
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
51
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The total Mineral Resource for silver is 173 Mt at 33 g/t, resulting in 184 Moz of contained silver, representing a large resource base, though with a notable Inferred component.

Positive factors

  • Total Mineral Resource for silver is substantial, providing a large resource base.
  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Negative factors

  • The total resource includes a significant Inferred component, indicating lower overall confidence.

Evidence · table

“184”

Context: 173

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredBowdens Silver Project · zincTonnes: 173000000Grade: 674Grade Unit: ktContained Metal: 674Contained Unit: ktView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
zinc
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:76f36463282578e26ea4
Mining method
underground
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
173000000
Grade
674
Grade Unit
kt
Contained Metal
674
Contained Unit
kt
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
51
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The total Mineral Resource for zinc is 173 Mt at 0.39%, providing a substantial resource base for byproduct recovery, though with a notable Inferred component.

Positive factors

  • Total Mineral Resource for zinc is substantial, providing a large resource base.
  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Negative factors

  • The total resource includes a significant Inferred component, indicating lower overall confidence.

Evidence · table

“674”

Context: 173

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredBowdens Silver Project · leadTonnes: 173000000Grade: 481Grade Unit: ktContained Metal: 481Contained Unit: ktView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
lead
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:76f36463282578e26ea4
Mining method
underground
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
173000000
Grade
481
Grade Unit
kt
Contained Metal
481
Contained Unit
kt
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
51
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The total Mineral Resource for lead is 173 Mt at 0.28%, providing a substantial resource base for byproduct recovery, though with a notable Inferred component.

Positive factors

  • Total Mineral Resource for lead is substantial, providing a large resource base.
  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Negative factors

  • The total resource includes a significant Inferred component, indicating lower overall confidence.

Evidence · table

“481”

Context: 173

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredBowdens Silver Project · goldTonnes: 173000000Grade: 0.05Grade Unit: g/tContained Metal: 302Contained Unit: kozView all details
Link to this fact

Identity

Project
Bowdens Silver Project
Commodity
gold
Region
australia_nsw
Reported Region
New South Wales
Ticker
SVL

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Resource group id
resource:76f36463282578e26ea4
Mining method
underground
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
173000000
Grade
0.05
Grade Unit
g/t
Contained Metal
302
Contained Unit
koz
Cutoff Grade
25
Cutoff Unit
g/t AgEq

Prior Estimate

Resource Date
2026-07-21

Metal Equivalent

Metal Eq. Grade
51
Metal Eq. Unit
g/t AgEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The total Mineral Resource for gold is 173 Mt at 0.05 g/t, providing a substantial resource base for byproduct recovery, though with a notable Inferred component.

Positive factors

  • Total Mineral Resource for gold is substantial, providing a large resource base.
  • Metal equivalent assumptions are disclosed, providing transparency for the AgEq calculation.

Negative factors

  • The total resource includes a significant Inferred component, indicating lower overall confidence.

Evidence · table

“0.05”

Context: 173

Tags used in scoring

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.