# Spartan Metals Announces US$2.14 Billion After Tax NPV8 and 30.9% IRR for Victorio Tungsten-Molybdenum Project PEA

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/spartan-metals-announces-us-2-14-billion-after-tax-npv8-and-30-9-irr-for-victori--c365e8df-f754-496c-8135-090d897051ab

Original source: https://www.juniorminingnetwork.com/junior-miner-news/press-releases/3434-tsx-venture/w/215113-spartan-metals-announces-us-2-14-billion-after-tax-npv8-and-30-9-irr-for-victorio-tungsten-molybdenum-project-pea.html

Publisher: jmn

Original announcement: 2026-11-19T22:14:08.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-11-19T12:31:40.822Z

Atlas analysis updated: 2026-11-19T12:31:40.822Z

- Company: Spartan Metals Corp.

- Ticker: W

- Exchange: TSXV

- Region: New Mexico

- Primary commodity: Tungsten

- Secondary commodities: Molybdenum, Fluorspar, Beryllium

- Document categories: Other, Metallurgy

- Extracted: 2026-11-19 12:22:12 UTC

Narrative sentiment: 0.80 · Bullish

## Minestarters Atlas summary

Spartan Metals announced a positive Preliminary Economic Assessment \(PEA\) for its Victorio Tungsten-Molybdenum Project in New Mexico, outlining a robust 24-year underground block cave operation. The PEA projects an after-tax NPV8 of US$2.14 billion and an Internal Rate of Return \(IRR\) of 30.9% at base case metal prices, with a 3.2-year payback period. The study highlights significant upside potential at higher metal prices and positions Victorio as a potential long-term domestic source of critical minerals.

Reasoning: Spartan Metals announced a highly positive Preliminary Economic Assessment for its Victorio Tungsten-Molybdenum Project, demonstrating strong economics with a US$2.14 billion after-tax NPV8 and 30.9% IRR at base case prices, and significant upside potential. The study outlines a long-life operation with a quick payback, positioning the project as a potential domestic source for critical minerals. However, the preliminary nature of the study and reliance on Inferred Resources introduce some risk.

- Positive factor: Strong after-tax NPV8 of US$2.14 billion and IRR of 30.9% at base case prices.

- Positive factor: Significant upside potential with higher metal prices, reaching US$4.02 billion NPV8 and 43.3% IRR.

- Positive factor: Long operating life of 24 years with a short payback period of 3.2 years.

- Positive factor: PEA outlines a robust underground block cave operation with established processing methods.

- Positive factor: Potential for long-term domestic sourcing of critical minerals \(tungsten and molybdenum\) in the US.

- Negative factor: PEA is preliminary in nature and includes Inferred Mineral Resources, which are considered too speculative for economic considerations as Mineral Reserves.

- Negative factor: Further metallurgical work is required to confirm recoveries across representative material and refine processing design.

- Negative factor: The PEA is subject to various risks and uncertainties, including metal prices, regulatory changes, and financing.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 8

## Classification and evidence

**PEA-Supporting**

Polarity: neutral

Story-specific tag

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: The document is a Preliminary Economic Assessment \(PEA\) for the Victorio Tungsten-Molybdenum Project.

Evidence · text

> Spartan Metals Announces US$2.14 Billion After Tax NPV8 and 30.9% IRR for Victorio Tungsten-Molybdenum Project PEA

**QP/CP Signed**

Polarity: positive

Story-specific tag

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: Independent Qualified Persons from SRK Consulting and Teal CPG, Inc. are listed as having reviewed and approved the scientific and technical information.

Evidence · table

> Anton Chan, P.Eng. Bruno Serra Eric Olin, SME-RM, MAusIMM Katie Bertrando, SME-RM Terry Braun, PE

Context: Independent QP

**NI 43-101 Compliant**

Polarity: positive

Story-specific tag

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: The technical report for the PEA will be filed in accordance with National Instrument 43-101.

Evidence · text

> A technical report prepared in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects \("NI 43-101"\) will be filed on SEDAR+ \( www.sedarplus.ca \) and on the Company's website within 45 days of this news release.

**Inferred Resource**

Polarity: negative

Story-specific tag

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The PEA includes Inferred Mineral Resources that are considered too speculative geologically to be categorized as Mineral Reserves.

Evidence · text

> The PEA is preliminary in nature, that it includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is no certainty that the PEA will be realized.

**Preliminary Study**

Polarity: neutral

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The document explicitly states that the PEA is preliminary in nature.

Evidence · text

> The PEA is preliminary in nature, that it includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is no certainty that the PEA will be realized.

**Upside Potential**

Polarity: positive

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The PEA highlights significant upside potential with higher metal prices, showing a substantial increase in NPV and IRR.

Evidence · text

> Strongly leveraged to metal prices with after-tax US$ 4.02 billion NPV 8 and an IRR of 43.3% at US$2,000 WO 3 and US$25 molybdenum.

**Long Mine Life**

Polarity: positive

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The PEA outlines a 24-year operating life for the project.

Evidence · table

> 24 years

Context: Operating life

**Quick Payback**

Polarity: positive

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The model indicates an after-tax payback period of approximately 3.2 years.

Evidence · text

> estimated 3.2-year after-tax payback of the initial capital investment of US$683.0 million.

**Underground Mining**

Polarity: neutral

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The PEA evaluates an underground block cave operation.

Evidence · table

> Underground block cave

Context: Mining approach

**Domestic Supply Potential**

Polarity: positive

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The project is positioned as a potential long-term domestic source of tungsten and molybdenum for U.S. industrial and defense customers.

Evidence · text

> Victorio, which is supported by the results of this PEA, could become a lasting domestic source of tungsten and molybdenum for U.S. industrial and defense customers.

**Further Work Required**

Polarity: neutral

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The PEA recommends further resource evaluation, mine design, metallurgical testing, engineering, environmental studies and permitting to advance the project to PFS level.

Evidence · text

> Advancing Victorio toward a development decision will require further resource evaluation, mine design, metallurgical testing, engineering, environmental studies and permitting, together with financing.

**Metallurgical Test Work Required**

Polarity: negative

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: Further metallurgical work is required to confirm recoveries across representative material and refine the processing design.

Evidence · text

> Further metallurgical work is required to confirm recoveries across representative material and refine the processing design.

**Mill Route**

Polarity: neutral

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: the document describes a flotation route \("flotation"\)

**Gravity Route**

Polarity: neutral

Definition: Gravity separation forms a material part of the flowsheet.

Why it applies: the document describes a gravity route \("gravity"\)

## Extracted facts

Stored fact records: 4. Some facts used in scoring do not have a stored record.

## Metallurgical Results (4)

### flotation

[Link to this fact](https://atlas-aws.minestarters.com/news/spartan-metals-announces-us-2-14-billion-after-tax-npv8-and-30-9-irr-for-victori--c365e8df-f754-496c-8135-090d897051ab#fact-metallurgical-facts-2)

Victorio Tungsten-Molybdenum Project · molybdenum

#### Identity

- Project: Victorio Tungsten-Molybdenum Project
- Commodity: molybdenum
- Region: mexico
- Reported Region: New Mexico
- Ticker: W

#### Test Work

- Program Status: preliminary
- Test Type: flotation
- Processing Route: molybdenum flotation circuit

#### Recovery

- Recovery: 85 %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-19T00:00:00.000Z

Reasoning: The PEA assumes a strong molybdenum recovery of 85% via flotation, which is a positive indicator for the project's economics. However, this is a preliminary assumption and requires further test work for confirmation.

- Positive factor: High molybdenum recovery of 85% is a strong result for a preliminary assessment.

- Positive factor: Flotation is a well-established processing method for molybdenum.

- Negative factor: Further metallurgical work is required to confirm recoveries across representative material and refine the processing design.

Evidence · table

> 85%

Context: Molybdenum recovery

#### Tags used in scoring

**Mill Route**

Polarity: neutral

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: processing\_route matches the flotation signal

**Byproduct Commodity**

Polarity: neutral

Definition: The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

### flotation

[Link to this fact](https://atlas-aws.minestarters.com/news/spartan-metals-announces-us-2-14-billion-after-tax-npv8-and-30-9-irr-for-victori--c365e8df-f754-496c-8135-090d897051ab#fact-metallurgical-facts-3)

Victorio Tungsten-Molybdenum Project · tungsten

#### Identity

- Project: Victorio Tungsten-Molybdenum Project
- Commodity: tungsten
- Region: mexico
- Reported Region: New Mexico
- Ticker: W

#### Test Work

- Program Status: preliminary
- Test Type: flotation
- Processing Route: before APT processing

#### Recovery

- Recovery: 75 %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-19T00:00:00.000Z

Reasoning: The PEA assumes a 75% WO₃ recovery before APT processing, which is a reasonable preliminary figure. Confirmation through further metallurgical test work is needed to de-risk this assumption.

- Positive factor: 75% WO₃ recovery before APT processing is a reasonable starting point for a preliminary assessment.

- Negative factor: Further metallurgical work is required to confirm recoveries across representative material and refine the processing design.

Evidence · table

> 75%

Context: WO₃ recovery before APT processing

#### Tags used in scoring

**Mill Route**

Polarity: neutral

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: processing\_route matches the flotation signal

**Byproduct Commodity**

Polarity: neutral

Definition: The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

### chemical treatment

[Link to this fact](https://atlas-aws.minestarters.com/news/spartan-metals-announces-us-2-14-billion-after-tax-npv8-and-30-9-irr-for-victori--c365e8df-f754-496c-8135-090d897051ab#fact-metallurgical-facts-4)

Victorio Tungsten-Molybdenum Project · tungsten

#### Identity

- Project: Victorio Tungsten-Molybdenum Project
- Commodity: tungsten
- Region: mexico
- Reported Region: New Mexico
- Ticker: W

#### Test Work

- Program Status: preliminary
- Test Type: chemical treatment
- Processing Route: APT plant

#### Recovery

- Recovery: 97 %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-19T00:00:00.000Z

Reasoning: The PEA projects a very high 97% WO₃ recovery in the APT plant, which is a strong positive for the project's overall tungsten economics and value-add. This assumption, however, requires further validation.

- Positive factor: Very high 97% WO₃ recovery in the APT plant indicates efficient downstream processing.

- Positive factor: Producing APT on site adds value and positions the project strategically in the tungsten supply chain.

- Negative factor: Further metallurgical work is required to confirm recoveries across representative material and refine the processing design.

Evidence · table

> 97%

Context: WO₃ recovery in APT plant

#### Tags used in scoring

**Byproduct Commodity**

Polarity: neutral

Definition: The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

### combined processing

[Link to this fact](https://atlas-aws.minestarters.com/news/spartan-metals-announces-us-2-14-billion-after-tax-npv8-and-30-9-irr-for-victori--c365e8df-f754-496c-8135-090d897051ab#fact-metallurgical-facts-5)

Victorio Tungsten-Molybdenum Project · tungsten

#### Identity

- Project: Victorio Tungsten-Molybdenum Project
- Commodity: tungsten
- Region: mexico
- Reported Region: New Mexico
- Ticker: W

#### Test Work

- Program Status: preliminary
- Test Type: combined processing
- Processing Route: combined WO₃ recovery through both stages

#### Recovery

- Recovery: 72.75 %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-19T00:00:00.000Z

Reasoning: The combined WO₃ recovery of 72.75% is a good overall figure for the project, reflecting the efficiency of the proposed two-stage processing. This is a key economic driver that needs further confirmation.

- Positive factor: Combined WO₃ recovery of 72.75% is a solid overall recovery for a tungsten project at the PEA stage.

- Negative factor: Further metallurgical work is required to confirm recoveries across representative material and refine the processing design.

Evidence · table

> 72.75%

Context: Combined WO₃ recovery through both stages

#### Tags used in scoring

**Byproduct Commodity**

Polarity: neutral

Definition: The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.