Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Resouro Strategic Metals Inc. reported strong Preliminary Economic Assessment (PEA) results for its Tiros Titanium Dioxide and Rare Earth Elements Project, indicating a post-tax NPV of US$714.9 million and an IRR of 44.2% over a 20-year mine life. This PEA is supported by a 2026 Mineral Resource Estimate for Tiros, which includes 1.4 billion tonnes in Measured and Indicated categories. The company also closed a C$2.5 million private placement to fund working capital and advance the Tiros project towards a Pre-Feasibility Study, despite a material uncertainty regarding its going concern status.
Reasoning: Resouro Strategic Metals Inc. reported strong Preliminary Economic Assessment (PEA) results for its Tiros Titanium Dioxide and Rare Earth Elements Project, demonstrating robust project economics and a substantial resource base. This is supported by a recently updated NI 43-101 compliant Mineral Resource Estimate. A recent capital raise provides funding for ongoing work, but the PEA is an early-stage study, further metallurgical work is required, and the company's going concern status introduces financial uncertainty.
Positive factors
- Strong PEA economics (high NPV, IRR, low payback period)
- Large Measured and Indicated resource base for Tiros Project
- Potential for diversified dual-revenue stream (TiO2 and REE)
- Conventional open-pit mining method proposed for Tiros Project
- Recent capital raise provides funding for project advancement
- Project located in a favorable mining jurisdiction with established infrastructure
Negative factors
- PEA is a preliminary study and subject to refinement in future studies
- Metallurgical test work for final product recovery from leach liquor is not yet completed for REE and fine TiO2
- Project economics are sensitive to variations in sale prices of REE and TiO2
- Funding for full project development (engineering, construction, commissioning) is not yet secured
- Company has a material uncertainty regarding its ability to continue as a going concern
Facts used in scoring: 20

Classification and evidence
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: The document details the results of a Preliminary Economic Assessment (PEA) for the Tiros Project, including NPV, IRR, and mine life.
Evidence · text
“Tiros Project – Preliminary Economic Assessment”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: The PEA and MRE are reported under an NI 43-101 Technical Report, which requires sign-off by a Qualified Person.
Evidence · text
“On July 29, 2026 Canada (July 30, 2026 Australia), the Company filed the NI 43-101 Technical Report (“NI 43-101”) supporting the Preliminary Economic Assessment (“PEA”) results for its Tiros Titanium Dioxide and Rare Earth Elements Project in Minas Gerais, Brazil.”
Open Pit Miningneutral · Story-specific tag
No canonical definition is currently available.
Why it applies: The PEA contemplates using an open-pit mining operation for the Tiros Project.
Evidence · text
“Mining operational plans are to use an open-pit mining process with free digging near-surface mineralization;”
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: The Mineral Resource Estimate includes material in the Measured category.
Evidence · text
“The mineral resource estimate contains 1.4 Bt at 4,000 ppm TREO, 1,100 ppm MREO and 12% TiO2 in the Measured and Indicated categories.”
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: The Mineral Resource Estimate includes material in the Indicated category.
Evidence · text
“The mineral resource estimate contains 1.4 Bt at 4,000 ppm TREO, 1,100 ppm MREO and 12% TiO2 in the Measured and Indicated categories.”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The Mineral Resource Estimate includes material in the Inferred category.
Evidence · text
“The Inferred resource contains 500,000,000 tonnes at 12% TiO2, 3,700 ppm TREO, and 1,000 ppm MREO.”
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: The Mineral Resource Estimate was prepared as part of an NI 43-101 Technical Report.
Evidence · text
“Resouro engaged Atticus Geoscience Consulting Ltd. to prepare a mineral resource estimate for the Tiros Deposit (“2026 MRE”).”
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: The cut-off grade for the Mineral Resource Estimate is clearly stated as 1,000 ppm TREO.
Evidence · text
“The 2026 MRE for the Tiros Project considers TiO2, the Total Rare Earth Oxides and the Magnetic Rare Earth Oxides reporting to a cut-off of 1,000 ppm TREO.”
Maiden Resourceneutral
First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.
Why it applies: While the project has prior resources, this is a new 2026 MRE that forms the basis for the PEA, establishing a new baseline.
Evidence · text
“Resouro engaged Atticus Geoscience Consulting Ltd. to prepare a mineral resource estimate for the Tiros Deposit (“2026 MRE”).”
Capital Raiseneutral · Story-specific tag
No canonical definition is currently available.
Why it applies: The company closed a non-brokered private placement on August 11, 2026.
Evidence · text
“Non-brokered Private Placement Closed August 11, 2026”
Bench Scale Onlynegative · Story-specific tag
Only preliminary bench tests completed — no locked-cycle or pilot work.
Why it applies: Metallurgical test work for REE and fine TiO2 recovery was only carried out up to the leach liquor stage, with further test work required for final product recovery.
Evidence · text
“For this stage of investigation, test work was not yet carried out to recover titanium and rare earth products from the leach liquor. This test work, with the leach liquor, will follow in the next stage of test work (PFS level investigation).”
Refractory Orenegative · Story-specific tag
Ore requires oxidation/pressure treatment before recovery — a processing and recovery risk.
Why it applies: The proposed metallurgical flowsheet for REE and fine TiO2 involves complex steps like acid sulphation, hydrolyzation, and precipitation, indicating challenging mineralogy.
Evidence · text
“Proposed processing flowsheet incorporates grinding and sizing beneficiation, calcination, magnetic separation/electrostatic separation and gravity separation, acid leach, sulphation/water leach, hydrolyzation, precipitation, and solid liquid separation;”
Single Domain Onlynegative · Story-specific tag
Testing limited to one composite or domain — representativeness not established.
Why it applies: Metallurgical test work was carried out on a single composite sample (BK19), limiting the understanding of variability across different ore domains.
Evidence · text
“Final test work with these two flowsheets was carried out on a composite sample, BK19, which was characterised with a feed assay of 24.1% TiO2 and 0.94% TREO. This sample was taken from drilling within the planned mining starter pits.”
Going Concernnegative · Story-specific tag
No canonical definition is currently available.
Why it applies: The financial statements are prepared on a going concern basis, but conditions indicate a material uncertainty that may cast significant doubt on the company’s ability to continue as a going concern.
Evidence · text
“These conditions indicate the existence of a material uncertainty that may cast significant doubt on the Company’s ability to continue as a going concern.”
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: the document describes a flotation route ("concentrate")
Gravity Routeneutral
Gravity separation forms a material part of the flowsheet.
Why it applies: the document describes a gravity route ("gravity")
POX/BIOX Routeneutral
Pressure or bio-oxidation for refractory ore — high CAPEX and OPEX.
Why it applies: the document describes a pox_biox route ("roasting")
Extracted facts
Stored fact records: 10. Some facts used in scoring do not have a stored record.
Resource Estimates (6)
indicatedTiros Project · rare earth elementsTonnes: 1400000000Grade: 4000Grade Unit: ppm TREOView all detailsHide details
Identity
- Project
- Tiros Project
- Commodity
- rare earth elements
- Region
- brazil
- Reported Region
- Minas Gerais, Brazil
- Ticker
- RAU
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Resource group id
- resource:ee5143b067097e779786
- Deposit or zone
- Tiros Deposit
Resource Data
- Category
- indicated
- Tonnes
- 1400000000
- Grade
- 4000
- Grade Unit
- ppm TREO
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-03-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The Tiros Project hosts a very large Measured and Indicated resource with a significant TREO grade, providing a strong foundation for future development and supporting the positive PEA results.
Positive factors
- Large tonnage in Measured and Indicated categories provides high confidence
- High TREO grade for a large-scale resource
- NI 43-101 compliant estimate provides credibility
Evidence · text
“The mineral resource estimate contains 1.4 Bt at 4,000 ppm TREO, 1,100 ppm MREO and 12% TiO2 in the Measured and Indicated categories.”
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedTiros Project · rare earth elementsTonnes: 1400000000Grade: 1100Grade Unit: ppm MREOView all detailsHide details
Identity
- Project
- Tiros Project
- Commodity
- rare earth elements
- Region
- brazil
- Reported Region
- Minas Gerais, Brazil
- Ticker
- RAU
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Resource group id
- resource:ee5143b067097e779786
- Deposit or zone
- Tiros Deposit
Resource Data
- Category
- indicated
- Tonnes
- 1400000000
- Grade
- 1100
- Grade Unit
- ppm MREO
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-03-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The Tiros Project's Measured and Indicated resource includes a substantial MREO component, which is critical for the project's economic viability and dual-revenue stream potential.
Positive factors
- Large tonnage in Measured and Indicated categories provides high confidence
- Significant MREO grade within the resource, indicating valuable components
- NI 43-101 compliant estimate provides credibility
Evidence · text
“The mineral resource estimate contains 1.4 Bt at 4,000 ppm TREO, 1,100 ppm MREO and 12% TiO2 in the Measured and Indicated categories.”
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
indicatedTiros Project · titaniumTonnes: 1400000000Grade: 12Grade Unit: % TiO2View all detailsHide details
Identity
- Project
- Tiros Project
- Commodity
- titanium
- Region
- brazil
- Reported Region
- Minas Gerais, Brazil
- Ticker
- RAU
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Resource group id
- resource:ee5143b067097e779786
- Deposit or zone
- Tiros Deposit
Resource Data
- Category
- indicated
- Tonnes
- 1400000000
- Grade
- 12
- Grade Unit
- % TiO2
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-03-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The Tiros Project's Measured and Indicated resource contains a substantial amount of titanium dioxide at a high grade, forming a key part of the project's dual-revenue strategy.
Positive factors
- Large tonnage in Measured and Indicated categories provides high confidence
- High TiO2 grade for a large-scale resource
- NI 43-101 compliant estimate provides credibility
Evidence · text
“The mineral resource estimate contains 1.4 Bt at 4,000 ppm TREO, 1,100 ppm MREO and 12% TiO2 in the Measured and Indicated categories.”
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredTiros Project · rare earth elementsTonnes: 500000000Grade: 3700Grade Unit: ppm TREOView all detailsHide details
Identity
- Project
- Tiros Project
- Commodity
- rare earth elements
- Region
- brazil
- Reported Region
- Minas Gerais, Brazil
- Ticker
- RAU
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Resource group id
- resource:b3721a823b8335cdd0eb
- Deposit or zone
- Tiros Deposit
Resource Data
- Category
- inferred
- Tonnes
- 500000000
- Grade
- 3700
- Grade Unit
- ppm TREO
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-03-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The Inferred resource at Tiros adds significant tonnage and TREO content, highlighting the project's overall scale and future growth potential, though it requires further drilling to upgrade confidence.
Positive factors
- Significant tonnage in the Inferred category indicates further exploration potential
- Good TREO grade for an Inferred resource
Negative factors
- Inferred category has lower geological confidence and cannot be used for economic studies alone
Evidence · text
“The Inferred resource contains 500,000,000 tonnes at 12% TiO2, 3,700 ppm TREO, and 1,000 ppm MREO.”
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredTiros Project · rare earth elementsTonnes: 500000000Grade: 1000Grade Unit: ppm MREOView all detailsHide details
Identity
- Project
- Tiros Project
- Commodity
- rare earth elements
- Region
- brazil
- Reported Region
- Minas Gerais, Brazil
- Ticker
- RAU
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Resource group id
- resource:b3721a823b8335cdd0eb
- Deposit or zone
- Tiros Deposit
Resource Data
- Category
- inferred
- Tonnes
- 500000000
- Grade
- 1000
- Grade Unit
- ppm MREO
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-03-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The Inferred resource at Tiros includes a notable MREO component, contributing to the project's overall scale and potential, but requiring further work to increase confidence.
Positive factors
- Significant tonnage in the Inferred category indicates further exploration potential
- Good MREO grade for an Inferred resource
Negative factors
- Inferred category has lower geological confidence and cannot be used for economic studies alone
Evidence · text
“The Inferred resource contains 500,000,000 tonnes at 12% TiO2, 3,700 ppm TREO, and 1,000 ppm MREO.”
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredTiros Project · titaniumTonnes: 500000000Grade: 12Grade Unit: % TiO2View all detailsHide details
Identity
- Project
- Tiros Project
- Commodity
- titanium
- Region
- brazil
- Reported Region
- Minas Gerais, Brazil
- Ticker
- RAU
Resource scope
- Estimate type
- resource
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Resource group id
- resource:b3721a823b8335cdd0eb
- Deposit or zone
- Tiros Deposit
Resource Data
- Category
- inferred
- Tonnes
- 500000000
- Grade
- 12
- Grade Unit
- % TiO2
- Cutoff Grade
- 1000
- Cutoff Unit
- ppm TREO
Prior Estimate
- Resource Date
- 2026-03-15
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The Inferred resource at Tiros adds substantial titanium dioxide tonnage at a high grade, contributing to the project's overall potential, but requires further work to upgrade confidence.
Positive factors
- Significant tonnage in the Inferred category indicates further exploration potential
- High TiO2 grade for an Inferred resource
Negative factors
- Inferred category has lower geological confidence and cannot be used for economic studies alone
Evidence · text
“The Inferred resource contains 500,000,000 tonnes at 12% TiO2, 3,700 ppm TREO, and 1,000 ppm MREO.”
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
Metallurgical Results (4)
metallurgical test workTiros Project · titaniumRecovery: 22.7 %Head Grade: 24.1Head Grade Unit: % TiO2View all detailsHide details
Identity
- Project
- Tiros Project
- Commodity
- titanium
- Region
- brazil
- Reported Region
- Minas Gerais, Brazil
- Ticker
- RAU
Test Work
- Program Status
- preliminary
- Test Type
- metallurgical test work
- Processing Route
- Beneficiation, calcination, magnetic/electrostatic separation, acid leaching, solid/liquid separation for coarse TiO2 concentrate
- Sample
- BK19 composite from planned mining starter pits
Recovery
- Recovery
- 22.7 %
- Recovery Basis
- to_concentrate
- Head Grade
- 24.1
- Head Grade Unit
- % TiO2
- Conc. Grade
- 79.5
- Conc. Grade Unit
- % TiO2
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: Preliminary metallurgical test work on the Tiros Project shows a high-grade coarse titanium concentrate can be produced, which is a positive indicator for product quality. However, this represents only a portion of the overall titanium recovery, and further work is needed to confirm variability.
Positive factors
- High concentrate grade of 79.5% TiO2 indicates good product quality
- Recovery to coarse concentrate is a positive step in the flowsheet
Negative factors
- Recovery of 22.7% to coarse concentrate is a partial recovery, not overall
- Test work was on a single composite, limiting variability understanding
Evidence · text
“The overall TiO2 recovery was 72.5% with 22.7% to the +75 microns anatase concentrate and 49.8% to the fines circuit leach product. ... The final TiO2 coarse circuit product assayed 79.5% TiO2.”
Tags used in scoring
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: processing_route matches the flotation signal
metallurgical test workTiros Project · titaniumRecovery: 49.8 %Head Grade: 24.1Head Grade Unit: % TiO2View all detailsHide details
Identity
- Project
- Tiros Project
- Commodity
- titanium
- Region
- brazil
- Reported Region
- Minas Gerais, Brazil
- Ticker
- RAU
Test Work
- Program Status
- preliminary
- Test Type
- metallurgical test work
- Processing Route
- Magnetic separation, acid sulphation / water leach, filtration and hydrolyzation for fine TiO2 product
- Sample
- BK19 composite from planned mining starter pits
Recovery
- Recovery
- 49.8 %
- Recovery Basis
- theoretical
- Head Grade
- 24.1
- Head Grade Unit
- % TiO2
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The recovery of fine titanium dioxide to leach liquor is a promising step, but it is not yet a final product, indicating that further metallurgical test work is required to define the full recovery process and product quality.
Positive factors
- Recovery to leach liquor indicates potential for fine TiO2 product
Negative factors
- Recovery is to leach liquor, not a final product, requiring further processing
- Test work was on a single composite, limiting variability understanding
Evidence · text
“The overall TiO2 recovery was 72.5% with 22.7% to the +75 microns anatase concentrate and 49.8% to the fines circuit leach product. ... Recoveries quoted for titanium (49.8% recovery) and rare earths (72.5% recovery) are up to the leach liquor stage. For this stage of investigation, test work was not yet carried out to recover titanium and rare earth products from the leach liquor.”
Tags used in scoring
Theoretical Recovery Onlynegative
Only theoretical or liberation-derived recovery reported, with no actual test result.
Why it applies: recovery_basis is theoretical
metallurgical test workTiros Project · titaniumRecovery: 72.5 %Head Grade: 24.1Head Grade Unit: % TiO2View all detailsHide details
Identity
- Project
- Tiros Project
- Commodity
- titanium
- Region
- brazil
- Reported Region
- Minas Gerais, Brazil
- Ticker
- RAU
Test Work
- Program Status
- preliminary
- Test Type
- metallurgical test work
- Processing Route
- Integrated flowsheet
- Sample
- BK19 composite from planned mining starter pits
Recovery
- Recovery
- 72.5 %
- Recovery Basis
- actual_test
- Head Grade
- 24.1
- Head Grade Unit
- % TiO2
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: The overall titanium dioxide recovery of 72.5% from preliminary test work is a positive indicator for the Tiros Project. However, this is based on a single composite, and further work is needed to optimize and confirm the flowsheet.
Positive factors
- Overall TiO2 recovery of 72.5% is a good result for preliminary test work
- Integrated flowsheet aims for comprehensive recovery
Negative factors
- Test work was on a single composite, limiting variability understanding
- Further metallurgical test work is required to confirm and finalize the processing route
Evidence · text
“The overall TiO2 recovery was 72.5% with 22.7% to the +75 microns anatase concentrate and 49.8% to the fines circuit leach product.”
metallurgical test workTiros Project · rare earth elementsRecovery: 72.5 %Head Grade: 0.94Head Grade Unit: % TREOView all detailsHide details
Identity
- Project
- Tiros Project
- Commodity
- rare earth elements
- Region
- brazil
- Reported Region
- Minas Gerais, Brazil
- Ticker
- RAU
Test Work
- Program Status
- preliminary
- Test Type
- metallurgical test work
- Processing Route
- Acid sulphation, water leach, precipitation and filtration for mixed rare earth carbonate (MREC) product
- Sample
- BK19 composite from planned mining starter pits
Recovery
- Recovery
- 72.5 %
- Recovery Basis
- theoretical
- Head Grade
- 0.94
- Head Grade Unit
- % TREO
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-08T00:00:00.000Z
Reasoning: Preliminary test work shows a promising recovery of rare earth elements to leach liquor. However, this is not yet a final product, and the PEA's adopted recovery is lower, indicating that further metallurgical work is crucial to de-risk the REE processing.
Positive factors
- Recovery of 72.5% to leach liquor indicates good potential for REE extraction
Negative factors
- Recovery is to leach liquor, not a final product, requiring further processing
- Test work was on a single composite, limiting variability understanding
- PEA adopted a lower overall recovery (67%) than the test work to leach liquor
Evidence · text
“The REE recovery to the fines circuit leach product was 72.5%. The 72.5% rare earth recovery represents the recovery to leach liquor achieved during test work on sample BK19 and is not the overall recovery adopted for the PEA process design criteria.”
Tags used in scoring
Theoretical Recovery Onlynegative
Only theoretical or liberation-derived recovery reported, with no actual test result.
Why it applies: recovery_basis is theoretical
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.