Perpetua finds gold, antimony near Stibnite pit

Original announcement by northernminer on

Company
Perpetua Resources
Ticker
PPTA
Exchange
Unavailable
Region
Idaho
Primary commodity
Gold
Secondary commodities
Antimony
Document categories
Drill results, Other
Extracted
2026-11-06 16:48:15 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Perpetua Resources has discovered gold and antimony mineralization at its Stibnite project in Idaho, specifically at the new Fiddle target and the Clark Tunnel fault zone. Notable intercepts include 109.7m at 3.2 g/t gold and 1.1% antimony in hole SB633. The discovery provides potential to expand the project's inventory near existing planned infrastructure.

Reasoning: Strong discovery results at a new target (Fiddle) and high-grade intercepts at Clark Tunnel, though true widths are not yet established.

Positive factors

  • Significant gold and antimony grades at new Fiddle target
  • Discovery hole SB633 shows broad, continuous mineralization
  • Step-out hole SB637 extends mineralization 110m north
  • High-grade gold intercepts at Clark Tunnel target

Negative factors

  • Apparent widths reported rather than true widths
  • Fiddle target not yet a defined mineral resource
  • Development subject to environmental review and permitting

Facts used in scoring: 6

Atlas analysis — Perpetua Resources: Perpetua finds gold, antimony near Stibnite pit. 3.2 g/t over 109.7 m; 4.5 g/t over 25.4 m; 2.3 g/t over 25 m

Classification and evidence

Apparent Width Onlynegative

Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.

Why it applies: The document explicitly states that reported intersections are drill lengths rather than established true widths.

Evidence · text

“The reported intersections are drill lengths rather than established true widths.”

Step-Out Extensionpositive

Mineralization extended beyond the previously known limit.

Why it applies: Hole SB637 extended mineralization 110 metres north of the discovery hole SB633.

Evidence · text

“Follow-up hole SB637 extended mineralization 110 metres north of the discovery hole”

Extracted facts

Stored fact records: 6. Some facts used in scoring do not have a stored record.

Drill Results (6)

SB633Stibnite · goldGrade: 3.2Grade Unit: g/tIntercept: 109.7 mView all details
Link to this fact

Identity

Hole ID
SB633
Project
Stibnite
Commodity
gold
Region
usa_id
Reported Region
usa_id
Ticker
PPTA

Geometry

Grade
3.2
Grade Unit
g/t
Intercept
109.7 m
From
189 m
To
298.7 m
Intercept Depth
189 m

Classification

Program
exploration
Sample Type
drill
Group ID
SB633:189-298.7
Mining Method
open_pit

Location

Location
Fiddle
Loc. Source
document

QA/QC

QA/QC Disclosed
Yes
QA/QC Methods
standards, blanks

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-11-06T00:00:00.000Z

Reasoning: High-grade discovery intercept at a new target.

Positive factors

  • Significant gold grade in discovery hole

Negative factors

  • Apparent width only

Evidence · text

“SB633 at the Fiddle target cut 109.7 metres grading 3.2 grams gold per tonne”

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

SB633Stibnite · antimonyGrade: 1.1Grade Unit: %Intercept: 109.7 mView all details
Link to this fact

Identity

Hole ID
SB633
Project
Stibnite
Commodity
antimony
Region
usa_id
Reported Region
usa_id
Ticker
PPTA

Geometry

Grade
1.1
Grade Unit
%
Intercept
109.7 m
From
189 m
To
298.7 m
Intercept Depth
189 m

Classification

Program
exploration
Sample Type
drill
Group ID
SB633:189-298.7
Mining Method
open_pit

Location

Location
Fiddle
Loc. Source
document

QA/QC

QA/QC Disclosed
Yes
QA/QC Methods
standards, blanks

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-11-06T00:00:00.000Z

Reasoning: Strong antimony grade in discovery hole.

Positive factors

  • Significant antimony grade accompanying gold

Negative factors

  • Apparent width only

Evidence · text

“109.7 metres grading 3.2 grams gold per tonne and 1.1% antimony”

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

SB637Stibnite · goldGrade: 0.7Grade Unit: g/tIntercept: 37.4 mView all details
Link to this fact

Identity

Hole ID
SB637
Project
Stibnite
Commodity
gold
Region
usa_id
Reported Region
usa_id
Ticker
PPTA

Geometry

Grade
0.7
Grade Unit
g/t
Intercept
37.4 m
From
93.8 m
To
131.2 m
Intercept Depth
93.8 m

Classification

Program
exploration
Sample Type
drill
Group ID
SB637:93.8-131.2
Mining Method
open_pit

Location

Location
Fiddle
Loc. Source
document

QA/QC

QA/QC Disclosed
Yes
QA/QC Methods
standards, blanks

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-11-06T00:00:00.000Z

Reasoning: Step-out hole confirming continuity of mineralization.

Positive factors

  • Extends mineralization 110m north

Evidence · text

“SB637 extended mineralization 110 metres north of the discovery hole, cutting 37.4 metres grading 0.7 gram gold”

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

SB637Stibnite · antimonyGrade: 0.1Grade Unit: %Intercept: 37.4 mView all details
Link to this fact

Identity

Hole ID
SB637
Project
Stibnite
Commodity
antimony
Region
usa_id
Reported Region
usa_id
Ticker
PPTA

Geometry

Grade
0.1
Grade Unit
%
Intercept
37.4 m
From
93.8 m
To
131.2 m
Intercept Depth
93.8 m

Classification

Program
exploration
Sample Type
drill
Group ID
SB637:93.8-131.2
Mining Method
open_pit

Location

Location
Fiddle
Loc. Source
document

QA/QC

QA/QC Disclosed
Yes
QA/QC Methods
standards, blanks

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-11-06T00:00:00.000Z

Reasoning: Lower grade antimony in step-out hole.

Positive factors

  • Confirms antimony presence in step-out

Evidence · text

“37.4 metres grading 0.7 gram gold and 0.1% antimony”

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

SB606Stibnite · goldGrade: 4.5Grade Unit: g/tIntercept: 25.4 mView all details
Link to this fact

Identity

Hole ID
SB606
Project
Stibnite
Commodity
gold
Region
usa_id
Reported Region
usa_id
Ticker
PPTA

Geometry

Grade
4.5
Grade Unit
g/t
Intercept
25.4 m
From
12.6 m
To
38 m
Intercept Depth
12.6 m

Classification

Program
exploration
Sample Type
drill
Group ID
SB606:12.6-38
Mining Method
open_pit

Location

Location
Clark Tunnel
Loc. Source
document

QA/QC

QA/QC Disclosed
Yes
QA/QC Methods
standards, blanks

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-11-06T00:00:00.000Z

Reasoning: Strong gold intercept at the Clark Tunnel target.

Positive factors

  • High-grade gold intercept

Negative factors

  • Apparent width only

Evidence · text

“drilling returned 25.4 metres grading 4.5 grams gold from 12.6 metres depth in hole SB606”

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

SB605Stibnite · goldGrade: 2.3Grade Unit: g/tIntercept: 25 mView all details
Link to this fact

Identity

Hole ID
SB605
Project
Stibnite
Commodity
gold
Region
usa_id
Reported Region
usa_id
Ticker
PPTA

Geometry

Grade
2.3
Grade Unit
g/t
Intercept
25 m
From
18 m
To
43 m
Intercept Depth
18 m

Classification

Program
exploration
Sample Type
drill
Group ID
SB605:18-43
Mining Method
open_pit

Location

Location
Clark Tunnel
Loc. Source
document

QA/QC

QA/QC Disclosed
Yes
QA/QC Methods
standards, blanks

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-11-06T00:00:00.000Z

Reasoning: Moderate gold intercept at Clark Tunnel.

Positive factors

  • Solid gold intercept

Negative factors

  • Apparent width only

Evidence · text

“25 metres at 2.3 grams from 18 metres depth in SB605”

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.