# RXL: Precious Metals Zurich Presentation

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/rxl-precious-metals-zurich-presentation--8f967a0f-588a-41a5-8328-c2614c5980e6

Original source: https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03163850

Publisher: asx

Original announcement: 2026-11-09T21:23:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-11-09T22:31:01.891Z

Atlas analysis updated: 2026-11-09T22:31:01.891Z

- Company: Rox Resources

- Ticker: RXL

- Exchange: ASX

- Region: Western Australia

- Primary commodity: Unavailable

- Secondary commodities: None reported

- Document categories: Other, Resource update

- Extracted: 2026-11-09 22:20:05 UTC

Narrative sentiment: 0.60 · Bullish

## Minestarters Atlas summary

Rox Resources presented an update on the Youanmi Gold Project at the Precious Metals Summit Zurich, highlighting that the project is fully funded and construction is underway. The company aims to grow production towards 150kozpa by leveraging latent mill capacity and ongoing exploration.

Reasoning: The document is a corporate presentation for an investor summit, summarizing the de-risked status and growth potential of the Youanmi Gold Project following FID and financial close.

- Positive factor: Project is fully funded and construction has commenced

- Positive factor: Strong DFS economics with high NPV and IRR

- Positive factor: High-grade ore reserves and resources reported

- Positive factor: Clear pathway to first gold production in mid-2027

- Negative factor: Aspiration to 150kozpa is a strategic objective and not a guaranteed production target

Facts used in scoring: 2

## Classification and evidence

**QP/CP Signed**

Polarity: positive

Story-specific tag

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: Mr Steve Le Brun is named as the Competent Person for the Mineral Resource statement.

Evidence · text

> consent of the Competent Person Mr Steve Le Brun was obtained

**JORC Compliant**

Polarity: positive

Story-specific tag

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: Mineral Resource and Ore Reserve statements are reported in accordance with the JORC Code \(2012 edition\).

Evidence · text

> in accordance with ASX Listing Rule 5.8 and the JORC Code \(2012 edition\)

## Extracted facts

Stored fact records: 1. Some facts used in scoring do not have a stored record.

## Resource Estimates (1)

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/rxl-precious-metals-zurich-presentation--8f967a0f-588a-41a5-8328-c2614c5980e6#fact-resource-facts-1)

Youanmi Gold Project · gold

#### Identity

- Project: Youanmi Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: RXL

#### Resource scope

- Estimate type: resource
- Effective date: 2026-09-09T00:00:00.000Z
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Steve Le Brun
- Resource group id: resource:1ca40b0627a87e4748ee
- Mining method: combined

#### Resource Data

- Category: indicated
- Tonnes: 12400000
- Grade: 5.5
- Grade Unit: g/t
- Contained Metal: 2195
- Contained Unit: koz

#### Prior Estimate

- Resource Date: 2026-09-09

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-09T00:00:00.000Z

Reasoning: Mineral Resource of 12.4 Mt @ 5.5 g/t Au for 2,195 koz.

- Positive factor: Significant mineral resource scale

Evidence · text

> Mineral Resource of 12.4 Mt @ 5.5 g/t Au for 2,195 koz

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**Resource Update**

Polarity: neutral

Definition: Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
