OR3: Investor Presentation - Coolgardie Gold
Original announcement by asx on
- Company
- Ore Resources Limited
- Ticker
- OR3
- Exchange
- ASX
- Region
- Western Australia
- Primary commodity
- Gold
- Secondary commodities
- Lithium
- Document categories
- Resource update, Other
- Extracted
- 2026-10-27 22:13:19 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Ore Resources Limited announced its initial JORC-compliant Mineral Resource Estimate for the Miriam Gold Project within its Coolgardie Gold Projects in Western Australia. The maiden estimate totals 2.8 million tonnes at 1.7 g/t gold for 153,200 contained ounces, with 34% in the Indicated category. The company also outlined an exploration target of 4.55 to 5.8 million tonnes at 1.4 to 2.3 g/t gold for 200,000 to 400,000 contained ounces across its Coolgardie Gold Projects, highlighting substantial growth potential.
Reasoning: Ore Resources Limited announced its maiden JORC-compliant gold mineral resource estimate for the Miriam Gold Project, establishing a significant contained gold figure at a strong average grade, alongside a substantial exploration target for future growth, which is a major de-risking and value-adding milestone for the company.
Positive factors
- Initial JORC-compliant Mineral Resource Estimate established for the Miriam Gold Project.
- Significant contained gold ounces (153,200 oz) at a strong average grade (1.7 g/t Au) for open pit mining.
- Resource estimate is signed off by a Competent Person (CP) and includes a clear cut-off grade.
- Strong exploration target outlined for future resource growth across Coolgardie Gold Projects.
Negative factors
- A significant portion of the maiden resource (66%) is in the Inferred category, indicating early-stage confidence.
Low confidence — this extraction should be reviewed alongside the original source.
Facts used in scoring: 6

Classification and evidence
Maiden Resourceneutral
First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.
Why it applies: The document announces the 'INITIAL GOLD MINERAL RESOURCE' for the Miriam Gold Project, establishing the first formal MRE for the project.
Evidence · text
“INITIAL GOLD MINERAL RESOURCE”
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: The resource estimate is stated to be compliant with the 'JORC Code 2012'.
Evidence · text
“JORC Code 2012”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Mr. Shaun Searle, a Member of the Australian Institute of Geoscientists, is named as the Competent Person responsible for the Mineral Resource statement.
Evidence · text
“Mr Searle has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: A significant portion of the total resource (1.86 Mt at 1.7 g/t Au for 99,800 oz) is classified as Inferred.
Evidence · table
“1,860”
Context: Inferred
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: The Mineral Resource is reported with a clear '0.5 g/t Au cut-off'.
Evidence · text
“0.5 g/t Au cut-off”
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: The document presents an 'INITIAL GOLD MINERAL RESOURCE', which is an update from having no formal resource estimate.
Evidence · text
“INITIAL GOLD MINERAL RESOURCE”
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: The Mineral Resource is reported within an optimised pit shell using economic parameters (gold price, metallurgical recovery, pit wall angles), indicating it is prepared to support economic studies.
Evidence · text
“The Mineral Resource is reported within an optimised pit shell at 0.5 g/t Au cut-off and generated using a gold price of A$7,000/oz, metallurgical recovery of 95%, and pit wall angles ranging from 40° to 50°.”
Extracted facts
Stored fact records: 6. Some facts used in scoring do not have a stored record.
Resource Estimates (6)
indicatedMiriam · goldTonnes: 940000Grade: 1.8Grade Unit: g/tContained Metal: 53370Contained Unit: ozView all detailsHide details
Identity
- Project
- Miriam
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- OR3
Resource scope
- Estimate type
- resource
- Effective date
- 2026-10-01T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Shaun Searle
- Resource group id
- resource:31c5830cc21541ff401e
- Deposit or zone
- Forrest
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- indicated
- Tonnes
- 940000
- Grade
- 1.8
- Grade Unit
- g/t
- Contained Metal
- 53370
- Contained Unit
- oz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-10-01
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-27T00:00:00.000Z
Reasoning: The maiden Indicated Resource for the Forrest prospect provides a solid foundation for future development, with a strong grade for open pit potential.
Positive factors
- Maiden Indicated Resource for the Forrest prospect, adding confidence to the project.
- Grade of 1.8 g/t Au is considered strong for an open pit mining method.
Evidence · table
“1.8”
Context: 940
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredMiriam · goldTonnes: 110000Grade: 1.7Grade Unit: g/tContained Metal: 5800Contained Unit: ozView all detailsHide details
Identity
- Project
- Miriam
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- OR3
Resource scope
- Estimate type
- resource
- Effective date
- 2026-10-01T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Shaun Searle
- Resource group id
- resource:32cd10eb1f74ea266150
- Deposit or zone
- Canyon
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 110000
- Grade
- 1.7
- Grade Unit
- g/t
- Contained Metal
- 5800
- Contained Unit
- oz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-10-01
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-27T00:00:00.000Z
Reasoning: The maiden Inferred Resource for the Canyon prospect establishes early potential, but its classification as Inferred indicates lower confidence and requires further drilling.
Positive factors
- Maiden Inferred Resource for the Canyon prospect, indicating early potential.
- Grade of 1.7 g/t Au is considered strong for an open pit mining method.
Negative factors
- Resource is entirely in the Inferred category, which is speculative and has lower geological confidence.
Evidence · table
“1.7”
Context: 110
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
indicatedMiriam Gold Project · goldTonnes: 940000Grade: 1.8Grade Unit: g/tContained Metal: 53370Contained Unit: ozView all detailsHide details
Identity
- Project
- Miriam Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- OR3
Resource scope
- Estimate type
- resource
- Effective date
- 2026-10-01T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Shaun Searle
- Resource group id
- resource:d71d039d27a92757e575
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- indicated
- Tonnes
- 940000
- Grade
- 1.8
- Grade Unit
- g/t
- Contained Metal
- 53370
- Contained Unit
- oz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-10-01
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-27T00:00:00.000Z
Reasoning: The total Indicated Resource for the Miriam Gold Project establishes a significant portion of the resource with higher confidence, supported by a strong grade.
Positive factors
- Total Indicated Resource provides a strong foundation for the project.
- Grade of 1.8 g/t Au is considered strong for an open pit mining method.
Evidence · table
“940”
Context: Total
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredMiriam · goldTonnes: 1860000Grade: 1.7Grade Unit: g/tContained Metal: 99800Contained Unit: ozView all detailsHide details
Identity
- Project
- Miriam
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- OR3
Resource scope
- Estimate type
- resource
- Effective date
- 2026-10-01T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Shaun Searle
- Resource group id
- resource:da3e4937d703f1f10373
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 1860000
- Grade
- 1.7
- Grade Unit
- g/t
- Contained Metal
- 99800
- Contained Unit
- oz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-10-01
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-27T00:00:00.000Z
Reasoning: The total Inferred Resource for the Miriam Gold Project adds substantial ounces but requires further work to upgrade confidence.
Positive factors
- Total Inferred Resource contributes significantly to the overall contained ounces.
- Grade of 1.7 g/t Au is considered strong for an open pit mining method.
Negative factors
- Resource is in the Inferred category, which is speculative and has lower geological confidence.
Evidence · table
“1.7”
Context: 1,860
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
Fact 5Miriam Gold Project · goldTonnes: 2800000Grade: 1.7Grade Unit: g/tContained Metal: 153200Contained Unit: ozView all detailsHide details
Identity
- Project
- Miriam Gold Project
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- OR3
Resource scope
- Estimate type
- resource
- Effective date
- 2026-10-01T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Shaun Searle
- Resource group id
- resource:43a5fc6b8e931ad251ba
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Tonnes
- 2800000
- Grade
- 1.7
- Grade Unit
- g/t
- Contained Metal
- 153200
- Contained Unit
- oz
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-10-01
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-27T00:00:00.000Z
Reasoning: The overall maiden Mineral Resource Estimate is a significant milestone, establishing a substantial gold inventory at a strong average grade for the project.
Positive factors
- Maiden Mineral Resource Estimate for the Miriam Gold Project establishes a significant contained gold figure.
- Overall average grade of 1.7 g/t Au is considered strong for an open pit mining method.
Evidence · table
“2,800”
Context: Total
Tags used in scoring
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
inferredMiriam · goldTonnes: 2800000Grade: 1.7Grade Unit: g/tView all detailsHide details
Identity
- Project
- Miriam
- Commodity
- gold
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- OR3
Resource scope
- Estimate type
- resource
- Effective date
- 2026-10-01T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Shaun Searle
- Resource group id
- resource:ab8cde4af566d5b2e039
- Ownership percent
- 100 %
- Resource basis
- gross
Resource Data
- Category
- inferred
- Tonnes
- 2800000
- Grade
- 1.7
- Grade Unit
- g/t
- Cutoff Grade
- 0.5
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-10-01
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-27T00:00:00.000Z
Reasoning: The maiden Inferred Resource for the Canyon prospect establishes early potential, but its classification as Inferred indicates lower confidence and requires further drilling. (Expanded from multi-commodity resource table for completeness.)
Positive factors
- Maiden Inferred Resource for the Canyon prospect, indicating early potential.
- Grade of 1.7 g/t Au is considered strong for an open pit mining method.
Negative factors
- Resource is entirely in the Inferred category, which is speculative and has lower geological confidence.
Evidence · table
“1.7”
Context: 2,800
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.