ORE: Updated Life-of-Mine Plan (PEA), Casa Berardi Mine

Original announcement by asx on

Company
Orezone Gold Corporation
Ticker
ORE
Exchange
ASX
Region
Quebec, Canada
Primary commodity
Gold
Secondary commodities
None reported
Document categories
Other, Resource update, Metallurgy
Extracted
2026-11-01 23:09:15 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Orezone Gold Corporation has released an updated Preliminary Economic Assessment (PEA) for its Casa Berardi Mine in Quebec, Canada, outlining a 14-year life-of-mine plan with total gold production of 1.63 million ounces. The PEA projects an after-tax NPV5% of $1.05 billion and average annual gold production of 116,000 ounces at an AISC of $1,877 per ounce. The study is based on an NI 43-101 compliant Mineral Resource Estimate, which shows minor increases in Measured and Indicated categories compared to the prior estimate.

Reasoning: The updated PEA outlines a robust economic case for the Casa Berardi Mine with a significant NPV and long mine life, supported by an NI 43-101 compliant resource estimate, despite the preliminary nature of the study and the inclusion of inferred resources. The resource update itself shows only marginal changes from the prior estimate.

Positive factors

  • Strong after-tax NPV5% of $1.05 billion at base case gold prices.
  • Long life-of-mine (LOM) of 14 years with significant total gold production of 1.63 million ounces.
  • NI 43-101 compliant Preliminary Economic Assessment (PEA) and Mineral Resource Estimate.
  • Resource remains open for expansion on multiple fronts, including at depth and new zones.
  • QP signed off on the technical report.

Negative factors

  • PEA is preliminary in nature and includes Inferred Mineral Resources, which are considered speculative.
  • Very minor increase in Measured & Indicated contained metal (0.32%) and tonnage (0.15%) compared to prior estimate, suggesting limited resource growth in this update.
  • Mine laboratory is not independent and not ISO certified for assaying.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 29

Atlas analysis — Orezone Gold Corporation: ORE: Updated Life-of-Mine Plan (PEA), Casa Berardi Mine. measured 3157000 tonnes; 84% recovery

Classification and evidence

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: The report explicitly states it is an 'NI 43-101 Technical Report, Preliminary Economic Assessment' and was prepared in accordance with NI 43-101 standards.

Evidence · text

“This Report has been prepared in accordance with the requirements of National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”)”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The report lists Rob Henderson, P.Eng. and Alexandre Nickerson, P.Eng. as Qualified Persons responsible for the report.

Evidence · text

“QPs: Rob Henderson, P.Eng. Alexandre Nickerson, P.Eng.”

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: The document is explicitly an 'Updated Life-of-Mine Plan (PEA)' and 'Preliminary Economic Assessment'.

Evidence · text

“Updated Life-of-Mine Plan, Casa Berardi Mine, Northwestern Quebec, Canada NI 43-101 Technical Report, Preliminary Economic Assessment”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The PEA explicitly includes Inferred Mineral Resources, which are considered speculative.

Evidence · text

“The PEA is preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is no certainty that the PEA will be realized.”

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The document presents an 'Updated Life-of-Mine Plan' and a 'Mineral Resource estimate' with an effective date of June 30, 2026.

Evidence · text

“This Report presents a Mineral Resource estimate supporting a Casa Berardi life-of-mine plan (“LOM Plan”) to 2040”

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The document explicitly states the cut-off grades used for both open pit and underground mineral resources.

Evidence · table

“0.63 g/t and 0.82 g/t Au”

Context: Open pit Mineral Resources are reported within conceptual pit shells at cut-off grades varying between 0.63 g/t and 0.82 g/t Au.

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: The processing facility uses a conventional single stage primary crusher followed by a two-stage SAG and ball mill grinding circuit, gravity circuit, and CIL circuit.

Evidence · text

“Run-of-mine material is processed using a conventional single stage primary crusher followed by a two-stage SAG and ball mill grinding circuit, gravity circuit, and CIL circuit, producing gold doré.”

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: The processing facility includes a gravity recovery circuit.

Evidence · text

“Key unit operations include conventional jaw crushing, SAG and ball mill grinding, gravity gold recovery, CIL leaching, cyanide destruction, carbon elution and regeneration, electrowinning and smelting to produce gold doré bars.”

Heap Leach Routeneutral

Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.

Why it applies: The document mentions in-pit tailings deposition in exhausted F134 and F160 pits, which is a form of heap leach or similar disposal.

Evidence · text

“The current TSF design will support tailings deposition until 2031, after which the exhausted F134 and F160 pits will be utilized for in-pit tailings deposition.”

Bench Scale Onlynegative

Only preliminary bench tests completed — no locked-cycle or pilot work.

Why it applies: The mine laboratory, used for assaying, is not independent and not ISO certified, which is a negative signal for the quality of the test work.

Evidence · text

“The mine laboratory is not independent and is not ISO certified.”

Extracted facts

Stored fact records: 22. Some facts used in scoring do not have a stored record.

Resource Estimates (20)

measuredCasa Berardi Mine · goldTonnes: 3157000Grade: 4.7Grade Unit: g/tContained Metal: 477Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:8f0ef0427126da1720da
Deposit or zone
West Mine
Mining method
combined

Resource Data

Category
measured
Tonnes
3157000
Grade
4.7
Grade Unit
g/t
Contained Metal
477
Contained Unit
koz
Cutoff Grade
2.7
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
24700000
Prior Grade
3.18
Prior Contained Metal
2520

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The Measured resource for the West Mine underground shows good grade and high confidence, contributing positively to the project, though the update itself is not highly novel.

Positive factors

  • High confidence Measured category.
  • Good grade for underground mining.

Negative factors

  • Very minor change from prior estimate.

Evidence · table

“3,157”

Context: West Mine

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 3157000 against 24700000 previously

Grade Improvementpositive

Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: 4.7 against 3.18 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 477 against 2520 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedCasa Berardi Mine · goldTonnes: 3456000Grade: 4.49Grade Unit: g/tContained Metal: 499Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:f179b17bfa34c7e2bd3e
Deposit or zone
West Mine
Mining method
combined

Resource Data

Category
indicated
Tonnes
3456000
Grade
4.49
Grade Unit
g/t
Contained Metal
499
Contained Unit
koz
Cutoff Grade
2.7
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
24700000
Prior Grade
3.18
Prior Contained Metal
2520

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The Indicated resource for the West Mine underground shows good grade and reasonable confidence, contributing positively to the project, though the update itself is not highly novel.

Positive factors

  • Good grade for underground mining.
  • Reasonable geological confidence (Indicated category).

Negative factors

  • Very minor change from prior estimate.

Evidence · table

“3,456”

Context: West Mine

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 3456000 against 24700000 previously

Grade Improvementpositive

Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: 4.49 against 3.18 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 499 against 2520 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredCasa Berardi Mine · goldTonnes: 1185000Grade: 6.17Grade Unit: g/tContained Metal: 235Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:6413427c6889649d14f3
Deposit or zone
West Mine
Mining method
combined

Resource Data

Category
inferred
Tonnes
1185000
Grade
6.17
Grade Unit
g/t
Contained Metal
235
Contained Unit
koz
Cutoff Grade
2.7
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
2800000
Prior Grade
4.37
Prior Contained Metal
395

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The Inferred resource for the West Mine underground shows high grade but lower confidence, contributing to the project's potential but with geological speculation.

Positive factors

  • High grade for underground mining.

Negative factors

  • Lower confidence Inferred category.
  • Very minor change from prior estimate.

Evidence · table

“1,185”

Context: West Mine

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 1185000 against 2800000 previously

Grade Improvementpositive

Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: 6.17 against 4.37 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 235 against 395 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredCasa Berardi Mine · goldTonnes: 283000Grade: 9.01Grade Unit: g/tContained Metal: 82Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:feabfd33ad6f326618e3
Deposit or zone
East Mine
Mining method
combined

Resource Data

Category
measured
Tonnes
283000
Grade
9.01
Grade Unit
g/t
Contained Metal
82
Contained Unit
koz
Cutoff Grade
2.7
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
24700000
Prior Grade
3.18
Prior Contained Metal
2520

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The Measured resource for the East Mine underground shows very high grade and high confidence, significantly contributing to the project's value, though the update itself is not highly novel.

Positive factors

  • Very high grade for underground mining.
  • High confidence Measured category.

Negative factors

  • Very minor change from prior estimate.

Evidence · table

“283”

Context: East Mine

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 283000 against 24700000 previously

Grade Improvementpositive

Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: 9.01 against 3.18 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 82 against 2520 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedCasa Berardi Mine · goldTonnes: 429000Grade: 5.51Grade Unit: g/tContained Metal: 76Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:c32dbcd9e0c09be984c0
Deposit or zone
East Mine
Mining method
combined

Resource Data

Category
indicated
Tonnes
429000
Grade
5.51
Grade Unit
g/t
Contained Metal
76
Contained Unit
koz
Cutoff Grade
2.7
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
24700000
Prior Grade
3.18
Prior Contained Metal
2520

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The Indicated resource for the East Mine underground shows high grade and reasonable confidence, contributing positively to the project, though the update itself is not highly novel.

Positive factors

  • High grade for underground mining.
  • Reasonable geological confidence (Indicated category).

Negative factors

  • Very minor change from prior estimate.

Evidence · table

“429”

Context: East Mine

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 429000 against 24700000 previously

Grade Improvementpositive

Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: 5.51 against 3.18 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 76 against 2520 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredCasa Berardi Mine · goldTonnes: 488000Grade: 4.97Grade Unit: g/tContained Metal: 78Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:e24b0c5f0b961d18d4c8
Deposit or zone
East Mine
Mining method
combined

Resource Data

Category
inferred
Tonnes
488000
Grade
4.97
Grade Unit
g/t
Contained Metal
78
Contained Unit
koz
Cutoff Grade
2.7
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
2800000
Prior Grade
4.37
Prior Contained Metal
395

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The Inferred resource for the East Mine underground shows good grade but lower confidence, contributing to the project's potential but with geological speculation.

Positive factors

  • Good grade for underground mining.

Negative factors

  • Lower confidence Inferred category.
  • Very minor change from prior estimate.

Evidence · table

“488”

Context: East Mine

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 488000 against 2800000 previously

Grade Improvementpositive

Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: 4.97 against 4.37 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 78 against 395 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredCasa Berardi Mine · goldTonnes: 2465000Grade: 2.08Grade Unit: g/tContained Metal: 165Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:b48070ec984bd5517b8b
Deposit or zone
F160
Mining method
combined

Resource Data

Category
measured
Tonnes
2465000
Grade
2.08
Grade Unit
g/t
Contained Metal
165
Contained Unit
koz
Cutoff Grade
0.63
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
24700000
Prior Grade
3.18
Prior Contained Metal
2520

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The Measured resource for the F160 open pit shows good grade and high confidence, contributing positively to the project, though the update itself is not highly novel.

Positive factors

  • Good grade for open pit mining.
  • High confidence Measured category.

Negative factors

  • Very minor change from prior estimate.

Evidence · table

“2,465”

Context: F160

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 2465000 against 24700000 previously

Grade Declinenegative

Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.

Why it applies: 2.08 against 3.18 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 165 against 2520 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedCasa Berardi Mine · goldTonnes: 1205000Grade: 1.99Grade Unit: g/tContained Metal: 77Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:76725a62fdf95050e199
Deposit or zone
F160
Mining method
combined

Resource Data

Category
indicated
Tonnes
1205000
Grade
1.99
Grade Unit
g/t
Contained Metal
77
Contained Unit
koz
Cutoff Grade
0.63
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
24700000
Prior Grade
3.18
Prior Contained Metal
2520

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The Indicated resource for the F160 open pit shows good grade and reasonable confidence, contributing positively to the project, though the update itself is not highly novel.

Positive factors

  • Good grade for open pit mining.
  • Reasonable geological confidence (Indicated category).

Negative factors

  • Very minor change from prior estimate.

Evidence · table

“1,205”

Context: F160

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 1205000 against 24700000 previously

Grade Declinenegative

Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.

Why it applies: 1.99 against 3.18 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 77 against 2520 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredCasa Berardi Mine · goldTonnes: 1000Grade: 1.33Grade Unit: g/tContained Metal: 0Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:5fdfaa3b5986be515e13
Deposit or zone
F160
Mining method
combined

Resource Data

Category
inferred
Tonnes
1000
Grade
1.33
Grade Unit
g/t
Contained Metal
0
Contained Unit
koz
Cutoff Grade
0.63
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
2800000
Prior Grade
4.37
Prior Contained Metal
395

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The Inferred resource for the F160 open pit is very small and in a lower confidence category, contributing minimally to the project's overall value.

Negative factors

  • Very small tonnage and contained metal.
  • Lower confidence Inferred category.
  • Very minor change from prior estimate.

Evidence · table

“1”

Context: F160

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 1000 against 2800000 previously

Grade Declinenegative

Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.

Why it applies: 1.33 against 4.37 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 0 against 395 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredCasa Berardi Mine · goldTonnes: 282000Grade: 2.31Grade Unit: g/tContained Metal: 21Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:5c9c70befd93b436476d
Deposit or zone
F134
Mining method
combined

Resource Data

Category
measured
Tonnes
282000
Grade
2.31
Grade Unit
g/t
Contained Metal
21
Contained Unit
koz
Cutoff Grade
0.63
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
24700000
Prior Grade
3.18
Prior Contained Metal
2520

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The Measured resource for the F134 open pit shows good grade and high confidence, contributing positively to the project, though the update itself is not highly novel.

Positive factors

  • Good grade for open pit mining.
  • High confidence Measured category.

Negative factors

  • Very minor change from prior estimate.

Evidence · table

“282”

Context: F134

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 282000 against 24700000 previously

Grade Declinenegative

Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.

Why it applies: 2.31 against 3.18 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 21 against 2520 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedCasa Berardi Mine · goldTonnes: 455000Grade: 1.89Grade Unit: g/tContained Metal: 28Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:4735d975938568427d9a
Deposit or zone
F134
Mining method
combined

Resource Data

Category
indicated
Tonnes
455000
Grade
1.89
Grade Unit
g/t
Contained Metal
28
Contained Unit
koz
Cutoff Grade
0.63
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
24700000
Prior Grade
3.18
Prior Contained Metal
2520

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The Indicated resource for the F134 open pit shows good grade and reasonable confidence, contributing positively to the project, though the update itself is not highly novel.

Positive factors

  • Good grade for open pit mining.
  • Reasonable geological confidence (Indicated category).

Negative factors

  • Very minor change from prior estimate.

Evidence · table

“455”

Context: F134

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 455000 against 24700000 previously

Grade Declinenegative

Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.

Why it applies: 1.89 against 3.18 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 28 against 2520 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredCasa Berardi Mine · goldTonnes: 3817000Grade: 2.6Grade Unit: g/tContained Metal: 319Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:29c2625404682f8c8d4c
Deposit or zone
WMCP
Mining method
combined

Resource Data

Category
measured
Tonnes
3817000
Grade
2.6
Grade Unit
g/t
Contained Metal
319
Contained Unit
koz
Cutoff Grade
0.63
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
24700000
Prior Grade
3.18
Prior Contained Metal
2520

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The Measured resource for the WMCP open pit shows good grade and high confidence, contributing positively to the project, though the update itself is not highly novel.

Positive factors

  • Good grade for open pit mining.
  • High confidence Measured category.

Negative factors

  • Very minor change from prior estimate.

Evidence · table

“3,817”

Context: WMCP

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 3817000 against 24700000 previously

Grade Declinenegative

Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.

Why it applies: 2.6 against 3.18 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 319 against 2520 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedCasa Berardi Mine · goldTonnes: 1579000Grade: 2.36Grade Unit: g/tContained Metal: 120Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:1c0c9279b357680476dd
Deposit or zone
WMCP
Mining method
combined

Resource Data

Category
indicated
Tonnes
1579000
Grade
2.36
Grade Unit
g/t
Contained Metal
120
Contained Unit
koz
Cutoff Grade
0.63
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
24700000
Prior Grade
3.18
Prior Contained Metal
2520

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The Indicated resource for the WMCP open pit shows good grade and reasonable confidence, contributing positively to the project, though the update itself is not highly novel.

Positive factors

  • Good grade for open pit mining.
  • Reasonable geological confidence (Indicated category).

Negative factors

  • Very minor change from prior estimate.

Evidence · table

“1,579”

Context: WMCP

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 1579000 against 24700000 previously

Grade Declinenegative

Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.

Why it applies: 2.36 against 3.18 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 120 against 2520 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredCasa Berardi Mine · goldTonnes: 116000Grade: 2.01Grade Unit: g/tContained Metal: 7Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:76fdda77d72c9026f681
Deposit or zone
WMCP
Mining method
combined

Resource Data

Category
inferred
Tonnes
116000
Grade
2.01
Grade Unit
g/t
Contained Metal
7
Contained Unit
koz
Cutoff Grade
0.63
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
2800000
Prior Grade
4.37
Prior Contained Metal
395

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The Inferred resource for the WMCP open pit is in a lower confidence category, contributing to the project's potential but with geological speculation.

Negative factors

  • Lower confidence Inferred category.
  • Very minor change from prior estimate.

Evidence · table

“116”

Context: WMCP

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 116000 against 2800000 previously

Grade Declinenegative

Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.

Why it applies: 2.01 against 4.37 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 7 against 395 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredCasa Berardi Mine · goldTonnes: 87000Grade: 3.36Grade Unit: g/tContained Metal: 9Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:3acd3a8c255d6ddef707
Deposit or zone
Principal
Mining method
combined

Resource Data

Category
measured
Tonnes
87000
Grade
3.36
Grade Unit
g/t
Contained Metal
9
Contained Unit
koz
Cutoff Grade
0.63
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
24700000
Prior Grade
3.18
Prior Contained Metal
2520

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The Measured resource for the Principal open pit shows high grade and high confidence, but its small scale limits its overall impact.

Positive factors

  • High grade for open pit mining.
  • High confidence Measured category.

Negative factors

  • Very small tonnage and contained metal.
  • Very minor change from prior estimate.

Evidence · table

“87”

Context: Principal

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 87000 against 24700000 previously

Grade Improvementpositive

Average resource grade improved vs prior estimate — better deposit economics.

Why it applies: 3.36 against 3.18 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 9 against 2520 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedCasa Berardi Mine · goldTonnes: 7523000Grade: 2.71Grade Unit: g/tContained Metal: 655Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:07dbaa0fbc6a9f0c4842
Deposit or zone
Principal
Mining method
combined

Resource Data

Category
indicated
Tonnes
7523000
Grade
2.71
Grade Unit
g/t
Contained Metal
655
Contained Unit
koz
Cutoff Grade
0.63
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
24700000
Prior Grade
3.18
Prior Contained Metal
2520

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The Indicated resource for the Principal open pit shows high grade and significant scale, contributing substantially to the project's value, though the update itself is not highly novel.

Positive factors

  • High grade for open pit mining.
  • Significant tonnage and contained metal.
  • Reasonable geological confidence (Indicated category).

Negative factors

  • Very minor change from prior estimate.

Evidence · table

“7,523”

Context: Principal

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 7523000 against 24700000 previously

Grade Declinenegative

Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.

Why it applies: 2.71 against 3.18 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 655 against 2520 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredCasa Berardi Mine · goldTonnes: 1008000Grade: 2.29Grade Unit: g/tContained Metal: 74Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:af88688548f878331e84
Deposit or zone
Principal
Mining method
combined

Resource Data

Category
inferred
Tonnes
1008000
Grade
2.29
Grade Unit
g/t
Contained Metal
74
Contained Unit
koz
Cutoff Grade
0.63
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
2800000
Prior Grade
4.37
Prior Contained Metal
395

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The Inferred resource for the Principal open pit shows good grade but lower confidence, contributing to the project's potential but with geological speculation.

Positive factors

  • Good grade for open pit mining.

Negative factors

  • Lower confidence Inferred category.
  • Very minor change from prior estimate.

Evidence · table

“1,008”

Context: Principal

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 1008000 against 2800000 previously

Grade Declinenegative

Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.

Why it applies: 2.29 against 4.37 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 74 against 395 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredCasa Berardi Mine · goldTonnes: 10091000Grade: 3.3Grade Unit: g/tContained Metal: 1074Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:0962eb7052845a65226c
Deposit or zone
Casa Berardi
Mining method
combined

Resource Data

Category
measured
Tonnes
10091000
Grade
3.3
Grade Unit
g/t
Contained Metal
1074
Contained Unit
koz
Cutoff Grade
0.63
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
24700000
Prior Grade
3.18
Prior Contained Metal
2520

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The total Measured resource for Casa Berardi represents a significant, high-confidence portion of the project's value, though the update itself is not highly novel.

Positive factors

  • Significant tonnage and contained metal in the highest confidence category.
  • Good overall grade.

Negative factors

  • Very minor change from prior estimate.

Evidence · table

“10,091”

Context: Total

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 10091000 against 24700000 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 1074 against 2520 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedCasa Berardi Mine · goldTonnes: 14648000Grade: 3.09Grade Unit: g/tContained Metal: 1454Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:923c20bbab211a2fbb9e
Deposit or zone
Casa Berardi
Mining method
combined

Resource Data

Category
indicated
Tonnes
14648000
Grade
3.09
Grade Unit
g/t
Contained Metal
1454
Contained Unit
koz
Cutoff Grade
0.63
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
24700000
Prior Grade
3.18
Prior Contained Metal
2520

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The total Indicated resource for Casa Berardi represents a significant, reasonable-confidence portion of the project's value, though the update itself is not highly novel.

Positive factors

  • Significant tonnage and contained metal in the Indicated category.
  • Good overall grade.

Negative factors

  • Very minor change from prior estimate.

Evidence · table

“14,648”

Context: Total

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Tonnage Declinenegative

Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.

Why it applies: 14648000 against 24700000 previously

Contained Metal Declinenegative

Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.

Why it applies: 1454 against 2520 previously

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredCasa Berardi Mine · goldTonnes: 2798000Grade: 4.37Grade Unit: g/tContained Metal: 395Contained Unit: kozView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Alexandre Nickerson
Resource group id
resource:78e02a8bad6568a33ea3
Deposit or zone
Casa Berardi
Mining method
combined

Resource Data

Category
inferred
Tonnes
2798000
Grade
4.37
Grade Unit
g/t
Contained Metal
395
Contained Unit
koz
Cutoff Grade
0.63
Cutoff Unit
g/t Au

Prior Estimate

Resource Date
2026-06-30
Prior Tonnes
2800000
Prior Grade
4.37
Prior Contained Metal
395

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The total Inferred resource for Casa Berardi represents a significant, but lower confidence, portion of the project's potential, with geological speculation.

Positive factors

  • Significant contained metal in the Inferred category.
  • High overall grade.

Negative factors

  • Lower confidence Inferred category.
  • Very minor change from prior estimate.

Evidence · table

“2,798”

Context: Total

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Metallurgical Results (2)

mill production dataCasa Berardi Mine · goldRecovery: 84 %Head Grade: 4.64Head Grade Unit: g/tView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Test Work

Program Status
preliminary
Test Type
mill production data
Processing Route
conventional single stage primary crusher, two-stage SAG and ball mill grinding circuit, gravity circuit, and CIL circuit

Recovery

Recovery
84 %
Recovery Basis
actual_test
Head Grade
4.64
Head Grade Unit
g/t

Lab

Laboratory
Mine laboratory

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The projected average gold recovery of 84% for underground material is good for the established CIL processing route, contributing positively to project economics, though the mine lab's lack of independence and certification is a minor concern.

Positive factors

  • Good average gold recovery for the processing route.
  • Established processing route (CIL).

Negative factors

  • Mine laboratory is not independent and not ISO certified.

Evidence · table

“4.64”

Context: Underground Head Grade

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the mill_cil signal

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: processing_route matches the gravity signal

mill production dataCasa Berardi Mine · goldRecovery: 84 %Head Grade: 2.32Head Grade Unit: g/tView all details
Link to this fact

Identity

Project
Casa Berardi Mine
Commodity
gold
Region
canada_qc
Reported Region
Quebec, Canada
Ticker
ORE

Test Work

Program Status
preliminary
Test Type
mill production data
Processing Route
conventional single stage primary crusher, two-stage SAG and ball mill grinding circuit, gravity circuit, and CIL circuit

Recovery

Recovery
84 %
Recovery Basis
actual_test
Head Grade
2.32
Head Grade Unit
g/t

Lab

Laboratory
Mine laboratory

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-01T00:00:00.000Z

Reasoning: The projected average gold recovery of 84% for open pit material is good for the established CIL processing route, contributing positively to project economics, though the mine lab's lack of independence and certification is a minor concern.

Positive factors

  • Good average gold recovery for the processing route.
  • Established processing route (CIL).

Negative factors

  • Mine laboratory is not independent and not ISO certified.

Evidence · table

“2.32”

Context: Open Pit Head Grade

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the mill_cil signal

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: processing_route matches the gravity signal

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.