PDN: 2026 AGM Presentation

Original announcement by asx on

Company
Paladin Energy Ltd
Ticker
PDN
Exchange
ASX
Region
Unavailable
Primary commodity
Uranium
Secondary commodities
Vanadium, Gold
Document categories
Capital raise, Production, Resource update, Metallurgy
Extracted
2026-11-17 01:03:19 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Paladin Energy's AGM presentation showcases strong operational performance at the Langer Heinrich Mine, exceeding FY2026 guidance and delivering robust Q1 FY2027 results. The company successfully completed a A$525 million equity raising in November 2026 to advance its Patterson Lake South Project towards production by 2031, significantly de-risking its development pathway. Paladin also emphasized its multi-decade production pipeline and strategic position to capitalize on the growing global uranium supply deficit, supported by substantial mineral resources and reserves.

Reasoning: The AGM presentation highlights strong operational performance at the Langer Heinrich Mine, successful completion of a significant equity raise to fund the Patterson Lake South project, and a positive outlook for the uranium market, all contributing to a positive investment case and de-risking future growth.

Positive factors

  • Successful LHM ramp-up exceeding FY2026 guidance
  • Strong Q1 FY2027 sales price of US$79.4/lb
  • A$525M equity raise completed, de-risking PLS project development
  • Positive uranium market fundamentals supporting long-term growth
  • Significant Mineral Resource and Ore Reserve base for both LHM and PLS

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 34

Atlas analysis — Paladin Energy Ltd: PDN: 2026 AGM Presentation. measured 95000000 tonnes; 85% recovery

Classification and evidence

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: Mineral Resource and Ore Reserve estimates for LHM and PLS are reported as JORC Code (2012) compliant.

Evidence · text

“JORC Code (2012) compliant.”

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: The Langer Heinrich Mine has a Measured Uranium Resource of 95.0 Mt at 410 ppm U3O8.

Evidence · table

“Total Measured 95.0 410 85.9”

Context: Summary Mineral Resources1 As at 30 June 2026

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The Langer Heinrich Mine has an Indicated Uranium Resource of 23.1 Mt at 375 ppm U3O8, and the PLS Project has an Indicated Uranium Resource of 2.9 Mt at 1.88% U3O8.

Evidence · table

“Indicated In-situ 23.1 375 19.1”

Context: Summary Mineral Resources1 As at 30 June 2026

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The Langer Heinrich Mine has an Inferred Uranium Resource of 11.0 Mt at 347 ppm U3O8, and the PLS Project has an Inferred Uranium Resource of 0.4 Mt at 1.19% U3O8.

Evidence · table

“Inferred In-situ 11.0 347 8.4”

Context: Summary Mineral Resources1 As at 30 June 2026

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The Langer Heinrich Mine has Proven Uranium Reserves of 39.2 Mt at 490 ppm U3O8 (in-situ) and 24.7 Mt at 326 ppm U3O8 (stockpiles).

Evidence · table

“Proved In-situ 39.2 490 42.4”

Context: Summary Ore Reserves1 As at 30 June 2026

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The Langer Heinrich Mine has Probable Uranium Reserves of 10.4 Mt at 451 ppm U3O8, and the PLS Project has Probable Uranium Reserves totaling 3.0 Mt at 1.41% U3O8.

Evidence · table

“Probable In-situ 10.4 451 10.3”

Context: Summary Ore Reserves1 As at 30 June 2026

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The presentation includes summary tables for Mineral Resources and Ore Reserves for both the Langer Heinrich Mine and the PLS Project, effective 30 June 2026.

Evidence · text

“Mineral Resources and Ore/Mineral Reserves Estimates”

equity_raise_completedpositive · Story-specific tag

No canonical definition is currently available.

Why it applies: The company announced the completion of an A$525M equity raising in November 2026.

Evidence · text

“Nov 2026 A$525M equity raising completed”

strong_production_resultspositive · Story-specific tag

No canonical definition is currently available.

Why it applies: LHM achieved or exceeded FY2026 guidance for production (4.82Mlb U3O8 produced) and sales (4.35Mlb U3O8 sold), and was below guidance for cost of production (US$43.3/lb).

Evidence · text

“LHM achieved or exceeded FY2026 guidance”

production_guidance_providedneutral · Story-specific tag

No canonical definition is currently available.

Why it applies: The company provided FY2027 guidance for U3O8 Produced (5.1 – 5.6 Mlb) and U3O8 Sold (4.8 – 5.3 Mlb).

Evidence · text

“LHM FY2027 Guidance1 U3O8 Produced4 Mlb 5.1 – 5.6 U3O8 Sold5 Mlb 4.8 – 5.3”

cost_guidance_providedneutral · Story-specific tag

No canonical definition is currently available.

Why it applies: The company provided FY2027 guidance for Cost of Production (US$44 – 48/lb) and Capital Expenditure (US$29 – 35M).

Evidence · text

“Cost of Production6 US$/lb 44 – 48 Capital Expenditure7 US$ 29 – 35”

Extracted facts

Stored fact records: 21. Some facts used in scoring do not have a stored record.

Resource Estimates (20)

measuredLanger Heinrich Mine · uraniumTonnes: 95000000Grade: 410Grade Unit: ppm U3O8Contained Metal: 85.9Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Langer Heinrich Mine
Commodity
uranium
Region
namibia
Reported Region
Namibia
Ticker
PDN

Resource scope

Estimate type
resource
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:717b39212928ca3e908d

Resource Data

Category
measured
Tonnes
95000000
Grade
410
Grade Unit
ppm U3O8
Contained Metal
85.9
Contained Unit
mlb u3o8
Cutoff Grade
200
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The Measured Uranium Resource at LHM is substantial and reported under JORC, providing a high level of confidence in the resource base.

Positive factors

  • High confidence category (Measured)
  • Significant contained metal (85.9 Mlb U3O8)
  • JORC Code (2012) compliant

Evidence · table

“85.9”

Context: 95.0

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

measuredLanger Heinrich Mine · vanadiumTonnes: 95000000Grade: 133Grade Unit: ppm V2O5Contained Metal: 27.8Contained Unit: mlb v2o5View all details
Link to this fact

Identity

Project
Langer Heinrich Mine
Commodity
vanadium
Region
namibia
Reported Region
Namibia
Ticker
PDN

Resource scope

Estimate type
resource
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:717b39212928ca3e908d

Resource Data

Category
measured
Tonnes
95000000
Grade
133
Grade Unit
ppm V2O5
Contained Metal
27.8
Contained Unit
mlb v2o5
Cutoff Grade
200
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The Measured Vanadium Resource at LHM represents a significant byproduct potential, reported under JORC standards.

Positive factors

  • Significant contained vanadium (27.8 Mlb V2O5)
  • JORC Code (2012) compliant

Evidence · table

“27.8”

Context: 95.0

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedLanger Heinrich Mine · uraniumTonnes: 23100000Grade: 375Grade Unit: ppm U3O8Contained Metal: 19.1Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Langer Heinrich Mine
Commodity
uranium
Region
namibia
Reported Region
Namibia
Ticker
PDN

Resource scope

Estimate type
resource
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:52c1517458e826a6f092

Resource Data

Category
indicated
Tonnes
23100000
Grade
375
Grade Unit
ppm U3O8
Contained Metal
19.1
Contained Unit
mlb u3o8
Cutoff Grade
200
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The Indicated Uranium Resource at LHM adds to the overall resource base with good geological confidence.

Positive factors

  • Good confidence category (Indicated)
  • Significant contained metal (19.1 Mlb U3O8)
  • JORC Code (2012) compliant

Evidence · table

“19.1”

Context: 23.1

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedLanger Heinrich Mine · vanadiumTonnes: 23100000Grade: 122Grade Unit: ppm V2O5Contained Metal: 6.2Contained Unit: mlb v2o5View all details
Link to this fact

Identity

Project
Langer Heinrich Mine
Commodity
vanadium
Region
namibia
Reported Region
Namibia
Ticker
PDN

Resource scope

Estimate type
resource
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:52c1517458e826a6f092

Resource Data

Category
indicated
Tonnes
23100000
Grade
122
Grade Unit
ppm V2O5
Contained Metal
6.2
Contained Unit
mlb v2o5
Cutoff Grade
200
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The Indicated Vanadium Resource at LHM further contributes to the byproduct potential.

Positive factors

  • Contained vanadium (6.2 Mlb V2O5)
  • JORC Code (2012) compliant

Evidence · table

“6.2”

Context: 23.1

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredLanger Heinrich Mine · uraniumTonnes: 11000000Grade: 347Grade Unit: ppm U3O8Contained Metal: 8.4Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Langer Heinrich Mine
Commodity
uranium
Region
namibia
Reported Region
Namibia
Ticker
PDN

Resource scope

Estimate type
resource
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:87e8f481035c53ccf236

Resource Data

Category
inferred
Tonnes
11000000
Grade
347
Grade Unit
ppm U3O8
Contained Metal
8.4
Contained Unit
mlb u3o8
Cutoff Grade
200
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The Inferred Uranium Resource at LHM provides additional potential but with lower geological confidence.

Positive factors

  • Adds to overall resource base
  • JORC Code (2012) compliant

Negative factors

  • Lower confidence category (Inferred)

Evidence · table

“8.4”

Context: 11.0

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredLanger Heinrich Mine · vanadiumTonnes: 11000000Grade: 112Grade Unit: ppm V2O5Contained Metal: 2.7Contained Unit: mlb v2o5View all details
Link to this fact

Identity

Project
Langer Heinrich Mine
Commodity
vanadium
Region
namibia
Reported Region
Namibia
Ticker
PDN

Resource scope

Estimate type
resource
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:87e8f481035c53ccf236

Resource Data

Category
inferred
Tonnes
11000000
Grade
112
Grade Unit
ppm V2O5
Contained Metal
2.7
Contained Unit
mlb v2o5
Cutoff Grade
200
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The Inferred Vanadium Resource at LHM provides additional byproduct potential with lower confidence.

Positive factors

  • Adds to byproduct potential
  • JORC Code (2012) compliant

Negative factors

  • Lower confidence category (Inferred)

Evidence · table

“2.7”

Context: 11.0

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

provenLanger Heinrich Mine · uraniumTonnes: 39200000Grade: 490Grade Unit: ppm U3O8Contained Metal: 42.4Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Langer Heinrich Mine
Commodity
uranium
Region
namibia
Reported Region
Namibia
Ticker
PDN

Resource scope

Estimate type
reserve
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:a61d0dbc1007d3a83554
Material type
In-situ

Resource Data

Category
proven
Tonnes
39200000
Grade
490
Grade Unit
ppm U3O8
Contained Metal
42.4
Contained Unit
mlb u3o8
Cutoff Grade
250
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The Proven Uranium Reserve at LHM represents a high-confidence, economically extractable portion of the resource.

Positive factors

  • Highest confidence category (Proven)
  • Significant contained metal (42.4 Mlb U3O8)
  • JORC Code (2012) compliant

Evidence · table

“42.4”

Context: 39.2

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

probableLanger Heinrich Mine · uraniumTonnes: 10400000Grade: 451Grade Unit: ppm U3O8Contained Metal: 10.3Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Langer Heinrich Mine
Commodity
uranium
Region
namibia
Reported Region
Namibia
Ticker
PDN

Resource scope

Estimate type
reserve
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:084d0818b2b60593faa5
Material type
In-situ

Resource Data

Category
probable
Tonnes
10400000
Grade
451
Grade Unit
ppm U3O8
Contained Metal
10.3
Contained Unit
mlb u3o8
Cutoff Grade
250
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The Probable Uranium Reserve at LHM adds to the economically extractable portion of the resource.

Positive factors

  • Good confidence category (Probable)
  • Significant contained metal (10.3 Mlb U3O8)
  • JORC Code (2012) compliant

Evidence · table

“10.3”

Context: 10.4

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

provenLanger Heinrich Mine · uraniumTonnes: 24700000Grade: 326Grade Unit: ppm U3O8Contained Metal: 17.7Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Langer Heinrich Mine
Commodity
uranium
Region
namibia
Reported Region
Namibia
Ticker
PDN

Resource scope

Estimate type
reserve
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:8f046cdf6448e464e39c
Material type
stockpile

Resource Data

Category
proven
Tonnes
24700000
Grade
326
Grade Unit
ppm U3O8
Contained Metal
17.7
Contained Unit
mlb u3o8
Cutoff Grade
250
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Proven Reserves from stockpiles provide a readily available and high-confidence source of uranium.

Positive factors

  • High confidence category (Proven)
  • Significant contained metal from stockpiles (17.7 Mlb U3O8)
  • JORC Code (2012) compliant

Evidence · table

“17.7”

Context: 24.7

Tags used in scoring

Proven Reservepositive

Measured Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "proven"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Fact 10Langer Heinrich Mine · uraniumTonnes: 74300000Grade: 430Grade Unit: ppm U3O8Contained Metal: 70.4Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Langer Heinrich Mine
Commodity
uranium
Region
namibia
Reported Region
Namibia
Ticker
PDN

Resource scope

Estimate type
reserve
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:d87b7f3706e5a1020a95

Resource Data

Tonnes
74300000
Grade
430
Grade Unit
ppm U3O8
Contained Metal
70.4
Contained Unit
mlb u3o8
Cutoff Grade
250
Cutoff Unit
ppm U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The total Ore Reserve at LHM is very substantial, underpinning a long-life operation with high confidence.

Positive factors

  • Very large total Ore Reserve (70.4 Mlb U3O8)
  • JORC Code (2012) compliant
  • Provides long-life operation potential

Evidence · table

“70.4”

Context: 74.3

Tags used in scoring

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedPatterson Lake South Project · uraniumTonnes: 2900000Grade: 1.88Grade Unit: % U3O8Contained Metal: 118.8Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Patterson Lake South Project
Commodity
uranium
Region
canada
Reported Region
Canada
Ticker
PDN

Resource scope

Estimate type
resource
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:612983d2b2a57c5a8134
Deposit or zone
Triple R

Resource Data

Category
indicated
Tonnes
2900000
Grade
1.88
Grade Unit
% U3O8
Contained Metal
118.8
Contained Unit
mlb u3o8
Cutoff Grade
0.25
Cutoff Unit
% U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The Indicated Uranium Resource at Triple R is a high-grade, substantial resource, providing strong backing for the PLS project.

Positive factors

  • High-grade resource (1.88% U3O8)
  • Significant contained metal (118.8 Mlb U3O8)
  • Good confidence category (Indicated)
  • JORC Code (2012) compliant

Evidence · table

“118.8”

Context: 2.9

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedPatterson Lake South Project · goldTonnes: 2900000Grade: 0.59Grade Unit: g/tContained Metal: 54.4Contained Unit: koz auView all details
Link to this fact

Identity

Project
Patterson Lake South Project
Commodity
gold
Region
canada
Reported Region
Canada
Ticker
PDN

Resource scope

Estimate type
resource
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:612983d2b2a57c5a8134
Deposit or zone
Triple R

Resource Data

Category
indicated
Tonnes
2900000
Grade
0.59
Grade Unit
g/t
Contained Metal
54.4
Contained Unit
koz au
Cutoff Grade
0.25
Cutoff Unit
% U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The Indicated Gold Resource at Triple R represents a valuable byproduct potential for the PLS project.

Positive factors

  • Significant contained gold (54.4 Koz Au)
  • JORC Code (2012) compliant

Evidence · table

“54.4”

Context: 2.9

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredPatterson Lake South Project · uraniumTonnes: 400000Grade: 1.19Grade Unit: % U3O8Contained Metal: 10.9Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Patterson Lake South Project
Commodity
uranium
Region
canada
Reported Region
Canada
Ticker
PDN

Resource scope

Estimate type
resource
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:d4893e646c8c992b4b0f
Deposit or zone
Triple R

Resource Data

Category
inferred
Tonnes
400000
Grade
1.19
Grade Unit
% U3O8
Contained Metal
10.9
Contained Unit
mlb u3o8
Cutoff Grade
0.25
Cutoff Unit
% U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The Inferred Uranium Resource at Triple R provides additional high-grade potential with lower geological confidence.

Positive factors

  • High-grade resource (1.19% U3O8)
  • Adds to overall resource base
  • JORC Code (2012) compliant

Negative factors

  • Lower confidence category (Inferred)

Evidence · table

“10.9”

Context: 0.4

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredPatterson Lake South Project · goldTonnes: 400000Grade: 0.46Grade Unit: g/tContained Metal: 6.1Contained Unit: koz auView all details
Link to this fact

Identity

Project
Patterson Lake South Project
Commodity
gold
Region
canada
Reported Region
Canada
Ticker
PDN

Resource scope

Estimate type
resource
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:d4893e646c8c992b4b0f
Deposit or zone
Triple R

Resource Data

Category
inferred
Tonnes
400000
Grade
0.46
Grade Unit
g/t
Contained Metal
6.1
Contained Unit
koz au
Cutoff Grade
0.25
Cutoff Unit
% U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The Inferred Gold Resource at Triple R provides additional byproduct potential with lower confidence.

Positive factors

  • Adds to byproduct potential
  • JORC Code (2012) compliant

Negative factors

  • Lower confidence category (Inferred)

Evidence · table

“6.1”

Context: 0.4

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Triple RPatterson Lake South Project · uraniumTonnes: 3300000Grade: 1.79Grade Unit: % U3O8Contained Metal: 129.7Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Patterson Lake South Project
Commodity
uranium
Region
canada
Reported Region
Canada
Ticker
PDN

Resource scope

Estimate type
resource
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:9cb497cd7e94c2481bec
Deposit or zone
Triple R

Resource Data

Tonnes
3300000
Grade
1.79
Grade Unit
% U3O8
Contained Metal
129.7
Contained Unit
mlb u3o8
Cutoff Grade
0.25
Cutoff Unit
% U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The total Uranium Resource at Triple R is very substantial and high-grade, forming a strong foundation for the PLS project.

Positive factors

  • Very large total resource (129.7 Mlb U3O8)
  • High average grade (1.79% U3O8)
  • JORC Code (2012) compliant

Evidence · table

“129.7”

Context: 3.3

Tags used in scoring

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Triple RPatterson Lake South Project · goldTonnes: 3300000Grade: 0.57Grade Unit: g/tContained Metal: 60.6Contained Unit: koz auView all details
Link to this fact

Identity

Project
Patterson Lake South Project
Commodity
gold
Region
canada
Reported Region
Canada
Ticker
PDN

Resource scope

Estimate type
resource
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:9cb497cd7e94c2481bec
Deposit or zone
Triple R

Resource Data

Tonnes
3300000
Grade
0.57
Grade Unit
g/t
Contained Metal
60.6
Contained Unit
koz au
Cutoff Grade
0.25
Cutoff Unit
% U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The total Gold Resource at Triple R provides substantial byproduct potential for the PLS project.

Positive factors

  • Significant total contained gold (60.6 Koz Au)
  • JORC Code (2012) compliant

Evidence · table

“60.6”

Context: 3.3

Tags used in scoring

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

probablePatterson Lake South Project · uraniumTonnes: 2600000Grade: 1.46Grade Unit: % U3O8Contained Metal: 84.8Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Patterson Lake South Project
Commodity
uranium
Region
canada
Reported Region
Canada
Ticker
PDN

Resource scope

Estimate type
reserve
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:4b751ba49a6acac5461d
Deposit or zone
R780E Zone

Resource Data

Category
probable
Tonnes
2600000
Grade
1.46
Grade Unit
% U3O8
Contained Metal
84.8
Contained Unit
mlb u3o8
Cutoff Grade
0.25
Cutoff Unit
% U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The Probable Uranium Reserve at R780E Zone is a high-grade, substantial reserve, contributing significantly to the PLS project's economic viability.

Positive factors

  • High-grade reserve (1.46% U3O8)
  • Significant contained metal (84.8 Mlb U3O8)
  • Good confidence category (Probable)
  • JORC Code (2012) compliant

Evidence · table

“84.8”

Context: 2.6

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

probablePatterson Lake South Project · uraniumTonnes: 100000Grade: 1.24Grade Unit: % U3O8Contained Metal: 1.5Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Patterson Lake South Project
Commodity
uranium
Region
canada
Reported Region
Canada
Ticker
PDN

Resource scope

Estimate type
reserve
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:038efff8188dae6284c7
Deposit or zone
R00E Zone

Resource Data

Category
probable
Tonnes
100000
Grade
1.24
Grade Unit
% U3O8
Contained Metal
1.5
Contained Unit
mlb u3o8
Cutoff Grade
0.25
Cutoff Unit
% U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The Probable Uranium Reserve at R00E Zone adds to the economically extractable portion of the PLS project.

Positive factors

  • High-grade reserve (1.24% U3O8)
  • JORC Code (2012) compliant

Evidence · table

“1.5”

Context: 0.1

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

probablePatterson Lake South Project · uraniumTonnes: 300000Grade: 1.04Grade Unit: % U3O8Contained Metal: 7.4Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Patterson Lake South Project
Commodity
uranium
Region
canada
Reported Region
Canada
Ticker
PDN

Resource scope

Estimate type
reserve
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:cd67ce31651eaa8b84d9
Deposit or zone
R840W Zone

Resource Data

Category
probable
Tonnes
300000
Grade
1.04
Grade Unit
% U3O8
Contained Metal
7.4
Contained Unit
mlb u3o8
Cutoff Grade
0.25
Cutoff Unit
% U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The Probable Uranium Reserve at R840W Zone further contributes to the economically extractable portion of the PLS project.

Positive factors

  • High-grade reserve (1.04% U3O8)
  • JORC Code (2012) compliant

Evidence · table

“7.4”

Context: 0.3

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Fact 20Patterson Lake South Project · uraniumTonnes: 3000000Grade: 1.41Grade Unit: % U3O8Contained Metal: 93.7Contained Unit: mlb u3o8View all details
Link to this fact

Identity

Project
Patterson Lake South Project
Commodity
uranium
Region
canada
Reported Region
Canada
Ticker
PDN

Resource scope

Estimate type
reserve
Effective date
2026-06-30T00:00:00.000Z
Reporting standards
jorc
Resource group id
resource:6b3dc13230d61831cbed

Resource Data

Tonnes
3000000
Grade
1.41
Grade Unit
% U3O8
Contained Metal
93.7
Contained Unit
mlb u3o8
Cutoff Grade
0.25
Cutoff Unit
% U3O8

Prior Estimate

Resource Date
2026-06-30

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The total Ore Reserve at PLS is very substantial and high-grade, underpinning the project's strong economic potential.

Positive factors

  • Very large total Ore Reserve (93.7 Mlb U3O8)
  • High average grade (1.41% U3O8)
  • JORC Code (2012) compliant

Evidence · table

“93.7”

Context: 3.0

Tags used in scoring

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

Metallurgical Results (1)

Fact 1Langer Heinrich Mine · uraniumRecovery: 85 %View all details
Link to this fact

Identity

Project
Langer Heinrich Mine
Commodity
uranium
Region
namibia
Reported Region
Namibia
Ticker
PDN

Recovery

Recovery
85 %

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The recovery rate for Q1 FY2027 was at the lower end of the target range, affected by maintenance and ore characteristics.

Negative factors

  • At the bottom-end of the target range (85% to 90%)
  • Impacted by planned maintenance and ore characteristics

Evidence · table

“85”

Context: 1.17

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.