# RAU: MD&amp;A 30 September 2026

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/rau-md-a-30-september-2026--c74dc073-9b4d-4c28-8aa3-e82b68a4f7c1

Original source: https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03163291

Publisher: asx

Original announcement: 2026-11-08T21:17:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-11-08T22:46:41.855Z

Atlas analysis updated: 2026-11-08T22:46:41.855Z

- Company: Resouro Strategic Metals Inc.

- Ticker: RAU

- Exchange: ASX

- Region: Minas Gerais, Brazil

- Primary commodity: Unavailable

- Secondary commodities: None reported

- Document categories: Other, Resource update, Capital raise, Metallurgy

- Extracted: 2026-11-08 22:33:54 UTC

Narrative sentiment: 0.60 · Bullish

## Minestarters Atlas summary

Resouro Strategic Metals Inc. reported strong Preliminary Economic Assessment \(PEA\) results for its Tiros Titanium Dioxide and Rare Earth Elements Project, indicating a post-tax NPV of US$714.9 million and an IRR of 44.2% over a 20-year mine life. This PEA is supported by a 2026 Mineral Resource Estimate for Tiros, which includes 1.4 billion tonnes in Measured and Indicated categories. The company also closed a C$2.5 million private placement to fund working capital and advance the Tiros project towards a Pre-Feasibility Study, despite a material uncertainty regarding its going concern status.

Reasoning: Resouro Strategic Metals Inc. reported strong Preliminary Economic Assessment \(PEA\) results for its Tiros Titanium Dioxide and Rare Earth Elements Project, demonstrating robust project economics and a substantial resource base. This is supported by a recently updated NI 43-101 compliant Mineral Resource Estimate. A recent capital raise provides funding for ongoing work, but the PEA is an early-stage study, further metallurgical work is required, and the company's going concern status introduces financial uncertainty.

- Positive factor: Strong PEA economics \(high NPV, IRR, low payback period\)

- Positive factor: Large Measured and Indicated resource base for Tiros Project

- Positive factor: Potential for diversified dual-revenue stream \(TiO2 and REE\)

- Positive factor: Conventional open-pit mining method proposed for Tiros Project

- Positive factor: Recent capital raise provides funding for project advancement

- Positive factor: Project located in a favorable mining jurisdiction with established infrastructure

- Negative factor: PEA is a preliminary study and subject to refinement in future studies

- Negative factor: Metallurgical test work for final product recovery from leach liquor is not yet completed for REE and fine TiO2

- Negative factor: Project economics are sensitive to variations in sale prices of REE and TiO2

- Negative factor: Funding for full project development \(engineering, construction, commissioning\) is not yet secured

- Negative factor: Company has a material uncertainty regarding its ability to continue as a going concern

Facts used in scoring: 20

## Classification and evidence

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: The document details the results of a Preliminary Economic Assessment \(PEA\) for the Tiros Project, including NPV, IRR, and mine life.

Evidence · text

> Tiros Project – Preliminary Economic Assessment

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: The PEA and MRE are reported under an NI 43-101 Technical Report, which requires sign-off by a Qualified Person.

Evidence · text

> On July 29, 2026 Canada \(July 30, 2026 Australia\), the Company filed the NI 43-101 Technical Report \(“NI 43-101”\) supporting the Preliminary Economic Assessment \(“PEA”\) results for its Tiros Titanium Dioxide and Rare Earth Elements Project in Minas Gerais, Brazil.

**Open Pit Mining**

Polarity: neutral

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The PEA contemplates using an open-pit mining operation for the Tiros Project.

Evidence · text

> Mining operational plans are to use an open-pit mining process with free digging near-surface mineralization;

**Measured Resource**

Polarity: positive

Definition: Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: The Mineral Resource Estimate includes material in the Measured category.

Evidence · text

> The mineral resource estimate contains 1.4 Bt at 4,000 ppm TREO, 1,100 ppm MREO and 12% TiO2 in the Measured and Indicated categories.

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The Mineral Resource Estimate includes material in the Indicated category.

Evidence · text

> The mineral resource estimate contains 1.4 Bt at 4,000 ppm TREO, 1,100 ppm MREO and 12% TiO2 in the Measured and Indicated categories.

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The Mineral Resource Estimate includes material in the Inferred category.

Evidence · text

> The Inferred resource contains 500,000,000 tonnes at 12% TiO2, 3,700 ppm TREO, and 1,000 ppm MREO.

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: The Mineral Resource Estimate was prepared as part of an NI 43-101 Technical Report.

Evidence · text

> Resouro engaged Atticus Geoscience Consulting Ltd. to prepare a mineral resource estimate for the Tiros Deposit \(“2026 MRE”\).

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The cut-off grade for the Mineral Resource Estimate is clearly stated as 1,000 ppm TREO.

Evidence · text

> The 2026 MRE for the Tiros Project considers TiO2, the Total Rare Earth Oxides and the Magnetic Rare Earth Oxides reporting to a cut-off of 1,000 ppm TREO.

**Maiden Resource**

Polarity: neutral

Definition: First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: While the project has prior resources, this is a new 2026 MRE that forms the basis for the PEA, establishing a new baseline.

Evidence · text

> Resouro engaged Atticus Geoscience Consulting Ltd. to prepare a mineral resource estimate for the Tiros Deposit \(“2026 MRE”\).

**Capital Raise**

Polarity: neutral

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The company closed a non-brokered private placement on August 11, 2026.

Evidence · text

> Non-brokered Private Placement Closed August 11, 2026

**Bench Scale Only**

Polarity: negative

Story-specific tag

Definition: Only preliminary bench tests completed — no locked-cycle or pilot work.

Why it applies: Metallurgical test work for REE and fine TiO2 recovery was only carried out up to the leach liquor stage, with further test work required for final product recovery.

Evidence · text

> For this stage of investigation, test work was not yet carried out to recover titanium and rare earth products from the leach liquor. This test work, with the leach liquor, will follow in the next stage of test work \(PFS level investigation\).

**Refractory Ore**

Polarity: negative

Story-specific tag

Definition: Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.

Why it applies: The proposed metallurgical flowsheet for REE and fine TiO2 involves complex steps like acid sulphation, hydrolyzation, and precipitation, indicating challenging mineralogy.

Evidence · text

> Proposed processing flowsheet incorporates grinding and sizing beneficiation, calcination, magnetic separation/electrostatic separation and gravity separation, acid leach, sulphation/water leach, hydrolyzation, precipitation, and solid liquid separation;

**Single Domain Only**

Polarity: negative

Story-specific tag

Definition: Testing limited to one composite or domain — representativeness not established.

Why it applies: Metallurgical test work was carried out on a single composite sample \(BK19\), limiting the understanding of variability across different ore domains.

Evidence · text

> Final test work with these two flowsheets was carried out on a composite sample, BK19, which was characterised with a feed assay of 24.1% TiO2 and 0.94% TREO. This sample was taken from drilling within the planned mining starter pits.

**Going Concern**

Polarity: negative

Story-specific tag

Definition: No canonical definition is currently available.

Why it applies: The financial statements are prepared on a going concern basis, but conditions indicate a material uncertainty that may cast significant doubt on the company’s ability to continue as a going concern.

Evidence · text

> These conditions indicate the existence of a material uncertainty that may cast significant doubt on the Company’s ability to continue as a going concern.

**Mill Route**

Polarity: neutral

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: the document describes a flotation route \("concentrate"\)

**Gravity Route**

Polarity: neutral

Definition: Gravity separation forms a material part of the flowsheet.

Why it applies: the document describes a gravity route \("gravity"\)

**POX/BIOX Route**

Polarity: neutral

Definition: Pressure or bio-oxidation for refractory ore — high CAPEX and OPEX.

Why it applies: the document describes a pox\_biox route \("roasting"\)

## Extracted facts

Stored fact records: 10. Some facts used in scoring do not have a stored record.

## Resource Estimates (6)

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/rau-md-a-30-september-2026--c74dc073-9b4d-4c28-8aa3-e82b68a4f7c1#fact-resource-facts-1)

Tiros Project · rare earth elements

#### Identity

- Project: Tiros Project
- Commodity: rare earth elements
- Region: brazil
- Reported Region: Minas Gerais, Brazil
- Ticker: RAU

#### Resource scope

- Estimate type: resource
- Reporting standards: ni\_43\_101
- QP Signed: Yes
- Resource group id: resource:ee5143b067097e779786
- Deposit or zone: Tiros Deposit

#### Resource Data

- Category: indicated
- Tonnes: 1400000000
- Grade: 4000
- Grade Unit: ppm TREO
- Cutoff Grade: 1000
- Cutoff Unit: ppm TREO

#### Prior Estimate

- Resource Date: 2026-03-15

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-08T00:00:00.000Z

Reasoning: The Tiros Project hosts a very large Measured and Indicated resource with a significant TREO grade, providing a strong foundation for future development and supporting the positive PEA results.

- Positive factor: Large tonnage in Measured and Indicated categories provides high confidence

- Positive factor: High TREO grade for a large-scale resource

- Positive factor: NI 43-101 compliant estimate provides credibility

Evidence · text

> The mineral resource estimate contains 1.4 Bt at 4,000 ppm TREO, 1,100 ppm MREO and 12% TiO2 in the Measured and Indicated categories.

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/rau-md-a-30-september-2026--c74dc073-9b4d-4c28-8aa3-e82b68a4f7c1#fact-resource-facts-2)

Tiros Project · rare earth elements

#### Identity

- Project: Tiros Project
- Commodity: rare earth elements
- Region: brazil
- Reported Region: Minas Gerais, Brazil
- Ticker: RAU

#### Resource scope

- Estimate type: resource
- Reporting standards: ni\_43\_101
- QP Signed: Yes
- Resource group id: resource:ee5143b067097e779786
- Deposit or zone: Tiros Deposit

#### Resource Data

- Category: indicated
- Tonnes: 1400000000
- Grade: 1100
- Grade Unit: ppm MREO
- Cutoff Grade: 1000
- Cutoff Unit: ppm TREO

#### Prior Estimate

- Resource Date: 2026-03-15

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-08T00:00:00.000Z

Reasoning: The Tiros Project's Measured and Indicated resource includes a substantial MREO component, which is critical for the project's economic viability and dual-revenue stream potential.

- Positive factor: Large tonnage in Measured and Indicated categories provides high confidence

- Positive factor: Significant MREO grade within the resource, indicating valuable components

- Positive factor: NI 43-101 compliant estimate provides credibility

Evidence · text

> The mineral resource estimate contains 1.4 Bt at 4,000 ppm TREO, 1,100 ppm MREO and 12% TiO2 in the Measured and Indicated categories.

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/rau-md-a-30-september-2026--c74dc073-9b4d-4c28-8aa3-e82b68a4f7c1#fact-resource-facts-3)

Tiros Project · titanium

#### Identity

- Project: Tiros Project
- Commodity: titanium
- Region: brazil
- Reported Region: Minas Gerais, Brazil
- Ticker: RAU

#### Resource scope

- Estimate type: resource
- Reporting standards: ni\_43\_101
- QP Signed: Yes
- Resource group id: resource:ee5143b067097e779786
- Deposit or zone: Tiros Deposit

#### Resource Data

- Category: indicated
- Tonnes: 1400000000
- Grade: 12
- Grade Unit: % TiO2
- Cutoff Grade: 1000
- Cutoff Unit: ppm TREO

#### Prior Estimate

- Resource Date: 2026-03-15

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-08T00:00:00.000Z

Reasoning: The Tiros Project's Measured and Indicated resource contains a substantial amount of titanium dioxide at a high grade, forming a key part of the project's dual-revenue strategy.

- Positive factor: Large tonnage in Measured and Indicated categories provides high confidence

- Positive factor: High TiO2 grade for a large-scale resource

- Positive factor: NI 43-101 compliant estimate provides credibility

Evidence · text

> The mineral resource estimate contains 1.4 Bt at 4,000 ppm TREO, 1,100 ppm MREO and 12% TiO2 in the Measured and Indicated categories.

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/rau-md-a-30-september-2026--c74dc073-9b4d-4c28-8aa3-e82b68a4f7c1#fact-resource-facts-4)

Tiros Project · rare earth elements

#### Identity

- Project: Tiros Project
- Commodity: rare earth elements
- Region: brazil
- Reported Region: Minas Gerais, Brazil
- Ticker: RAU

#### Resource scope

- Estimate type: resource
- Reporting standards: ni\_43\_101
- QP Signed: Yes
- Resource group id: resource:b3721a823b8335cdd0eb
- Deposit or zone: Tiros Deposit

#### Resource Data

- Category: inferred
- Tonnes: 500000000
- Grade: 3700
- Grade Unit: ppm TREO
- Cutoff Grade: 1000
- Cutoff Unit: ppm TREO

#### Prior Estimate

- Resource Date: 2026-03-15

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-08T00:00:00.000Z

Reasoning: The Inferred resource at Tiros adds significant tonnage and TREO content, highlighting the project's overall scale and future growth potential, though it requires further drilling to upgrade confidence.

- Positive factor: Significant tonnage in the Inferred category indicates further exploration potential

- Positive factor: Good TREO grade for an Inferred resource

- Negative factor: Inferred category has lower geological confidence and cannot be used for economic studies alone

Evidence · text

> The Inferred resource contains 500,000,000 tonnes at 12% TiO2, 3,700 ppm TREO, and 1,000 ppm MREO.

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/rau-md-a-30-september-2026--c74dc073-9b4d-4c28-8aa3-e82b68a4f7c1#fact-resource-facts-5)

Tiros Project · rare earth elements

#### Identity

- Project: Tiros Project
- Commodity: rare earth elements
- Region: brazil
- Reported Region: Minas Gerais, Brazil
- Ticker: RAU

#### Resource scope

- Estimate type: resource
- Reporting standards: ni\_43\_101
- QP Signed: Yes
- Resource group id: resource:b3721a823b8335cdd0eb
- Deposit or zone: Tiros Deposit

#### Resource Data

- Category: inferred
- Tonnes: 500000000
- Grade: 1000
- Grade Unit: ppm MREO
- Cutoff Grade: 1000
- Cutoff Unit: ppm TREO

#### Prior Estimate

- Resource Date: 2026-03-15

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-08T00:00:00.000Z

Reasoning: The Inferred resource at Tiros includes a notable MREO component, contributing to the project's overall scale and potential, but requiring further work to increase confidence.

- Positive factor: Significant tonnage in the Inferred category indicates further exploration potential

- Positive factor: Good MREO grade for an Inferred resource

- Negative factor: Inferred category has lower geological confidence and cannot be used for economic studies alone

Evidence · text

> The Inferred resource contains 500,000,000 tonnes at 12% TiO2, 3,700 ppm TREO, and 1,000 ppm MREO.

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/rau-md-a-30-september-2026--c74dc073-9b4d-4c28-8aa3-e82b68a4f7c1#fact-resource-facts-6)

Tiros Project · titanium

#### Identity

- Project: Tiros Project
- Commodity: titanium
- Region: brazil
- Reported Region: Minas Gerais, Brazil
- Ticker: RAU

#### Resource scope

- Estimate type: resource
- Reporting standards: ni\_43\_101
- QP Signed: Yes
- Resource group id: resource:b3721a823b8335cdd0eb
- Deposit or zone: Tiros Deposit

#### Resource Data

- Category: inferred
- Tonnes: 500000000
- Grade: 12
- Grade Unit: % TiO2
- Cutoff Grade: 1000
- Cutoff Unit: ppm TREO

#### Prior Estimate

- Resource Date: 2026-03-15

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-08T00:00:00.000Z

Reasoning: The Inferred resource at Tiros adds substantial titanium dioxide tonnage at a high grade, contributing to the project's overall potential, but requires further work to upgrade confidence.

- Positive factor: Significant tonnage in the Inferred category indicates further exploration potential

- Positive factor: High TiO2 grade for an Inferred resource

- Negative factor: Inferred category has lower geological confidence and cannot be used for economic studies alone

Evidence · text

> The Inferred resource contains 500,000,000 tonnes at 12% TiO2, 3,700 ppm TREO, and 1,000 ppm MREO.

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**NI 43-101 Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with NI 43-101 \(Canada\) — high reporting standard.

Why it applies: reporting\_standards includes ni\_43\_101

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

## Metallurgical Results (4)

### metallurgical test work

[Link to this fact](https://atlas-aws.minestarters.com/news/rau-md-a-30-september-2026--c74dc073-9b4d-4c28-8aa3-e82b68a4f7c1#fact-metallurgical-facts-10)

Tiros Project · titanium

#### Identity

- Project: Tiros Project
- Commodity: titanium
- Region: brazil
- Reported Region: Minas Gerais, Brazil
- Ticker: RAU

#### Test Work

- Program Status: preliminary
- Test Type: metallurgical test work
- Processing Route: Beneficiation, calcination, magnetic/electrostatic separation, acid leaching, solid/liquid separation for coarse TiO2 concentrate
- Sample: BK19 composite from planned mining starter pits

#### Recovery

- Recovery: 22.7 %
- Recovery Basis: to\_concentrate
- Head Grade: 24.1
- Head Grade Unit: % TiO2
- Conc. Grade: 79.5
- Conc. Grade Unit: % TiO2

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-08T00:00:00.000Z

Reasoning: Preliminary metallurgical test work on the Tiros Project shows a high-grade coarse titanium concentrate can be produced, which is a positive indicator for product quality. However, this represents only a portion of the overall titanium recovery, and further work is needed to confirm variability.

- Positive factor: High concentrate grade of 79.5% TiO2 indicates good product quality

- Positive factor: Recovery to coarse concentrate is a positive step in the flowsheet

- Negative factor: Recovery of 22.7% to coarse concentrate is a partial recovery, not overall

- Negative factor: Test work was on a single composite, limiting variability understanding

Evidence · text

> The overall TiO2 recovery was 72.5% with 22.7% to the +75 microns anatase concentrate and 49.8% to the fines circuit leach product. ... The final TiO2 coarse circuit product assayed 79.5% TiO2.

#### Tags used in scoring

**Mill Route**

Polarity: neutral

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: processing\_route matches the flotation signal

### metallurgical test work

[Link to this fact](https://atlas-aws.minestarters.com/news/rau-md-a-30-september-2026--c74dc073-9b4d-4c28-8aa3-e82b68a4f7c1#fact-metallurgical-facts-11)

Tiros Project · titanium

#### Identity

- Project: Tiros Project
- Commodity: titanium
- Region: brazil
- Reported Region: Minas Gerais, Brazil
- Ticker: RAU

#### Test Work

- Program Status: preliminary
- Test Type: metallurgical test work
- Processing Route: Magnetic separation, acid sulphation / water leach, filtration and hydrolyzation for fine TiO2 product
- Sample: BK19 composite from planned mining starter pits

#### Recovery

- Recovery: 49.8 %
- Recovery Basis: theoretical
- Head Grade: 24.1
- Head Grade Unit: % TiO2

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-08T00:00:00.000Z

Reasoning: The recovery of fine titanium dioxide to leach liquor is a promising step, but it is not yet a final product, indicating that further metallurgical test work is required to define the full recovery process and product quality.

- Positive factor: Recovery to leach liquor indicates potential for fine TiO2 product

- Negative factor: Recovery is to leach liquor, not a final product, requiring further processing

- Negative factor: Test work was on a single composite, limiting variability understanding

Evidence · text

> The overall TiO2 recovery was 72.5% with 22.7% to the +75 microns anatase concentrate and 49.8% to the fines circuit leach product. ... Recoveries quoted for titanium \(49.8% recovery\) and rare earths \(72.5% recovery\) are up to the leach liquor stage. For this stage of investigation, test work was not yet carried out to recover titanium and rare earth products from the leach liquor.

#### Tags used in scoring

**Theoretical Recovery Only**

Polarity: negative

Definition: Only theoretical or liberation-derived recovery reported, with no actual test result.

Why it applies: recovery\_basis is theoretical

### metallurgical test work

[Link to this fact](https://atlas-aws.minestarters.com/news/rau-md-a-30-september-2026--c74dc073-9b4d-4c28-8aa3-e82b68a4f7c1#fact-metallurgical-facts-12)

Tiros Project · titanium

#### Identity

- Project: Tiros Project
- Commodity: titanium
- Region: brazil
- Reported Region: Minas Gerais, Brazil
- Ticker: RAU

#### Test Work

- Program Status: preliminary
- Test Type: metallurgical test work
- Processing Route: Integrated flowsheet
- Sample: BK19 composite from planned mining starter pits

#### Recovery

- Recovery: 72.5 %
- Recovery Basis: actual\_test
- Head Grade: 24.1
- Head Grade Unit: % TiO2

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-08T00:00:00.000Z

Reasoning: The overall titanium dioxide recovery of 72.5% from preliminary test work is a positive indicator for the Tiros Project. However, this is based on a single composite, and further work is needed to optimize and confirm the flowsheet.

- Positive factor: Overall TiO2 recovery of 72.5% is a good result for preliminary test work

- Positive factor: Integrated flowsheet aims for comprehensive recovery

- Negative factor: Test work was on a single composite, limiting variability understanding

- Negative factor: Further metallurgical test work is required to confirm and finalize the processing route

Evidence · text

> The overall TiO2 recovery was 72.5% with 22.7% to the +75 microns anatase concentrate and 49.8% to the fines circuit leach product.

### metallurgical test work

[Link to this fact](https://atlas-aws.minestarters.com/news/rau-md-a-30-september-2026--c74dc073-9b4d-4c28-8aa3-e82b68a4f7c1#fact-metallurgical-facts-13)

Tiros Project · rare earth elements

#### Identity

- Project: Tiros Project
- Commodity: rare earth elements
- Region: brazil
- Reported Region: Minas Gerais, Brazil
- Ticker: RAU

#### Test Work

- Program Status: preliminary
- Test Type: metallurgical test work
- Processing Route: Acid sulphation, water leach, precipitation and filtration for mixed rare earth carbonate \(MREC\) product
- Sample: BK19 composite from planned mining starter pits

#### Recovery

- Recovery: 72.5 %
- Recovery Basis: theoretical
- Head Grade: 0.94
- Head Grade Unit: % TREO

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-08T00:00:00.000Z

Reasoning: Preliminary test work shows a promising recovery of rare earth elements to leach liquor. However, this is not yet a final product, and the PEA's adopted recovery is lower, indicating that further metallurgical work is crucial to de-risk the REE processing.

- Positive factor: Recovery of 72.5% to leach liquor indicates good potential for REE extraction

- Negative factor: Recovery is to leach liquor, not a final product, requiring further processing

- Negative factor: Test work was on a single composite, limiting variability understanding

- Negative factor: PEA adopted a lower overall recovery \(67%\) than the test work to leach liquor

Evidence · text

> The REE recovery to the fines circuit leach product was 72.5%. The 72.5% rare earth recovery represents the recovery to leach liquor achieved during test work on sample BK19 and is not the overall recovery adopted for the PEA process design criteria.

#### Tags used in scoring

**Theoretical Recovery Only**

Polarity: negative

Definition: Only theoretical or liberation-derived recovery reported, with no actual test result.

Why it applies: recovery\_basis is theoretical

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.