Silver Elephant to Submit Environmental Impact Assessment for 12,000 Tonne-per-Day Pulacayo-Paca Processing Plant; Environmental License Decision Expected by June 2027
Original announcement by tmx on
- Company
- Silver Elephant Mining Corp.
- Ticker
- ELEF
- Exchange
- TSX
- Region
- Bolivia
- Primary commodity
- Silver
- Secondary commodities
- Zinc, Lead
- Document categories
- Permitting, Resource update
- Extracted
- 2026-11-13 14:23:55 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Silver Elephant is preparing to submit an Environmental Impact Assessment for a proposed 12,000 tonne-per-day processing plant at the Pulacayo-Paca project in Bolivia by December 2026. An environmental license decision is anticipated by mid-2027. The announcement also restates the 2020 Mineral Resource Estimate for the project.
Reasoning: The company is reaching a major permitting milestone for a large-scale processing plant, though the underlying resource data is historical and economic studies are pending.
Positive factors
- Advancing toward submission of Environmental Impact Assessment (EEIA-AI) by end of December 2026
- Project classified as Category 1, requiring most comprehensive assessment, indicating significant scale
- Engineering and technical studies for the 12,000 tpd plant are substantially complete
- Historical production data provides a basis for plant design
Negative factors
- Environmental license decision (DIA) is not expected until mid-2027
- Resource estimate is historical (2020) and has not been updated to reflect recent oxide mining
- No current feasibility or pre-feasibility study has been completed for Pulacayo or Paca
Facts used in scoring: 34

Classification and evidence
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: The mineral resource estimate was prepared in accordance with NI 43-101 standards.
Evidence · text
“estimated in accordance with National Instrument 43-101”
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: The resource estimate is from October 2020, which is more than 2 years old.
Evidence · text
“effective date of October 13, 2020”
Extracted facts
Stored fact records: 34. Some facts used in scoring do not have a stored record.
Resource Estimates (34)
indicatedPulacayo-Paca · silverTonnes: 1090000Grade: 4.4Grade Unit: mozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- silver
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:8911a25e091f146d4c19
- Deposit or zone
- Oxide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- indicated
- Tonnes
- 1090000
- Grade
- 4.4
- Grade Unit
- moz
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data.
Negative factors
- Historical data (2020)
- Does not reflect recent oxide mining
Evidence · table
“4.4”
Context: 1,090,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
inferredPulacayo-Paca · silverTonnes: 25000Grade: 0Grade Unit: mozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- silver
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:3ff4557f7aa0577c3e1f
- Deposit or zone
- Oxide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- inferred
- Tonnes
- 25000
- Grade
- 0
- Grade Unit
- moz
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data.
Negative factors
- Historical data (2020)
Evidence · table
“0.0”
Context: 25,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
indicatedPulacayo-Paca · silverTonnes: 24600000Grade: 60.1Grade Unit: mozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- silver
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:35378546267c058f4ee8
- Deposit or zone
- Sulphide in-pit
- Mining method
- combined
- Material type
- sulphide
Resource Data
- Category
- indicated
- Tonnes
- 24600000
- Grade
- 60.1
- Grade Unit
- moz
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data.
Negative factors
- Historical data (2020)
Evidence · table
“60.1”
Context: 24,600,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
indicatedPulacayo-Paca · zincTonnes: 24600000Grade: 884Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- zinc
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:35378546267c058f4ee8
- Deposit or zone
- Sulphide in-pit
- Mining method
- combined
- Material type
- sulphide
Resource Data
- Category
- indicated
- Tonnes
- 24600000
- Grade
- 884
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data.
Negative factors
- Historical data (2020)
Evidence · table
“884.0”
Context: 24,600,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
indicatedPulacayo-Paca · leadTonnes: 24600000Grade: 379.6Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- lead
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:35378546267c058f4ee8
- Deposit or zone
- Sulphide in-pit
- Mining method
- combined
- Material type
- sulphide
Resource Data
- Category
- indicated
- Tonnes
- 24600000
- Grade
- 379.6
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data.
Negative factors
- Historical data (2020)
Evidence · table
“379.6”
Context: 24,600,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
inferredPulacayo-Paca · silverTonnes: 745000Grade: 2Grade Unit: mozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- silver
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:1d210ff03a5607a4d325
- Deposit or zone
- Sulphide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- inferred
- Tonnes
- 745000
- Grade
- 2
- Grade Unit
- moz
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
Evidence · table
“2.0”
Context: 745,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
inferredPulacayo-Paca · zincTonnes: 745000Grade: 29.4Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- zinc
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:1d210ff03a5607a4d325
- Deposit or zone
- Sulphide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- inferred
- Tonnes
- 745000
- Grade
- 29.4
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
Evidence · table
“29.4”
Context: 745,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
inferredPulacayo-Paca · leadTonnes: 745000Grade: 10Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- lead
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:1d210ff03a5607a4d325
- Deposit or zone
- Sulphide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- inferred
- Tonnes
- 745000
- Grade
- 10
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
Evidence · table
“10.0”
Context: 745,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
indicatedPulacayo-Paca · silverTonnes: 660000Grade: 5.7Grade Unit: mozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- silver
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:a154c42f3101b80b8058
- Deposit or zone
- Sulphide out-of-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- indicated
- Tonnes
- 660000
- Grade
- 5.7
- Grade Unit
- moz
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
- Does not reflect recent oxide mining
Evidence · table
“5.7”
Context: 660,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
indicatedPulacayo-Paca · zincTonnes: 660000Grade: 19.6Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- zinc
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:a154c42f3101b80b8058
- Deposit or zone
- Sulphide out-of-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- indicated
- Tonnes
- 660000
- Grade
- 19.6
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
- Does not reflect recent oxide mining
Evidence · table
“19.6”
Context: 660,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
indicatedPulacayo-Paca · leadTonnes: 660000Grade: 6.4Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- lead
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:a154c42f3101b80b8058
- Deposit or zone
- Sulphide out-of-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- indicated
- Tonnes
- 660000
- Grade
- 6.4
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
- Does not reflect recent oxide mining
Evidence · table
“6.4”
Context: 660,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
inferredPulacayo-Paca · silverTonnes: 900000Grade: 5.2Grade Unit: mozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- silver
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:d5b4e943ac062f61f532
- Deposit or zone
- Sulphide out-of-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- inferred
- Tonnes
- 900000
- Grade
- 5.2
- Grade Unit
- moz
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
Evidence · table
“5.2”
Context: 900,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
inferredPulacayo-Paca · zincTonnes: 900000Grade: 42.4Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- zinc
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:d5b4e943ac062f61f532
- Deposit or zone
- Sulphide out-of-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- inferred
- Tonnes
- 900000
- Grade
- 42.4
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
Evidence · table
“42.4”
Context: 900,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
inferredPulacayo-Paca · leadTonnes: 900000Grade: 8.3Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- lead
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:d5b4e943ac062f61f532
- Deposit or zone
- Sulphide out-of-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- inferred
- Tonnes
- 900000
- Grade
- 8.3
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
Evidence · table
“8.3”
Context: 900,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
indicatedPulacayo-Paca · silverTonnes: 26350000Grade: 70.2Grade Unit: mozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- silver
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:4fcf6f0be95ddf86113f
- Deposit or zone
- Oxide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- indicated
- Tonnes
- 26350000
- Grade
- 70.2
- Grade Unit
- moz
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
- Does not reflect recent oxide mining
Evidence · table
“70.2”
Context: 26,350,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
indicatedPulacayo-Paca · zincTonnes: 26350000Grade: 903.7Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- zinc
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:4fcf6f0be95ddf86113f
- Deposit or zone
- Oxide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- indicated
- Tonnes
- 26350000
- Grade
- 903.7
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
- Does not reflect recent oxide mining
Evidence · table
“903.7”
Context: 26,350,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
indicatedPulacayo-Paca · leadTonnes: 26350000Grade: 386Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- lead
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:4fcf6f0be95ddf86113f
- Deposit or zone
- Oxide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- indicated
- Tonnes
- 26350000
- Grade
- 386
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
- Does not reflect recent oxide mining
Evidence · table
“386.0”
Context: 26,350,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
inferredPulacayo-Paca · silverTonnes: 1670000Grade: 7.2Grade Unit: mozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- silver
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:ca3fdf7e5c2c1a17fb77
- Deposit or zone
- Oxide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- inferred
- Tonnes
- 1670000
- Grade
- 7.2
- Grade Unit
- moz
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
Evidence · table
“7.2”
Context: 1,670,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
inferredPulacayo-Paca · zincTonnes: 1670000Grade: 71.8Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- zinc
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:ca3fdf7e5c2c1a17fb77
- Deposit or zone
- Oxide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- inferred
- Tonnes
- 1670000
- Grade
- 71.8
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
Evidence · table
“71.8”
Context: 1,670,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
inferredPulacayo-Paca · leadTonnes: 1670000Grade: 18.4Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- lead
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:ca3fdf7e5c2c1a17fb77
- Deposit or zone
- Oxide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- inferred
- Tonnes
- 1670000
- Grade
- 18.4
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
Evidence · table
“18.4”
Context: 1,670,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
indicatedPulacayo-Paca · silverTonnes: 1095000Grade: 6.5Grade Unit: mozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- silver
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:3d8d32cea879ac96cef1
- Deposit or zone
- Oxide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- indicated
- Tonnes
- 1095000
- Grade
- 6.5
- Grade Unit
- moz
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
- Does not reflect recent oxide mining
Evidence · table
“6.5”
Context: 1,095,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
inferredPulacayo-Paca · silverTonnes: 345000Grade: 1.5Grade Unit: mozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- silver
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:e77c5cae613b893636b8
- Deposit or zone
- Oxide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- inferred
- Tonnes
- 345000
- Grade
- 1.5
- Grade Unit
- moz
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
Evidence · table
“1.5”
Context: 345,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
indicatedPulacayo-Paca · silverTonnes: 20595000Grade: 30.5Grade Unit: mozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- silver
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:3a79f6396ac4221d9869
- Deposit or zone
- Sulphide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- indicated
- Tonnes
- 20595000
- Grade
- 30.5
- Grade Unit
- moz
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
- Does not reflect recent oxide mining
Evidence · table
“30.5”
Context: 20,595,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
indicatedPulacayo-Paca · zincTonnes: 20595000Grade: 485.8Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- zinc
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:3a79f6396ac4221d9869
- Deposit or zone
- Sulphide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- indicated
- Tonnes
- 20595000
- Grade
- 485.8
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
- Does not reflect recent oxide mining
Evidence · table
“485.8”
Context: 20,595,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
indicatedPulacayo-Paca · leadTonnes: 20595000Grade: 304.2Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- lead
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:3a79f6396ac4221d9869
- Deposit or zone
- Sulphide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- indicated
- Tonnes
- 20595000
- Grade
- 304.2
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
- Does not reflect recent oxide mining
Evidence · table
“304.2”
Context: 20,595,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
inferredPulacayo-Paca · silverTonnes: 3050000Grade: 4.5Grade Unit: mozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- silver
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:d2d7767d74b7d85ac9c7
- Deposit or zone
- Sulphide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- inferred
- Tonnes
- 3050000
- Grade
- 4.5
- Grade Unit
- moz
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
Evidence · table
“4.5”
Context: 3,050,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
inferredPulacayo-Paca · zincTonnes: 3050000Grade: 51.1Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- zinc
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:d2d7767d74b7d85ac9c7
- Deposit or zone
- Sulphide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- inferred
- Tonnes
- 3050000
- Grade
- 51.1
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
Evidence · table
“51.1”
Context: 3,050,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
inferredPulacayo-Paca · leadTonnes: 3050000Grade: 43.7Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- lead
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:d2d7767d74b7d85ac9c7
- Deposit or zone
- Sulphide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- inferred
- Tonnes
- 3050000
- Grade
- 43.7
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
Evidence · table
“43.7”
Context: 3,050,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
indicatedPulacayo-Paca · silverTonnes: 21690000Grade: 37Grade Unit: mozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- silver
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:a29e855b21e22ceb0bb3
- Deposit or zone
- Oxide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- indicated
- Tonnes
- 21690000
- Grade
- 37
- Grade Unit
- moz
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
- Does not reflect recent oxide mining
Evidence · table
“37.0”
Context: 21,690,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
indicatedPulacayo-Paca · zincTonnes: 21690000Grade: 485.8Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- zinc
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:a29e855b21e22ceb0bb3
- Deposit or zone
- Oxide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- indicated
- Tonnes
- 21690000
- Grade
- 485.8
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
- Does not reflect recent oxide mining
Evidence · table
“485.8”
Context: 21,690,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
indicatedPulacayo-Paca · leadTonnes: 21690000Grade: 304.2Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- lead
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:a29e855b21e22ceb0bb3
- Deposit or zone
- Oxide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- indicated
- Tonnes
- 21690000
- Grade
- 304.2
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
- Does not reflect recent oxide mining
Evidence · table
“304.2”
Context: 21,690,000
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
inferredPulacayo-Paca · silverTonnes: 3395000Grade: 6Grade Unit: mozHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- silver
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:8122722acbbfd429d99b
- Deposit or zone
- Oxide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- inferred
- Tonnes
- 3395000
- Grade
- 6
- Grade Unit
- moz
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
Evidence · table
“6.0”
Context: 3,395,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
inferredPulacayo-Paca · zincTonnes: 3395000Grade: 51.1Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- zinc
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:8122722acbbfd429d99b
- Deposit or zone
- Oxide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- inferred
- Tonnes
- 3395000
- Grade
- 51.1
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
Evidence · table
“51.1”
Context: 3,395,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
inferredPulacayo-Paca · leadTonnes: 3395000Grade: 43.7Grade Unit: mlbsHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Pulacayo-Paca
- Commodity
- lead
- Region
- bolivia
- Reported Region
- Bolivia
- Ticker
- ELEF
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- Resource group id
- resource:8122722acbbfd429d99b
- Deposit or zone
- Oxide in-pit
- Mining method
- combined
- Material type
- oxide
Resource Data
- Category
- inferred
- Tonnes
- 3395000
- Grade
- 43.7
- Grade Unit
- mlbs
- Cutoff Grade
- 100
- Cutoff Unit
- g/t AgEq
Prior Estimate
- Resource Date
- 2020-10-13
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2020-10-13T00:00:00.000Z
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Restatement of 2020 resource data. (Expanded from multi-commodity resource table for completeness.)
Negative factors
- Historical data (2020)
Evidence · table
“43.7”
Context: 3,395,000
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 6.1 years before this release
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.