# SGA: IMARC Conference Presentation

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/sga-imarc-conference-presentation--0ab0dacc-37d0-4aa2-9c89-87194ce31157

Original source: https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03156758

Publisher: asx

Original announcement: 2026-10-25T21:27:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-10-25T22:30:51.636Z

Atlas analysis updated: 2026-10-25T22:30:51.636Z

- Company: Sarytogan Graphite Limited

- Ticker: SGA

- Exchange: ASX

- Region: Kazakhstan

- Primary commodity: Unavailable

- Secondary commodities: None reported

- Document categories: Resource update, Other

- Extracted: 2026-10-25 22:23:53 UTC

Narrative sentiment: 0.80 · Bullish

## Minestarters Atlas summary

Sarytogan Graphite has announced a Mineral Resource of 225 Mt @ 29.2% TGC and an Ore Reserve of 14.5 Mt @ 29.1% TGC. The company also presented results from its upstream DFS, highlighting a 19.8% IRR and US$151M NPV for its 50 ktpa capacity project.

Reasoning: The presentation announces a significant Ore Reserve and provides updated DFS economic results, representing a major de-risking milestone for the project.

- Positive factor: Significant Ore Reserve announcement \(14.5 Mt @ 29.1% TGC\)

- Positive factor: High-grade reserve component \(8.9 Mt @ 31.8% TGC\)

- Positive factor: Large scale resource \(225 Mt\)

- Positive factor: Strong economic indicators from DFS \(19.8% IRR, US$151M NPV\)

- Positive factor: Strategic project status in EU

Facts used in scoring: 6

## Classification and evidence

**Ore Reserve**

Polarity: positive

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The document reports a 14.5 Mt Ore Reserve at 29.1% TGC.

Evidence · text

> Ore Reserve of 14.5 Mt @ 29.1% TGC

**Maiden Resource**

Polarity: neutral

Definition: First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: The presentation describes the project as the world's largest undeveloped graphite project, implying a significant new baseline.

Evidence · text

> The world’s largest, highest-grade, and lowest-cost undeveloped graphite project outside China.

## Extracted facts

Stored fact records: 6. Some facts used in scoring do not have a stored record.

## Resource Estimates (6)

### measured

[Link to this fact](https://atlas-aws.minestarters.com/news/sga-imarc-conference-presentation--0ab0dacc-37d0-4aa2-9c89-87194ce31157#fact-resource-facts-0)

Sarytogan Graphite Deposit · graphite

#### Identity

- Project: Sarytogan Graphite Deposit
- Commodity: graphite
- Region: kazakhstan
- Reported Region: Kazakhstan
- Ticker: SGA

#### Resource scope

- Estimate type: resource
- Resource group id: resource:fedb16397e753ec05b89

#### Resource Data

- Category: measured
- Tonnes: 5400000
- Grade: 29.2
- Grade Unit: % TGC

#### Prior Estimate

- Resource Date: 2026-02-16

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: Measured resource component of the total resource.

Evidence · text

> 5.4Mt of Measured Classification

#### Tags used in scoring

**Measured Resource**

Polarity: positive

Definition: Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/sga-imarc-conference-presentation--0ab0dacc-37d0-4aa2-9c89-87194ce31157#fact-resource-facts-1)

Sarytogan Graphite Deposit · graphite

#### Identity

- Project: Sarytogan Graphite Deposit
- Commodity: graphite
- Region: kazakhstan
- Reported Region: Kazakhstan
- Ticker: SGA

#### Resource scope

- Estimate type: resource
- Resource group id: resource:7adeed9d79ed2ae49940

#### Resource Data

- Category: indicated
- Tonnes: 219600000
- Grade: 29.2
- Grade Unit: % TGC

#### Prior Estimate

- Resource Date: 2026-02-16

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: Indicated portion of the total resource \(225Mt - 5.4Mt measured\).

Evidence · text

> Mineral Resource 225 Mt @ 29.2%TGC

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/sga-imarc-conference-presentation--0ab0dacc-37d0-4aa2-9c89-87194ce31157#fact-resource-facts-2)

Sarytogan Graphite Deposit · graphite

#### Identity

- Project: Sarytogan Graphite Deposit
- Commodity: graphite
- Region: kazakhstan
- Reported Region: Kazakhstan
- Ticker: SGA

#### Resource scope

- Estimate type: resource
- Resource group id: resource:db4177a8eab73c76fe19

#### Resource Data

- Category: inferred
- Tonnes: 0
- Grade: 0

#### Prior Estimate

- Resource Date: 2026-02-16

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: Inferred component not explicitly broken out in prose, inferred from total.

Evidence · text

> Mineral Resource 225 Mt @ 29.2%TGC

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### proven

[Link to this fact](https://atlas-aws.minestarters.com/news/sga-imarc-conference-presentation--0ab0dacc-37d0-4aa2-9c89-87194ce31157#fact-resource-facts-3)

Sarytogan Graphite Deposit · graphite

#### Identity

- Project: Sarytogan Graphite Deposit
- Commodity: graphite
- Region: kazakhstan
- Reported Region: Kazakhstan
- Ticker: SGA

#### Resource scope

- Estimate type: reserve
- Resource group id: resource:570ad52b681f27174e40

#### Resource Data

- Category: proven
- Tonnes: 2500000
- Grade: 29.1
- Grade Unit: % TGC

#### Prior Estimate

- Resource Date: 2026-10-21

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: Proved reserve component of the total reserve.

Evidence · text

> 2.5Mt of Proved Classification

#### Tags used in scoring

**Proven Reserve**

Polarity: positive

Definition: Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/sga-imarc-conference-presentation--0ab0dacc-37d0-4aa2-9c89-87194ce31157#fact-resource-facts-4)

Sarytogan Graphite Deposit · graphite

#### Identity

- Project: Sarytogan Graphite Deposit
- Commodity: graphite
- Region: kazakhstan
- Reported Region: Kazakhstan
- Ticker: SGA

#### Resource scope

- Estimate type: reserve
- Resource group id: resource:7db8b50493af36cdd7ef

#### Resource Data

- Category: probable
- Tonnes: 12000000
- Grade: 29.1
- Grade Unit: % TGC

#### Prior Estimate

- Resource Date: 2026-10-21

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: Probable reserve component of the total reserve.

Evidence · text

> Ore Reserve of 14.5 Mt @ 29.1% TGC

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/sga-imarc-conference-presentation--0ab0dacc-37d0-4aa2-9c89-87194ce31157#fact-resource-facts-5)

Sarytogan Graphite Deposit · graphite

#### Identity

- Project: Sarytogan Graphite Deposit
- Commodity: graphite
- Region: kazakhstan
- Reported Region: Kazakhstan
- Ticker: SGA

#### Resource scope

- Estimate type: reserve
- Resource group id: resource:3e161bab91b4c8e72623

#### Resource Data

- Category: probable
- Tonnes: 8900000
- Grade: 31.8
- Grade Unit: % TGC

#### Prior Estimate

- Resource Date: 2026-10-21

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-25T00:00:00.000Z

Reasoning: High-grade portion of the ore reserve.

- Positive factor: High-grade reserve component

Evidence · text

> including high-grade of 8.9Mt @ 31.8% TGC

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
