SGA: Partially Underwritten Entitlement Offer

Original announcement by asx on

Company
Sarytogan Graphite Limited
Ticker
SGA
Exchange
ASX
Region
Karaganda region of Central Kazakhstan
Primary commodity
Graphite
Secondary commodities
None reported
Document categories
Capital raise, Resource update
Extracted
2026-11-08 23:12:29 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Sarytogan Graphite Limited has announced a partially underwritten pro-rata non-renounceable entitlement offer to raise up to approximately A$3.85 million. The funds will be used for post-Upstream DFS activities at the Sarytogan Graphite Project, downstream battery testing, product qualification, and copper exploration. The offer is priced at A$0.058 per share, representing a discount to the last closing price and 10-day VWAP, and is conditional on obtaining a Kazakh Issue Permit. The document also provides an update on the company's historical Mineral Resource Estimates and Ore Reserves for the Sarytogan Graphite Project.

Reasoning: Sarytogan Graphite Limited is undertaking a partially underwritten entitlement offer to raise capital for its Sarytogan Graphite Project development and copper exploration, which will result in shareholder dilution but provides funding for key activities.

Positive factors

  • Funds raised will support key project development stages including DFS activities, battery testing, product qualification, and copper exploration.
  • The offer is partially underwritten, providing certainty for a portion of the funds.
  • A substantial shareholder has committed to taking up their full entitlement.

Negative factors

  • The entitlement offer will result in dilution for existing shareholders.
  • The offer price represents a discount to both the last closing price and the 10-day volume weighted average price.
  • The issue of securities is conditional on obtaining a Kazakh Issue Permit.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 21

Atlas analysis — Sarytogan Graphite Limited: SGA: Partially Underwritten Entitlement Offer. measured 5400000 tonnes; indicated 21400000 tonnes; inferred 29700000 tonnes

Extracted facts

Stored fact records: 20. Some facts used in scoring do not have a stored record.

Resource Estimates (20)

measuredSarytogan Graphite Deposit · graphiteTonnes: 5400000Grade: 28.3Grade Unit: % TGCContained Metal: 1500000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:3d14853fa98849ff353e
Deposit or zone
Central

Resource Data

Category
measured
Tonnes
5400000
Grade
28.3
Grade Unit
% TGC
Contained Metal
1500000
Contained Unit
t
Cutoff Grade
17
Cutoff Unit
% TGC

Prior Estimate

Resource Date
2026-02-16

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-02-16T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The Central zone Measured resource is a high-confidence, JORC compliant estimate, but it is a restatement from a prior announcement and lacks explicit QP/CP disclosure in this document.

Positive factors

  • High confidence Measured category resource.
  • JORC compliant reporting standard.

Negative factors

  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.

Evidence · table

“5.4”

Context: 17 Measured

Tags used in scoring

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedSarytogan Graphite Deposit · graphiteTonnes: 21400000Grade: 28.8Grade Unit: % TGCContained Metal: 6200000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:291bc90685f79b5918f1
Deposit or zone
Central

Resource Data

Category
indicated
Tonnes
21400000
Grade
28.8
Grade Unit
% TGC
Contained Metal
6200000
Contained Unit
t
Cutoff Grade
17
Cutoff Unit
% TGC

Prior Estimate

Resource Date
2026-02-16

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-02-16T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The Central zone Indicated resource provides reasonable geological confidence and is JORC compliant, but it is a restatement from a prior announcement and lacks explicit QP/CP disclosure in this document.

Positive factors

  • Indicated category resource provides reasonable geological confidence.
  • JORC compliant reporting standard.

Negative factors

  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.

Evidence · table

“21.4”

Context: 17 Indicated

Tags used in scoring

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredSarytogan Graphite Deposit · graphiteTonnes: 29700000Grade: 28.9Grade Unit: % TGCContained Metal: 8600000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:a7c47652bbddea90a165
Deposit or zone
Central

Resource Data

Category
inferred
Tonnes
29700000
Grade
28.9
Grade Unit
% TGC
Contained Metal
8600000
Contained Unit
t
Cutoff Grade
17
Cutoff Unit
% TGC

Prior Estimate

Resource Date
2026-02-16

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-02-16T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The Central zone Inferred resource is JORC compliant, but its Inferred classification indicates lower geological confidence, and it is a restatement from a prior announcement lacking explicit QP/CP disclosure in this document.

Positive factors

  • JORC compliant reporting standard.

Negative factors

  • Inferred category indicates lower geological confidence.
  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.

Evidence · table

“29.7”

Context: 17 Inferred

Tags used in scoring

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedSarytogan Graphite Deposit · graphiteTonnes: 56600000Grade: 28.8Grade Unit: % TGCContained Metal: 16300000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:2538a2c8ed99a9b29521
Deposit or zone
Central

Resource Data

Category
indicated
Tonnes
56600000
Grade
28.8
Grade Unit
% TGC
Contained Metal
16300000
Contained Unit
t
Cutoff Grade
17
Cutoff Unit
% TGC

Prior Estimate

Resource Date
2026-02-16

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-02-16T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The Central zone sub-total resource is JORC compliant, but as a combined category, it is treated as Indicated for confidence, and it is a restatement from a prior announcement lacking explicit QP/CP disclosure in this document.

Positive factors

  • JORC compliant reporting standard.

Negative factors

  • This is a sub-total combining Measured, Indicated, and Inferred, so it is treated as Indicated for confidence.
  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.

Evidence · table

“56.6”

Context: 17 Sub Total

Tags used in scoring

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedSarytogan Graphite Deposit · graphiteTonnes: 87000000Grade: 29.1Grade Unit: % TGCContained Metal: 25000000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:fac6049d7d2208a9f757
Deposit or zone
North

Resource Data

Category
indicated
Tonnes
87000000
Grade
29.1
Grade Unit
% TGC
Contained Metal
25000000
Contained Unit
t
Cutoff Grade
15
Cutoff Unit
% TGC

Prior Estimate

Resource Date
2023-03-27

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-03-27T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The North zone Indicated resource is JORC compliant and provides reasonable geological confidence, but it is a restatement from a prior announcement, is over 2 years old, and lacks explicit QP/CP disclosure in this document.

Positive factors

  • Indicated category resource provides reasonable geological confidence.
  • JORC compliant reporting standard.

Negative factors

  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.
  • Estimate is over 2 years old, raising data currency concerns.

Evidence · table

“87”

Context: 15 Indicated

Tags used in scoring

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredSarytogan Graphite Deposit · graphiteTonnes: 81000000Grade: 29.6Grade Unit: % TGCContained Metal: 24000000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:be53326f726796dbe692
Deposit or zone
North

Resource Data

Category
inferred
Tonnes
81000000
Grade
29.6
Grade Unit
% TGC
Contained Metal
24000000
Contained Unit
t
Cutoff Grade
15
Cutoff Unit
% TGC

Prior Estimate

Resource Date
2023-03-27

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-03-27T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The North zone Inferred resource is JORC compliant, but its Inferred classification indicates lower geological confidence, it is a restatement from a prior announcement, is over 2 years old, and lacks explicit QP/CP disclosure in this document.

Positive factors

  • JORC compliant reporting standard.

Negative factors

  • Inferred category indicates lower geological confidence.
  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.
  • Estimate is over 2 years old, raising data currency concerns.

Evidence · table

“81”

Context: 15 Inferred

Tags used in scoring

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredSarytogan Graphite Deposit · graphiteTonnes: 168000000Grade: 29.3Grade Unit: % TGCContained Metal: 49000000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:d56909d7415e2b0f63ab
Deposit or zone
North

Resource Data

Category
inferred
Tonnes
168000000
Grade
29.3
Grade Unit
% TGC
Contained Metal
49000000
Contained Unit
t
Cutoff Grade
15
Cutoff Unit
% TGC

Prior Estimate

Resource Date
2023-03-27

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-03-27T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The North zone sub-total resource is JORC compliant, but as a combined category, it is treated as Inferred for confidence, it is a restatement from a prior announcement, is over 2 years old, and lacks explicit QP/CP disclosure in this document.

Positive factors

  • JORC compliant reporting standard.

Negative factors

  • This is a sub-total combining Indicated and Inferred, so it is treated as Inferred for confidence.
  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.
  • Estimate is over 2 years old, raising data currency concerns.

Evidence · table

“168”

Context: 15 Sub Total

Tags used in scoring

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredSarytogan Graphite Deposit · graphiteTonnes: 5400000Grade: 28.3Grade Unit: % TGCContained Metal: 1500000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:f71a7bf845acfd5bb9db
Deposit or zone
Grand Total

Resource Data

Category
measured
Tonnes
5400000
Grade
28.3
Grade Unit
% TGC
Contained Metal
1500000
Contained Unit
t
Cutoff Grade
15
Cutoff Unit
% TGC

Prior Estimate

Resource Date
2026-02-16

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-02-16T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The Grand Total Measured resource is a high-confidence, JORC compliant estimate, but it is a restatement from a prior announcement and lacks explicit QP/CP disclosure in this document.

Positive factors

  • High confidence Measured category resource.
  • JORC compliant reporting standard.

Negative factors

  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.

Evidence · table

“5.4”

Context: 15-17 Measured

Tags used in scoring

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedSarytogan Graphite Deposit · graphiteTonnes: 108000000Grade: 29Grade Unit: % TGCContained Metal: 31000000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:676e0434c6457ff38670
Deposit or zone
Grand Total

Resource Data

Category
indicated
Tonnes
108000000
Grade
29
Grade Unit
% TGC
Contained Metal
31000000
Contained Unit
t
Cutoff Grade
15
Cutoff Unit
% TGC

Prior Estimate

Resource Date
2026-02-16

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-02-16T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The Grand Total Indicated resource is JORC compliant and provides reasonable geological confidence, but it is a restatement from a prior announcement and lacks explicit QP/CP disclosure in this document.

Positive factors

  • Indicated category resource provides reasonable geological confidence.
  • JORC compliant reporting standard.

Negative factors

  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.

Evidence · table

“108”

Context: 15-17 Indicated

Tags used in scoring

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredSarytogan Graphite Deposit · graphiteTonnes: 111000000Grade: 29.4Grade Unit: % TGCContained Metal: 33000000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:51eec31377a5f198b59c
Deposit or zone
Grand Total

Resource Data

Category
inferred
Tonnes
111000000
Grade
29.4
Grade Unit
% TGC
Contained Metal
33000000
Contained Unit
t
Cutoff Grade
15
Cutoff Unit
% TGC

Prior Estimate

Resource Date
2026-02-16

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-02-16T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The Grand Total Inferred resource is JORC compliant, but its Inferred classification indicates lower geological confidence, and it is a restatement from a prior announcement lacking explicit QP/CP disclosure in this document.

Positive factors

  • JORC compliant reporting standard.

Negative factors

  • Inferred category indicates lower geological confidence.
  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.

Evidence · table

“111”

Context: 15-17 Inferred

Tags used in scoring

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedSarytogan Graphite Deposit · graphiteTonnes: 225000000Grade: 29.2Grade Unit: % TGCContained Metal: 66000000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
resource
Reporting standards
jorc
Resource group id
resource:3120284c3a2a7e42b931
Deposit or zone
Grand Total

Resource Data

Category
indicated
Tonnes
225000000
Grade
29.2
Grade Unit
% TGC
Contained Metal
66000000
Contained Unit
t
Cutoff Grade
15
Cutoff Unit
% TGC

Prior Estimate

Resource Date
2026-02-16

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-02-16T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The Grand Total resource is JORC compliant, but as a combined category, it is treated as Indicated for confidence, and it is a restatement from a prior announcement lacking explicit QP/CP disclosure in this document.

Positive factors

  • JORC compliant reporting standard.

Negative factors

  • This is a total combining Measured, Indicated, and Inferred, so it is treated as Indicated for confidence.
  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.

Evidence · table

“225”

Context: 15-17 Total

Tags used in scoring

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

provenSarytogan Graphite Deposit · graphiteTonnes: 2546000Grade: 28.6Grade Unit: %Contained Metal: 587000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
reserve
Reporting standards
jorc
Resource group id
resource:58bcf092b77fd5feef16

Resource Data

Category
proven
Tonnes
2546000
Grade
28.6
Grade Unit
%
Contained Metal
587000
Contained Unit
t

Prior Estimate

Resource Date
2026-10-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-10-21T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The Proven Ore Reserve is a high-confidence, JORC compliant estimate with a high concentrate grade, but it is a restatement from a prior announcement and lacks explicit QP/CP disclosure in this document.

Positive factors

  • Proven Reserve indicates high economic viability and confidence.
  • JORC compliant reporting standard.
  • High concentrate grade of 89.7% TGC.

Negative factors

  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.

Evidence · table

“2,546”

Context: Total Proved

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableSarytogan Graphite Deposit · graphiteTonnes: 11961000Grade: 29.2Grade Unit: %Contained Metal: 2840000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
reserve
Reporting standards
jorc
Resource group id
resource:570f29dda4e4d7873c0b

Resource Data

Category
probable
Tonnes
11961000
Grade
29.2
Grade Unit
%
Contained Metal
2840000
Contained Unit
t

Prior Estimate

Resource Date
2026-10-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-10-21T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The Probable Ore Reserve is a JORC compliant estimate with demonstrated economic viability and a high concentrate grade, but it is a restatement from a prior announcement and lacks explicit QP/CP disclosure in this document.

Positive factors

  • Probable Reserve indicates demonstrated economic viability.
  • JORC compliant reporting standard.
  • High concentrate grade of 89.8% TGC.

Negative factors

  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.

Evidence · table

“11,961”

Context: Total Probable

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableSarytogan Graphite Deposit · graphiteTonnes: 2362000Grade: 26.5Grade Unit: %Contained Metal: 411000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
reserve
Reporting standards
jorc
Resource group id
resource:77fa7e28b4e7b6525902
Material type
Weathered

Resource Data

Category
probable
Tonnes
2362000
Grade
26.5
Grade Unit
%
Contained Metal
411000
Contained Unit
t

Prior Estimate

Resource Date
2026-10-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-10-21T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The Weathered material Probable Ore Reserve is JORC compliant with a good concentrate grade, but it is a restatement from a prior announcement and lacks explicit QP/CP disclosure in this document.

Positive factors

  • JORC compliant reporting standard.
  • High concentrate grade of 88.0% TGC.

Negative factors

  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.

Evidence · table

“2,362”

Context: Total Weathered

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableSarytogan Graphite Deposit · graphiteTonnes: 12145000Grade: 29.6Grade Unit: %Contained Metal: 3016000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
reserve
Reporting standards
jorc
Resource group id
resource:d1c9c113c24f4b3b2dbe
Material type
fresh

Resource Data

Category
probable
Tonnes
12145000
Grade
29.6
Grade Unit
%
Contained Metal
3016000
Contained Unit
t

Prior Estimate

Resource Date
2026-10-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-10-21T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The Fresh/Trans material Probable Ore Reserve is JORC compliant with a high concentrate grade, but it is a restatement from a prior announcement and lacks explicit QP/CP disclosure in this document.

Positive factors

  • JORC compliant reporting standard.
  • High concentrate grade of 90.0% TGC.

Negative factors

  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.

Evidence · table

“12,145”

Context: Total Fresh/Trans

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableSarytogan Graphite Deposit · graphiteTonnes: 10514000Grade: 29.3Grade Unit: %Contained Metal: 2496000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
reserve
Reporting standards
jorc
Resource group id
resource:c791f89ddeea2dad42a7
Deposit or zone
Central

Resource Data

Category
probable
Tonnes
10514000
Grade
29.3
Grade Unit
%
Contained Metal
2496000
Contained Unit
t

Prior Estimate

Resource Date
2026-10-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-10-21T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The Central zone Probable Ore Reserve is JORC compliant with a high concentrate grade, but it is a restatement from a prior announcement and lacks explicit QP/CP disclosure in this document.

Positive factors

  • JORC compliant reporting standard.
  • High concentrate grade of 89.8% TGC.

Negative factors

  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.

Evidence · table

“10,514”

Context: Total Central

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableSarytogan Graphite Deposit · graphiteTonnes: 3993000Grade: 28.5Grade Unit: %Contained Metal: 930000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
reserve
Reporting standards
jorc
Resource group id
resource:835fe9f109151b2f871e
Deposit or zone
North

Resource Data

Category
probable
Tonnes
3993000
Grade
28.5
Grade Unit
%
Contained Metal
930000
Contained Unit
t

Prior Estimate

Resource Date
2026-10-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-10-21T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The North zone Probable Ore Reserve is JORC compliant with a high concentrate grade, but it is a restatement from a prior announcement and lacks explicit QP/CP disclosure in this document.

Positive factors

  • JORC compliant reporting standard.
  • High concentrate grade of 89.8% TGC.

Negative factors

  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.

Evidence · table

“3,993”

Context: Total North

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableSarytogan Graphite Deposit · graphiteTonnes: 8864000Grade: 31.8Grade Unit: %Contained Metal: 2324000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
reserve
Reporting standards
jorc
Resource group id
resource:5ade6551730a8cac17fa
Material type
High Grade

Resource Data

Category
probable
Tonnes
8864000
Grade
31.8
Grade Unit
%
Contained Metal
2324000
Contained Unit
t

Prior Estimate

Resource Date
2026-10-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-10-21T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The High Grade Probable Ore Reserve is JORC compliant with a very high ore grade and concentrate grade, but it is a restatement from a prior announcement and lacks explicit QP/CP disclosure in this document.

Positive factors

  • High grade ore reserve with 31.8% TGC.
  • JORC compliant reporting standard.
  • High concentrate grade of 89.9% TGC.

Negative factors

  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.

Evidence · table

“8,864”

Context: Total High Grade

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableSarytogan Graphite Deposit · graphiteTonnes: 5643000Grade: 24.8Grade Unit: %Contained Metal: 1102000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
reserve
Reporting standards
jorc
Resource group id
resource:da1d9a72ee7e6d2490a3
Material type
Low Grade

Resource Data

Category
probable
Tonnes
5643000
Grade
24.8
Grade Unit
%
Contained Metal
1102000
Contained Unit
t

Prior Estimate

Resource Date
2026-10-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-10-21T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The Low Grade Probable Ore Reserve is JORC compliant with a good concentrate grade, but its lower ore grade and status as a restatement from a prior announcement lacking explicit QP/CP disclosure in this document temper its impact.

Positive factors

  • JORC compliant reporting standard.
  • High concentrate grade of 89.6% TGC.

Negative factors

  • Lower ore grade compared to other categories.
  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.

Evidence · table

“5,643”

Context: Total Low Grade

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableSarytogan Graphite Deposit · graphiteTonnes: 14507000Grade: 29.1Grade Unit: %Contained Metal: 3426000Contained Unit: tHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Sarytogan Graphite Deposit
Commodity
graphite
Region
kazakhstan
Reported Region
Karaganda region of Central Kazakhstan
Ticker
SGA

Resource scope

Estimate type
reserve
Reporting standards
jorc
Resource group id
resource:5a334b900bce4eb55105

Resource Data

Category
probable
Tonnes
14507000
Grade
29.1
Grade Unit
%
Contained Metal
3426000
Contained Unit
t

Prior Estimate

Resource Date
2026-10-21

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-10-21T00:00:00.000Z

Dates

Event date
2026-11-08T00:00:00.000Z

Reasoning: The Grand Total Probable Ore Reserve is a JORC compliant estimate with demonstrated economic viability and a high concentrate grade, but it is a restatement from a prior announcement and lacks explicit QP/CP disclosure in this document.

Positive factors

  • Probable Reserve indicates demonstrated economic viability.
  • JORC compliant reporting standard.
  • High concentrate grade of 89.8% TGC.

Negative factors

  • No QP/CP disclosure in this document.
  • This is a restatement of a prior estimate, not new information.

Evidence · table

“14,507”

Context: Grand Total

Tags used in scoring

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.