# Quarterly Activities Report – September 2026

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/quarterly-activities-report-september-2026--11a03e42-13c2-44aa-a8a0-f1a010d6c5bf

Original source: https://senspdf.jse.co.za/documents/SENS_20261102_S605919.pdf

Publisher: jse

Original announcement: 2026-11-02T07:45:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-11-02T10:16:07.420Z

Atlas analysis updated: 2026-11-02T10:16:07.420Z

- Company: Elevate Uranium Limited

- Ticker: EL8

- Exchange: JSE

- Region: Namibia

- Primary commodity: Uranium

- Secondary commodities: None reported

- Document categories: Other, Metallurgy, Agreement transaction

- Extracted: 2026-11-02 10:05:29 UTC

Narrative sentiment: 0.40 · Bullish

## Minestarters Atlas summary

Elevate Uranium reported quarterly activities for September 2026, highlighting successful pilot plant results at the Marenica project with a 7x uranium upgrade ratio. The company also executed agreements to increase its interest in the Marenica project to 90% and reported significant drilling activity across its portfolio.

Reasoning: The report provides a mix of operational progress \(pilot plant\), strategic growth \(increased ownership\), and drilling activity, though no new assay results were released.

- Positive factor: Successful pilot plant results confirming historical performance

- Positive factor: Significant upgrade ratio of 7x achieved

- Positive factor: Increased project interest from 75% to 90%

- Positive factor: Strong cash position of $22.2 million

- Negative factor: Uranium recovery of 79% is relatively low, though noted as in line with expectations

Facts used in scoring: 1

## Classification and evidence

**Pilot Scale Complete**

Polarity: positive

Definition: Pilot or demonstration plant testing completed under continuous operation.

Why it applies: The report announces the release of first pilot-scale results for Stages 1 to 4.

Evidence · text

> First pilot-scale results released

**Resource Update**

Polarity: neutral

Story-specific tag

Definition: Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The report mentions significant drilling activity \(718 holes at Marenica and 191 holes at Koppies\) which typically supports future resource updates.

Evidence · text

> A total of 718 holes for 31,115 metres were drilled at the Marenica Project

**Mill Route**

Polarity: neutral

Definition: Processing via mill or concentrator \(CIL, CIP, tank leach, flotation\).

Why it applies: the document describes a flotation route \("flotation"\)

**Single Domain Only**

Polarity: negative

Definition: Testing limited to one composite or domain — representativeness not established.

Why it applies: only one composite was tested

## Extracted facts

Stored fact records: 1. Some facts used in scoring do not have a stored record.

## Metallurgical Results (1)

### pilot plant

[Link to this fact](https://atlas-aws.minestarters.com/news/quarterly-activities-report-september-2026--11a03e42-13c2-44aa-a8a0-f1a010d6c5bf#fact-metallurgical-facts-0)

Marenica Uranium Project · uranium

#### Identity

- Project: Marenica Uranium Project
- Commodity: uranium
- Region: namibia
- Reported Region: Namibia
- Ticker: EL8

#### Test Work

- Program Status: detailed
- Test Type: pilot plant
- Processing Route: Stages 1 to 4 pilot plant
- Sample: Marenica ore, Stages 1 to 4 pilot plant

#### Recovery

- Recovery: 79 %
- Recovery Basis: actual\_test
- Head Grade: 89
- Head Grade Unit: ppm U

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-02T00:00:00.000Z

Reasoning: First pilot-scale results released for the U-pgradeTM process.

- Positive factor: Confirms expected performance

- Positive factor: Achieved 7x upgrade ratio

- Negative factor: 79% recovery is on the lower side

Evidence · text

> Uranium recovery of 79% reported through Stages 1 to 4, in line with expectations

#### Tags used in scoring

**Pilot Scale Complete**

Polarity: positive

Definition: Pilot or demonstration plant testing completed under continuous operation.

Why it applies: test\_type names pilot-scale work

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.