PUR: Rio Grande Sur Pre-Feasibility Study & Ore Reserve Addendum

Original announcement by asx on

Company
Pursuit Minerals Limited
Ticker
PUR
Exchange
ASX
Region
Salta Province, Argentina
Primary commodity
Lithium
Secondary commodities
None reported
Document categories
Other, Resource update, Metallurgy
Extracted
2026-11-05 22:14:45 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Pursuit Minerals Limited announced a Pre-Feasibility Study Addendum for its Rio Grande Sur Lithium Project, reporting a 250% increase in Probable Ore Reserve to 438,000 tonnes LCE. The study outlines a staged expansion to 17,500 tpa LCE, projecting strong economics with an estimated US$1.09 billion NPV and 26.2% IRR for the lithium carbonate pathway, and a lower-cost lithium chloride alternative. The project demonstrates resilience to price fluctuations and a capital-efficient development strategy, with potential for further resource growth.

Reasoning: The PFS Addendum demonstrates significantly improved project economics and a substantially increased Probable Ore Reserve for the Rio Grande Sur Lithium Project, outlining a robust staged development plan with commercial flexibility and strong financial returns, despite inherent commodity price risks and financing uncertainties.

Positive factors

  • Significant increase in Probable Ore Reserve (250% increase)
  • Strong economic metrics (NPV, IRR, free cash flow) for both carbonate and chloride pathways
  • Staged development strategy minimizes dilution by funding Stage 2 from Stage 1 cash flow
  • Low operating costs for lithium chloride pathway (US$3,880/t LCE for Stage 2)
  • Project robustness demonstrated at lithium prices 30% below reference price
  • Potential for further resource growth from Inferred resources and recent drilling
  • JORC 2012 compliant Ore Reserve and Mineral Resource estimates
  • Potential benefits from Argentina's RIGI investment regime

Negative factors

  • Lithium price volatility is a significant risk to project economics
  • Project financing is not yet secured, with no binding commitments in place
  • Lithium chloride market is emerging, and price assumption requires validation through offtake engagement
  • Stage 2 capital estimates carry a 20% contingency, reflecting an earlier level of definition
  • Inferred Mineral Resources are not included in the Ore Reserve, limiting current mine plan confidence
  • Stage 2 DSCR minimum for the carbonate pathway falls below covenant at 30% below reference price

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 9

Atlas analysis — Pursuit Minerals Limited: PUR: Rio Grande Sur Pre-Feasibility Study & Ore Reserve Addendum. probable 438000 tonnes; 68.57% recovery

Classification and evidence

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: The document is a Pre-Feasibility Study Addendum, and the Ore Reserve estimate is supported by completion of a Pre-Feasibility Study.

Evidence · text

“The Pre-Feasibility Study Addendum (“PFS Addendum” or “Addendum”) referred to in this announcement has been undertaken by Pursuit Minerals Ltd”

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The document announces an updated JORC (2012) Ore Reserve.

Evidence · text

“presents an updated JORC (2012) Ore Reserve”

Tonnage Growthpositive

Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.

Why it applies: The Probable Ore Reserve increased by approximately 250% to 438,000 tonnes LCE, up from 125,000 tonnes LCE.

Evidence · text

“Probable Ore Reserve increased by approximately 250% to 438,000 tonnes LCE, up from 125,000 tonnes LCE”

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: The Probable Ore Reserve increased by approximately 250% to 438,000 tonnes LCE, up from 125,000 tonnes LCE, directly indicating contained metal growth.

Evidence · text

“Probable Ore Reserve increased by approximately 250% to 438,000 tonnes LCE, up from 125,000 tonnes LCE”

Category Upgradepositive

Resource confidence improved — Inferred upgraded to Indicated, or Indicated to Measured. De-risking signal.

Why it applies: The increased Ore Reserve has been derived entirely from Indicated Mineral Resources, indicating a conversion and upgrade of resource confidence.

Evidence · text

“The increased Ore Reserve has been derived entirely from Indicated Mineral Resources”

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The document reports an updated Probable Ore Reserve of approximately 438,000 tonnes LCE.

Evidence · text

“Probable Ore Reserve increased by approximately 250% to 438,000 tonnes LCE”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The Ore Reserve and Mineral Resource estimates have been prepared in accordance with the requirements of the JORC Code (2012 Edition).

Evidence · text

“The Company confirms that the Ore Reserve and Mineral Resource estimates have been prepared by Competent Persons in accordance with the requirements of the JORC Code (2012 Edition).”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Mr. Leandro Sastre Salim is the Competent Person for Mineral Resources and Mr Christian Lathrop is the Competent Person for Ore Reserves and process engineering.

Evidence · text

“Statements contained in this announcement regarding Exploration Results and Mineral Resources are based on, and fairly represent, information compiled by Mr. Leandro Sastre Salim”

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: A conservative lithium cut-off grade of 360 mg/L Li has been applied for Ore Reserve estimation.

Evidence · text

“A conservative lithium cut-off grade of 360 mg/L Li has been applied for Ore Reserve estimation.”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The Mineral Resource includes 559 kt LCE of Inferred Resources.

Evidence · text

“559 kt LCE of Inferred Resources at 405 mg/L Li”

Theoretical Recovery Onlynegative

Only theoretical or liberation-derived recovery reported, with no actual test result.

Why it applies: The reported recoveries are 'overall design recovery' or 'stated overall recovery', indicating they are theoretical design figures rather than actual test results.

Evidence · text

“overall design recovery of 68.57% from raw brine to final product.”

High NPVpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: The lithium carbonate development delivers an estimated US$1.09 billion NPV.

Evidence · text

“delivering an estimated US$1.09 billion NPV”

High IRRpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: The lithium carbonate development delivers an estimated 26.2% IRR.

Evidence · text

“26.2% IRR”

Low OPEXpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: The lithium chloride alternative offers Stage 2 operating costs of just US$3,880/t LCE, which is approximately 30% below the reference range for other brine developments.

Evidence · text

“Stage 2 operating costs of just US$3,880/t LCE”

Staged Developmentpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: The development strategy is staged, enabling Stage 2 equity funding from Stage 1 cash flow, minimizing potential dilution.

Evidence · text

“Staged development enables Stage 2 equity funding from Stage 1 cash flow, minimising potential dilution”

Price Sensitivity Analysispositive · Story-specific tag

No canonical definition is currently available.

Why it applies: Sensitivity analysis demonstrates positive economics across all four scenarios at lithium prices 30% below the reference price.

Evidence · text

“sensitivity analysis demonstrating positive economics across all four scenarios at lithium prices 30% below the US$27,300/t LCE reference price.”

Financing Risknegative · Story-specific tag

No canonical definition is currently available.

Why it applies: Development remains subject to securing sufficient equity, debt and/or offtake-linked financing, with no binding financing commitments currently in place.

Evidence · text

“Development remains subject to securing sufficient equity, debt and/or offtake-linked financing on acceptable commercial terms. The availability, timing and cost of financing remain uncertain, with no binding financing commitments currently in place”

Commodity Price Volatilitynegative · Story-specific tag

No canonical definition is currently available.

Why it applies: Lithium prices are subject to significant fluctuations driven by global supply and demand, market conditions and broader economic factors.

Evidence · text

“Lithium prices are subject to significant fluctuations driven by global supply and demand, market conditions and broader economic factors.”

Market Risknegative · Story-specific tag

No canonical definition is currently available.

Why it applies: The market for lithium chloride is still emerging, and the price assumption requires validation through engagement with prospective offtake partners.

Evidence · text

“The market for lithium chloride is still emerging and is attracting increasing interest from downstream converters seeking secure feedstock, particularly in the United States. Pricing and contract structures are less mature than those for lithium carbonate, and the Addendum assumes lithium chloride realises 80% of the carbonate reference price on an LCE basis; this assumption requires validation through engagement with prospective offtake partners.”

Regulatory Risknegative · Story-specific tag

No canonical definition is currently available.

Why it applies: Argentine country risk, including changes to taxation, regulation and investment conditions, is identified as a key risk.

Evidence · text

“Argentine country risk, including changes to taxation, regulation and investment conditions.”

DSCR Minimum Below Covenantnegative · Story-specific tag

No canonical definition is currently available.

Why it applies: At 30% below the reference price, Stage 2 coverage in Scenario B (Carbonate Expansion) falls to 1.05x, which is below the assumed 1.25x minimum DSCR covenant.

Evidence · text

“at 30% below the reference price, Stage 2 coverage in Scenario B falls to 1.05x, below the covenant”

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: the document describes a flotation route ("concentrate")

Single Domain Onlynegative

Testing limited to one composite or domain — representativeness not established.

Why it applies: only one composite was tested

Extracted facts

Stored fact records: 5. Some facts used in scoring do not have a stored record.

Resource Estimates (3)

indicatedRio Grande Sur Lithium Project · lithiumTonnes: 705000000Grade: 443Grade Unit: mg/LContained Metal: 705000Contained Unit: t lceHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Rio Grande Sur Lithium Project
Commodity
lithium
Region
argentina
Reported Region
Salta Province, Argentina
Ticker
PUR

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr. Leandro Sastre
Resource group id
resource:57790a537a4201a0b782

Resource Data

Category
indicated
Tonnes
705000000
Grade
443
Grade Unit
mg/L
Contained Metal
705000
Contained Unit
t lce

Prior Estimate

Resource Date
2026-01-23

Location

Easting
2584519.37
Northing
7224968.7
CRS
POSGAR 94 / Argentina 2
EPSG
22182
Loc. Confidence
medium

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-02-02T00:00:00.000Z

Dates

Event date
2026-11-05T00:00:00.000Z

Reasoning: This Indicated Mineral Resource forms a significant part of the project's overall resource base, but it is historical and unchanged from a previous announcement, limiting its novelty.

Positive factors

  • JORC 2012 compliant
  • QP/CP signed

Negative factors

  • No cut-off grade applied
  • Estimate is historical, unchanged from prior release

Evidence · table

“705”

Context: Indicated

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredRio Grande Sur Lithium Project · lithiumTonnes: 559000000Grade: 405Grade Unit: mg/LContained Metal: 559000Contained Unit: t lceHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Rio Grande Sur Lithium Project
Commodity
lithium
Region
argentina
Reported Region
Salta Province, Argentina
Ticker
PUR

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr. Leandro Sastre
Resource group id
resource:b4ed19edf183918648e5

Resource Data

Category
inferred
Tonnes
559000000
Grade
405
Grade Unit
mg/L
Contained Metal
559000
Contained Unit
t lce

Prior Estimate

Resource Date
2026-01-23

Location

Easting
2584519.37
Northing
7224968.7
CRS
POSGAR 94 / Argentina 2
EPSG
22182
Loc. Confidence
medium

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-02-02T00:00:00.000Z

Dates

Event date
2026-11-05T00:00:00.000Z

Reasoning: This Inferred Mineral Resource provides potential for future growth but has lower confidence and is historical, limiting its immediate impact.

Positive factors

  • JORC 2012 compliant
  • QP/CP signed

Negative factors

  • Inferred category implies lower confidence
  • No cut-off grade applied
  • Estimate is historical, unchanged from prior release

Evidence · table

“559”

Context: Inferred

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableRio Grande Sur Lithium Project · lithiumTonnes: 438000Grade: 670Grade Unit: mg/LContained Metal: 438000Contained Unit: t lceView all details
Link to this fact

Identity

Project
Rio Grande Sur Lithium Project
Commodity
lithium
Region
argentina
Reported Region
Salta Province, Argentina
Ticker
PUR

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Mr Christian Lathrop
Resource group id
resource:bdcff81572573634bfd9
Ownership percent
100 %

Resource Data

Category
probable
Tonnes
438000
Grade
670
Grade Unit
mg/L
Contained Metal
438000
Contained Unit
t lce
Cutoff Grade
360
Cutoff Unit
mg/L Li

Prior Estimate

Resource Date
2026-10-20
Prior Tonnes
125000
Prior Contained Metal
125000

Location

Easting
2584519.37
Northing
7224968.7
CRS
POSGAR 94 / Argentina 2
EPSG
22182
Loc. Confidence
medium

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-05T00:00:00.000Z

Reasoning: The Probable Ore Reserve shows a substantial 250% increase, significantly enhancing the project's scale and economic viability, and is compliant with JORC 2012 standards.

Positive factors

  • Significant tonnage growth (250% increase) compared to prior estimate
  • JORC 2012 compliant
  • QP/CP signed
  • Cut-off grade disclosed
  • Supports a long mine life (27 years)

Evidence · table

“~438,000”

Context: Probable

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Tonnage Growthpositive

Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.

Why it applies: 438000 against 125000 previously

Contained Metal Growthpositive

True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 438000 against 125000 previously

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Metallurgical Results (2)

process engineeringRio Grande Sur Lithium Project · lithiumRecovery: 68.57 %Head Grade: 609.75Head Grade Unit: mg/L LiView all details
Link to this fact

Identity

Project
Rio Grande Sur Lithium Project
Commodity
lithium
Region
argentina
Reported Region
Salta Province, Argentina
Ticker
PUR

Test Work

Program Status
detailed
Test Type
process engineering
Processing Route
evaporation, liming, first carbonation, boron solvent extraction, ion exchange, second carbonation
Sample
raw brine feed

Recovery

Recovery
68.57 %
Recovery Basis
theoretical
Head Grade
609.75
Head Grade Unit
mg/L Li
Conc. Grade
99.5
Conc. Grade Unit
% Li₂CO₃

Lab

Consultant
IMEC Ingeniería 360

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-05T00:00:00.000Z

Reasoning: The design recovery for the lithium carbonate pathway is moderate, but it is theoretical and needs validation through testwork, especially given the brine's impurity profile.

Positive factors

  • Design recovery for battery-grade lithium carbonate
  • Processing route is established industry practice

Negative factors

  • Recovery is theoretical (design) rather than actual test result
  • High impurity levels (Mg, SO4, B) drive reagent consumption

Evidence · table

“68.57”

Context: Global recovery

Tags used in scoring

Theoretical Recovery Onlynegative

Only theoretical or liberation-derived recovery reported, with no actual test result.

Why it applies: recovery_basis is theoretical

process engineeringRio Grande Sur Lithium Project · lithiumRecovery: 63.07 %Head Grade: 609.75Head Grade Unit: mg/L LiView all details
Link to this fact

Identity

Project
Rio Grande Sur Lithium Project
Commodity
lithium
Region
argentina
Reported Region
Salta Province, Argentina
Ticker
PUR

Test Work

Program Status
detailed
Test Type
process engineering
Processing Route
evaporation, liming, first carbonation, boron solvent extraction, ion exchange, fractional crystallisation
Sample
raw brine feed

Recovery

Recovery
63.07 %
Recovery Basis
theoretical
Head Grade
609.75
Head Grade Unit
mg/L Li

Lab

Consultant
IMEC Ingeniería 360

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-05T00:00:00.000Z

Reasoning: The design recovery for the lithium chloride pathway is moderate, but it is theoretical and needs validation through testwork, especially given the brine's impurity profile.

Positive factors

  • Design recovery for technical-grade lithium chloride
  • Processing route is established industry practice

Negative factors

  • Recovery is theoretical (design) rather than actual test result
  • High impurity levels (Mg, SO4, B) drive reagent consumption

Evidence · table

“63.07%”

Context: Stated overall recovery

Tags used in scoring

Theoretical Recovery Onlynegative

Only theoretical or liberation-derived recovery reported, with no actual test result.

Why it applies: recovery_basis is theoretical

Low Recoverynegative

Recovery below the weak band for the commodity and processing route.

Why it applies: 63.07% is below the weak band (65%)

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.