# PLS: September 2026 Quarterly Activities Report

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/pls-september-2026-quarterly-activities-report--c9971c86-dfa7-4840-98c2-5126805f45c2

Original source: https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03158024

Publisher: asx

Original announcement: 2026-10-27T21:00:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-10-27T23:01:31.355Z

Atlas analysis updated: 2026-10-27T23:01:31.355Z

- Company: PLS Group Limited

- Ticker: PLS

- Exchange: ASX

- Region: Pilbara

- Primary commodity: Unavailable

- Secondary commodities: None reported

- Document categories: Resource update, Production, Capital raise

- Extracted: 2026-10-27 22:54:23 UTC

Narrative sentiment: 0.80 · Bullish

## Minestarters Atlas summary

Pilbara Minerals reported a strong September 2026 quarter with record spodumene concentrate production and decreased unit operating costs. Post-quarter, the company announced a significant 31% increase in Pilgangoora's Ore Reserve contained lithium, a US$700 million senior unsecured notes offering, and a final investment decision for the P2000 expansion project. These developments underscore the company's growth trajectory, enhanced financial flexibility, and commitment to sustainable operations.

Reasoning: The report details a substantial increase in lithium Ore Reserves, record production, a successful debt offering, and a major expansion project moving forward, all contributing to a very positive outlook for the company.

- Positive factor: Significant increase in Ore Reserve contained lithium

- Positive factor: Record spodumene concentrate production

- Positive factor: Successful capital raise for expansion

- Positive factor: Final Investment Decision for major P2000 expansion

- Positive factor: Power Purchase Agreement signed for lower costs and emissions

- Positive factor: Decreased unit operating costs

- Negative factor: Sales volumes impacted by shipment timing

- Negative factor: Unit costs expected to increase over remainder of FY27 due to seasonal impacts

Facts used in scoring: 13

## Classification and evidence

No classification tags are available.

## Extracted facts

Stored fact records: 13. Some facts used in scoring do not have a stored record.

## Resource Estimates (13)

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/pls-september-2026-quarterly-activities-report--c9971c86-dfa7-4840-98c2-5126805f45c2#fact-resource-facts-0)

Pilgangoora Operation · lithium

#### Identity

- Project: Pilgangoora Operation
- Commodity: lithium
- Ticker: PLS

#### Resource scope

- Estimate type: reserve
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Ross Jaine, Simon Kusabs
- Resource group id: resource:d00927860bfa2e1a2c5f
- Deposit or zone: Pilgangoora

#### Resource Data

- Category: probable
- Tonnes: 249200000
- Grade: 1.24
- Grade Unit: % Li2O
- Contained Metal: 3.09
- Contained Unit: mt li2o

#### Prior Estimate

- Prior Tonnes: 202601626
- Prior Grade: 1.164
- Prior Contained Metal: 2.3587

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: The updated Ore Reserve shows a substantial increase in both tonnes and contained lithium, indicating significant growth and de-risking of the project, supported by JORC compliance and QP sign-off.

- Positive factor: Significant increase in contained lithium \(31%\)

- Positive factor: Significant increase in Ore Reserve tonnes \(23%\)

- Positive factor: JORC compliant

- Positive factor: QP/CP signed

Evidence · text

> The updated Ore Reserve of 249.2Mt at 1.24% Li2O increases Ore Reserve tonnes by 23% and contained lithium by ~31% relative to the Ore Reserve in the Company’s FY26 Annual Report

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**Tonnage Growth**

Polarity: positive

Definition: Significant tonnage increase \(≥15%\) vs prior estimate with grade maintained or improved.

Why it applies: 249200000 against 202601626 previously

**Grade Improvement**

Polarity: positive

Definition: Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: 1.24 against 1.164 previously

**Contained Metal Growth**

Polarity: positive

Definition: True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.

Why it applies: 3.09 against 2.3587 previously

### Pilgangoora

[Link to this fact](https://atlas-aws.minestarters.com/news/pls-september-2026-quarterly-activities-report--c9971c86-dfa7-4840-98c2-5126805f45c2#fact-resource-facts-1)

Pilgangoora Operation · lithium

#### Identity

- Project: Pilgangoora Operation
- Commodity: lithium
- Ticker: PLS

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Qualified person names: Ross Jaine, Simon Kusabs
- Resource group id: resource:7c0cb5765cd091c84d8a
- Deposit or zone: Pilgangoora

#### Resource Data

- Tonnes: 403000000
- Grade: 1.33
- Grade Unit: % Li2O
- Contained Metal: 5.3
- Contained Unit: mt li2o

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: The updated Mineral Resource shows a substantial total tonnage and grade, providing a strong foundation for future development, though specific category breakdown for the total is not detailed.

- Positive factor: Large total Mineral Resource

- Positive factor: Good grade for lithium

- Positive factor: JORC compliant

- Positive factor: QP/CP signed

- Negative factor: Specific resource categories \(Measured, Indicated, Inferred\) not provided for the total

Evidence · text

> The updated Pilgangoora Mineral Resource was also split into open pit and underground components totalling 403Mt at 1.33% Li2O

#### Tags used in scoring

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

### Fact 3

[Link to this fact](https://atlas-aws.minestarters.com/news/pls-september-2026-quarterly-activities-report--c9971c86-dfa7-4840-98c2-5126805f45c2#fact-resource-facts-2)

Pilgangoora Operation · lithium

#### Identity

- Project: Pilgangoora Operation
- Commodity: lithium
- Ticker: PLS

#### Resource scope

- Resource group id: resource:90ec3f0a21a6cb62de65

#### Resource Data

- Grade Unit: tonnes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: The company achieved record spodumene concentrate production, representing a strong operational performance and a significant increase from the previous quarter.

- Positive factor: Record production achieved

- Positive factor: Significant increase from prior quarter

Evidence · table

> 267.6

Context: Production

#### Tags used in scoring

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### Fact 4

[Link to this fact](https://atlas-aws.minestarters.com/news/pls-september-2026-quarterly-activities-report--c9971c86-dfa7-4840-98c2-5126805f45c2#fact-resource-facts-3)

Pilgangoora Operation · lithium

#### Identity

- Project: Pilgangoora Operation
- Commodity: lithium
- Ticker: PLS

#### Resource scope

- Resource group id: resource:90ec3f0a21a6cb62de65

#### Resource Data

- Grade Unit: tonnes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: Sales volumes decreased compared to the prior quarter, primarily due to shipment timing delays, despite strong customer demand.

- Negative factor: Sales volumes decreased from prior quarter

- Negative factor: Sales impacted by shipment timing

Evidence · table

> 223.6

Context: Sales

#### Tags used in scoring

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### Fact 5

[Link to this fact](https://atlas-aws.minestarters.com/news/pls-september-2026-quarterly-activities-report--c9971c86-dfa7-4840-98c2-5126805f45c2#fact-resource-facts-4)

Pilgangoora Operation · tantalum

#### Identity

- Project: Pilgangoora Operation
- Commodity: tantalum
- Ticker: PLS

#### Resource scope

- Resource group id: resource:90ec3f0a21a6cb62de65

#### Resource Data

- Grade Unit: lbs

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: Tantalite concentrate production remained relatively stable compared to the prior quarter.

Evidence · table

> 46,233

Context: Tantalite concentrate produced

#### Tags used in scoring

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### Fact 6

[Link to this fact](https://atlas-aws.minestarters.com/news/pls-september-2026-quarterly-activities-report--c9971c86-dfa7-4840-98c2-5126805f45c2#fact-resource-facts-5)

Pilgangoora Operation · tantalum

#### Identity

- Project: Pilgangoora Operation
- Commodity: tantalum
- Ticker: PLS

#### Resource scope

- Resource group id: resource:90ec3f0a21a6cb62de65

#### Resource Data

- Grade Unit: lbs

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: Tantalite concentrate sales decreased significantly compared to the prior quarter.

- Negative factor: Tantalite sales decreased significantly from prior quarter

Evidence · table

> 39,235

Context: Tantalite concentrate shipped

#### Tags used in scoring

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### Fact 7

[Link to this fact](https://atlas-aws.minestarters.com/news/pls-september-2026-quarterly-activities-report--c9971c86-dfa7-4840-98c2-5126805f45c2#fact-resource-facts-6)

Pilgangoora Operation · lithium

#### Identity

- Project: Pilgangoora Operation
- Commodity: lithium
- Ticker: PLS

#### Resource scope

- Resource group id: resource:90ec3f0a21a6cb62de65

#### Resource Data

- Grade Unit: % Li2O

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: The average mined grade of lithium remained consistent with the prior quarter.

Evidence · table

> 1.3

Context: Average Li2O grade mined

#### Tags used in scoring

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### Fact 8

[Link to this fact](https://atlas-aws.minestarters.com/news/pls-september-2026-quarterly-activities-report--c9971c86-dfa7-4840-98c2-5126805f45c2#fact-resource-facts-7)

Pilgangoora Operation · lithium

#### Identity

- Project: Pilgangoora Operation
- Commodity: lithium
- Ticker: PLS

#### Resource scope

- Resource group id: resource:90ec3f0a21a6cb62de65

#### Resource Data

- Grade Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: Lithia recovery saw a slight decrease compared to the prior quarter, though overall plant performance was strong.

- Negative factor: Lithia recovery slightly decreased from prior quarter

Evidence · table

> 74.7

Context: Lithia recovery

#### Tags used in scoring

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### Fact 9

[Link to this fact](https://atlas-aws.minestarters.com/news/pls-september-2026-quarterly-activities-report--c9971c86-dfa7-4840-98c2-5126805f45c2#fact-resource-facts-8)

Pilgangoora Operation · lithium

#### Identity

- Project: Pilgangoora Operation
- Commodity: lithium
- Ticker: PLS

#### Resource scope

- Resource group id: resource:90ec3f0a21a6cb62de65

#### Resource Data

- Grade Unit: A$/t

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: Unit operating costs decreased significantly due to operational efficiencies, positively impacting profitability, though future increases are anticipated.

- Positive factor: Unit operating cost decreased significantly

- Positive factor: Underpinned by operational efficiencies

- Negative factor: Unit costs expected to increase over remainder of FY27 due to seasonal impacts

Evidence · table

> 539

Context: Unit operating cost \(FOB\)

#### Tags used in scoring

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### Fact 10

[Link to this fact](https://atlas-aws.minestarters.com/news/pls-september-2026-quarterly-activities-report--c9971c86-dfa7-4840-98c2-5126805f45c2#fact-resource-facts-9)

Pilgangoora Operation

#### Identity

- Project: Pilgangoora Operation
- Ticker: PLS

#### Resource scope

- Resource group id: resource:90ec3f0a21a6cb62de65

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: The successful offering of US$700M senior unsecured notes significantly enhances the company's financial flexibility and strengthens its balance sheet to support major investment programs.

- Positive factor: Enhances financial flexibility

- Positive factor: Provides staged debt maturity profile

- Positive factor: Strengthens balance sheet for investment program

Evidence · text

> PLS completed an offering of US$700M 8% Senior Notes due 2032 \(the Notes\)

#### Tags used in scoring

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### Fact 11

[Link to this fact](https://atlas-aws.minestarters.com/news/pls-september-2026-quarterly-activities-report--c9971c86-dfa7-4840-98c2-5126805f45c2#fact-resource-facts-10)

P2000 Project

#### Identity

- Project: P2000 Project
- Ticker: PLS

#### Resource scope

- Resource group id: resource:bc76bcd75c469153e374

#### Resource Data

- Grade Unit: A$

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: The P2000 Feasibility Study indicates a substantial incremental post-tax NPV, highlighting the strong economic viability of the expansion project.

- Positive factor: Significant post-tax NPV for the P2000 Project

- Positive factor: Based on a reasonable long-term price assumption

Evidence · text

> The P2000 Project is expected to deliver an incremental post-tax NPV of A$2.7B21 \(8% real\)

#### Tags used in scoring

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### Fact 12

[Link to this fact](https://atlas-aws.minestarters.com/news/pls-september-2026-quarterly-activities-report--c9971c86-dfa7-4840-98c2-5126805f45c2#fact-resource-facts-11)

P2000 Project

#### Identity

- Project: P2000 Project
- Ticker: PLS

#### Resource scope

- Resource group id: resource:bc76bcd75c469153e374

#### Resource Data

- Grade Unit: %

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: The P2000 Feasibility Study shows a robust post-tax IRR, confirming the project's high profitability and attractiveness for investment.

- Positive factor: Strong post-tax IRR for the P2000 Project

- Positive factor: Indicates high profitability for the expansion

Evidence · text

> post-tax IRR of 29.5%, based on a long-term SC6 price assumption of US$1,620/t22

#### Tags used in scoring

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

### Fact 13

[Link to this fact](https://atlas-aws.minestarters.com/news/pls-september-2026-quarterly-activities-report--c9971c86-dfa7-4840-98c2-5126805f45c2#fact-resource-facts-12)

Pilgangoora Operation · electricity

#### Identity

- Project: Pilgangoora Operation
- Commodity: electricity
- Ticker: PLS

#### Resource scope

- Resource group id: resource:90ec3f0a21a6cb62de65

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-27T00:00:00.000Z

Reasoning: The 20-year power purchase agreement secures a significant amount of electricity, which is expected to reduce operating costs and emissions, while also providing capacity for future expansion.

- Positive factor: Long-term power supply secured

- Positive factor: Expected to lower operating costs

- Positive factor: Supports emissions intensity reduction targets

- Positive factor: Provides significant power capacity for future growth

Evidence · text

> PLS executed a 20 year power purchase agreement \(PPA\) with FMG Clean Energy Pty Ltd, a wholly owned subsidiary of Fortescue Ltd12 for the supply of a committed minimum of 325 GWh per annum of electricity to the Pilgangoora Operation

#### Tags used in scoring

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
