SMI: Noosa Mining Conference Presentation
Original announcement by asx on
- Company
- Santana Minerals Limited
- Ticker
- SMI
- Exchange
- ASX
- Region
- New Zealand
- Primary commodity
- Gold
- Secondary commodities
- None reported
- Document categories
- Other, Resource update
- Extracted
- 2026-11-11 01:03:27 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Santana Minerals presented its Bendigo-Ophir Gold Project PFS summary, highlighting a 1.2 Moz gold reserve at 2.6 g/t. The project is in an advanced permitting stage with a draft FTA decision expected in November 2026 and a target for first gold in 2028.
Reasoning: The presentation summarizes a Pre-Feasibility Study (PFS) for the Bendigo-Ophir project, highlighting a significant gold reserve and advanced project economics.
Positive factors
- Substantial gold discovery reserve of 1.2 M oz @ 2.6g/t Gold
- High NPV of A$2.1 billion at $6,000/oz gold
- Advanced permitting status with draft decision expected Nov 2026
- Strong cash position of ~A$175m
Negative factors
- Financing requirement of A$277 million noted
- Permitting decisions (FTA) still pending
Facts used in scoring: 3

Classification and evidence
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The presentation explicitly states a gold discovery Reserve of 1.2 M oz @ 2.6g/t Gold.
Evidence · text
“A substantial gold discovery Reserve of 1.2 M oz @ 2.6g/t Gold”
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: The report references the 2012 Edition of the JORC Code, which is the standard for the region/context provided.
Evidence · text
“issued in accordance with the 2012 Edition of the JORC Australasian Code”
Extracted facts
Stored fact records: 3. Some facts used in scoring do not have a stored record.
Resource Estimates (3)
probablegoldTonnes: 27500000Grade: 2.6Grade Unit: g/tContained Metal: 1.2Contained Unit: m ozView all detailsHide details
Identity
- Commodity
- gold
- Region
- new zealand
- Reported Region
- New Zealand
- Ticker
- SMI
Resource scope
- Estimate type
- reserve
- Effective date
- 2025-06-30T00:00:00.000Z
- Reporting standards
- jorc
- Resource group id
- resource:41ab3fb831c95d3cbcd9
- Deposit or zone
- Bendigo-Ophir
- Mining method
- combined
Resource Data
- Category
- probable
- Tonnes
- 27500000
- Grade
- 2.6
- Grade Unit
- g/t
- Contained Metal
- 1.2
- Contained Unit
- m oz
Prior Estimate
- Resource Date
- 2025-06-30
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: Reported gold reserve from the PFS.
Positive factors
- Significant reserve scale of 1.2 Moz
Evidence · text
“A substantial gold discovery Reserve of 1.2 M oz @ 2.6g/t Gold”
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedgoldView all detailsHide details
Identity
- Commodity
- gold
- Region
- new zealand
- Reported Region
- New Zealand
- Ticker
- SMI
Resource scope
- Estimate type
- resource
- Effective date
- 2025-06-30T00:00:00.000Z
- Reporting standards
- jorc
- Resource group id
- resource:a8127eeb211c837462a4
- Mining method
- combined
Resource Data
- Category
- indicated
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: Mention of resource category split in the PFS production model.
Positive factors
- High proportion of Indicated resources (93%)
Evidence · text
“approximately 93% is within the Indicated Resources category”
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredgoldView all detailsHide details
Identity
- Commodity
- gold
- Region
- new zealand
- Reported Region
- New Zealand
- Ticker
- SMI
Resource scope
- Estimate type
- resource
- Effective date
- 2025-06-30T00:00:00.000Z
- Reporting standards
- jorc
- Resource group id
- resource:8959cab33911215532cd
- Mining method
- combined
Resource Data
- Category
- inferred
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-11T00:00:00.000Z
Reasoning: Mention of resource category split in the PFS production model.
Negative factors
- Low geological confidence in Inferred category
Evidence · text
“the balance (7%) being classified within the Inferred Resources category”
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.