RXL: Precious Metals Zurich Presentation
Original announcement by asx on
- Company
- Rox Resources
- Ticker
- RXL
- Exchange
- ASX
- Region
- Western Australia
- Primary commodity
- Unavailable
- Secondary commodities
- None reported
- Document categories
- Other, Resource update
- Extracted
- 2026-11-09 22:20:05 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Rox Resources presented an update on the Youanmi Gold Project at the Precious Metals Summit Zurich, highlighting that the project is fully funded and construction is underway. The company aims to grow production towards 150kozpa by leveraging latent mill capacity and ongoing exploration.
Reasoning: The document is a corporate presentation for an investor summit, summarizing the de-risked status and growth potential of the Youanmi Gold Project following FID and financial close.
Positive factors
- Project is fully funded and construction has commenced
- Strong DFS economics with high NPV and IRR
- High-grade ore reserves and resources reported
- Clear pathway to first gold production in mid-2027
Negative factors
- Aspiration to 150kozpa is a strategic objective and not a guaranteed production target
Facts used in scoring: 2

Classification and evidence
QP/CP Signedpositive · Story-specific tag
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Mr Steve Le Brun is named as the Competent Person for the Mineral Resource statement.
Evidence · text
“consent of the Competent Person Mr Steve Le Brun was obtained”
JORC Compliantpositive · Story-specific tag
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: Mineral Resource and Ore Reserve statements are reported in accordance with the JORC Code (2012 edition).
Evidence · text
“in accordance with ASX Listing Rule 5.8 and the JORC Code (2012 edition)”
Extracted facts
Stored fact records: 1. Some facts used in scoring do not have a stored record.
Resource Estimates (1)
indicatedYouanmi Gold Project · goldTonnes: 12400000Grade: 5.5Grade Unit: g/tContained Metal: 2195Contained Unit: kozView all detailsHide details
Identity
- Project
- Youanmi Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- RXL
Resource scope
- Estimate type
- resource
- Effective date
- 2026-09-09T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Steve Le Brun
- Resource group id
- resource:1ca40b0627a87e4748ee
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 12400000
- Grade
- 5.5
- Grade Unit
- g/t
- Contained Metal
- 2195
- Contained Unit
- koz
Prior Estimate
- Resource Date
- 2026-09-09
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-09T00:00:00.000Z
Reasoning: Mineral Resource of 12.4 Mt @ 5.5 g/t Au for 2,195 koz.
Positive factors
- Significant mineral resource scale
Evidence · text
“Mineral Resource of 12.4 Mt @ 5.5 g/t Au for 2,195 koz”
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.