ODY: Exceptional Drill Results Extend High-Grade Cable East Lode

Original announcement by asx on

Company
Odyssey Gold Limited
Ticker
ODY
Exchange
ASX
Region
Western Australia
Primary commodity
Gold
Secondary commodities
None reported
Document categories
Drill results, Resource update
Extracted
2026-11-17 23:05:42 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Odyssey Gold Limited has announced exceptional high-grade gold drill results from its Cable East Lode at the Tuckanarra Gold Project, Western Australia. Key intercepts include 21.3m at 8.2g/t Au, including 0.86m at 100.8g/t Au, and 20.0m at 4.2g/t Au, extending the high-grade mineralization beyond the conceptual Stage 1 pit and highlighting underground potential. The company also provided a summary of its existing Mineral Resource Estimate for the Tuckanarra Project, totaling 6.3Mt at 2.2g/t Au for 451koz Au, which is a re-statement of previously announced figures.

Reasoning: The document reports exceptional high-grade gold drill results, particularly CBDG006, which significantly extends the Cable East Lode and demonstrates strong potential for underground mining. The grade-thickness product for CBDG006 is exceptional and surpasses previous best results for the Cable West project. The resource estimate presented is a compilation of previously released data, not a new update, which reduces its novelty.

Positive factors

  • Exceptional high-grade gold intercept (100.8 g/t Au)
  • Significant grade-thickness product (174.66 g/t·m) for CBDG006, exceeding prior best GT for Cable West
  • Substantial intercept lengths (21.3m and 20.0m) indicating good continuity
  • True widths disclosed for all significant intercepts
  • Extension of high-grade mineralization beyond conceptual pit, supporting underground potential
  • QA/QC procedures are well-documented, including certified lab, QP sign-off, and multiple methods
  • Visible gold observed in high-grade interval

Negative factors

  • Resource estimate is a re-statement of prior announcements, not a new update

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 17

Atlas analysis — Odyssey Gold Limited: ODY: Exceptional Drill Results Extend High-Grade Cable East Lode. 12.9 g/t over 1.5 m; indicated 150000 tonnes

Classification and evidence

Bonanza Interceptpositive

Exceptionally high-grade zone, well above the deposit-type norm.

Why it applies: The intercept of 0.86m at 100.8g/t Au is exceptionally high-grade, well above the deposit-type norm for orogenic gold.

Evidence · text

“0.86m @ 100.8g/t Au”

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: True widths are provided for all reported intercepts in Table 3, allowing for a more accurate assessment of the mineralization geometry.

Evidence · text

“True widths of intersections in this announcement are interpreted to be 50-100% of the downhole width and provided in Table 3.”

Step-Out Extensionpositive

Mineralization extended beyond the previously known limit.

Why it applies: The new intersections extend the high-grade shoot beyond the conceptual Stage 1 pit and remain open down-plunge, indicating mineralization extension.

Evidence · text

“The high-grade shoot is defined over approximately 100m of strike and to a depth of only around 120m below surface. The shoot is open for testing down-plunge to the south, where grade and thickness appear to be increasing with depth.”

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: The release includes a detailed JORC Table 1 with information on sampling techniques, sample preparation, quality control procedures (standards, blanks, duplicates), and laboratory accreditation.

Evidence · text

“APPENDIX 1 - JORC Code, 2012 Edition – Table 1”

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: The cut-off grade (0.5 g/t Au) and maximum internal dilution (2m) used for reporting significant intercepts are clearly stated.

Evidence · text

“Significant intercepts are reported as down-hole length-weighted averages of grades above a nominal 0.5 g/t Au; or according to geological/mineralised units in core where warranted. No top cuts have been applied to the reporting of the assay results. ... A maximum of 2m consecutive internal waste is nominally allowed in composites.”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The exploration results are based on information compiled by Mr. Cain Fogarty, a member of the AIG, and the Mineral Resources are based on information compiled by Matthew Briggs, a Competent Person.

Evidence · text

“The information in this announcement that relates to Exploration Results is based on, and fairly represents, information and supporting documentation that was compiled by Mr. Cain Fogarty who is a member of the AIG and an employee of the Company. ... The information in this announcement that relates to Mineral Resources is extracted from announcements dated ... and is based on, and fairly represents information compiled by the relevant Competent Person, Matthew Briggs.”

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The Mineral Resource estimate is stated to be extracted from announcements compliant with the JORC Code, 2012 Edition.

Evidence · text

“APPENDIX 1 - JORC Code, 2012 Edition – Table 1”

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: A significant portion of the reported Mineral Resource is in the Inferred category, which is a speculative category with lower geological confidence.

Evidence · table

“Inferred”

Context: Grand Total

Stale Data Re-releasenegative

Historical results re-announced with no new assays or reinterpretation — low genuine novelty.

Why it applies: The Mineral Resource information is explicitly stated to be extracted from prior announcements dated 2 August 2023, 15 February 2024, and 7 July 2026, indicating it is not a new estimate.

Evidence · text

“The information in this announcement that relates to Mineral Resources is extracted from announcements dated 2 August 2023, 15 February 2024 and 7 July 2026”

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The document presents a summary of the current Mineral Resource Estimate for the Tuckanarra Project, which is a compilation of existing resources.

Evidence · text

“Tuckanarra Project Indicated and Inferred Mineral Resources stand at 6.3Mt @ 2.2g/t Au for 451koz Au.”

Extracted facts

Stored fact records: 17. Some facts used in scoring do not have a stored record.

Drill Results (1)

CBDG005Tuckanarra · goldGrade: 12.9Grade Unit: g/tIntercept: 1.5 mView all details
Link to this fact

Identity

Hole ID
CBDG005
Project
Tuckanarra
Commodity
gold
Region
australia_wa
Reported Region
australia_wa
Ticker
ODY

Geometry

Grade
12.9
Grade Unit
g/t
Intercept
1.5 m
True Width
1.1 m
From
178.3 m
To
179.8 m
Hole Depth
219 m
Intercept Depth
178.3 m

Classification

Deposit Type
orogenic
Program
mixed
Sample Type
drill
Group ID
CBDG005:178.3-179.8
Mining Method
mixed

Location

Location
Cable West
Easting
608751
Northing
7001766
Elevation
490 m
Azimuth
103 °
Dip
-55 °
Loc. Confidence
high
Loc. Source
document

QA/QC

Laboratory
ALS Laboratory Perth
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, blanks, duplicates, check_assays

Deleterious

Deleterious Flag
No

Metal Equivalent

Assumptions Disclosed
No

Compositing

Cutoff Grade
0.5
Cutoff Unit
g/t Au
Dilution Disclosed
Yes
Max Dilution
2 m

Review

Needs Review
No
Interp. Status
scored
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: This is a high-grade but narrow gold intercept that extends the Cable West lode at depth, indicating continued mineralization.

Positive factors

  • High-grade gold (12.9 g/t) is exceptional for open pit and strong for underground mining methods
  • True width (1.1m) disclosed
  • Extends Cable West lode mineralization at depth

Negative factors

  • Narrow intercept length (1.5m)

Evidence · table

“12.9”

Context: 1.50

Tags used in scoring

True Width Disclosedpositive

Actual thickness perpendicular to structure is stated, not just downhole length.

Why it applies: true_width_m is 1.1

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Compositing Transparentpositive

Cut-off grade and internal dilution rules are clearly stated for reported intervals.

Why it applies: cutoff_grade and internal dilution are both stated

Infill Drillingneutral

Confirmatory drilling to raise resource confidence, not new discovery.

Why it applies: drill_program_type is "mixed"

Nearology Playneutral

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "The Cable East mineralisation itself remains open at depth over more than 2km of known strike and results like these, wh"

Resource Estimates (16)

indicatedTuckanarra Project · goldTonnes: 150000Grade: 1.9Grade Unit: g/tContained Metal: 9Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Tuckanarra Project
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
ODY

Resource scope

Estimate type
resource
Effective date
2026-07-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Ian Glacken, Brian Wolfe, Andrew Bewsher, Matthew Walker, Justine Tracey, Matt Briggs, John Winterbottom
Resource group id
resource:bfa37a3e6cb28ec5fe7e
Deposit or zone
Bollard
Ownership percent
80 %

Resource Data

Category
indicated
Tonnes
150000
Grade
1.9
Grade Unit
g/t
Contained Metal
9
Contained Unit
koz
Cutoff Grade
0.9
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-07-01

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-07-07T00:00:00.000Z

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: This is a small indicated resource for the Bollard deposit, providing reasonable confidence. The estimate is a re-statement of prior data, reducing its novelty.

Positive factors

  • Indicated category provides reasonable geological confidence
  • Resource is JORC compliant and QP signed

Negative factors

  • Estimate is a re-statement of prior announcements, not a new update

Evidence · table

“0.15”

Context: Bollard

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredTuckanarra · goldTonnes: 90000Grade: 2.6Grade Unit: g/tContained Metal: 7Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Tuckanarra
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
ODY

Resource scope

Estimate type
resource
Effective date
2026-07-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Ian Glacken, Brian Wolfe, Andrew Bewsher, Matthew Walker, Justine Tracey, Matt Briggs, John Winterbottom
Resource group id
resource:4b1c0ba0bbc63aea5b48
Deposit or zone
Anchor
Mining method
combined
Ownership percent
80 %

Resource Data

Category
inferred
Tonnes
90000
Grade
2.6
Grade Unit
g/t
Contained Metal
7
Contained Unit
koz
Cutoff Grade
0.9
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-07-01

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-07-07T00:00:00.000Z

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: This is a small, inferred resource for the Anchor deposit, indicating early-stage confidence. The estimate is a re-statement of prior data, reducing its novelty.

Positive factors

  • Resource is JORC compliant and QP signed

Negative factors

  • Resource is entirely Inferred, indicating lower geological confidence
  • Estimate is a re-statement of prior announcements, not a new update

Evidence · table

“2.6”

Context: 0.09

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedTuckanarra · goldTonnes: 150000Grade: 1.9Grade Unit: g/tContained Metal: 17Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Tuckanarra
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
ODY

Resource scope

Estimate type
resource
Effective date
2026-07-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Ian Glacken, Brian Wolfe, Andrew Bewsher, Matthew Walker, Justine Tracey, Matt Briggs, John Winterbottom
Resource group id
resource:912eb90a617017109d30
Deposit or zone
Bottle Dump
Mining method
combined
Ownership percent
80 %

Resource Data

Category
indicated
Tonnes
150000
Grade
1.9
Grade Unit
g/t
Contained Metal
17
Contained Unit
koz
Cutoff Grade
0.9
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-07-01

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-07-07T00:00:00.000Z

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: This is a small indicated resource for the Bottle Dump deposit, providing reasonable confidence. The estimate is a re-statement of prior data, reducing its novelty.

Positive factors

  • Indicated category provides reasonable geological confidence
  • Resource is JORC compliant and QP signed

Negative factors

  • Estimate is a re-statement of prior announcements, not a new update

Evidence · table

“1.9”

Context: 0.15

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredTuckanarra · goldTonnes: 760000Grade: 2.2Grade Unit: g/tContained Metal: 54Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Tuckanarra
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
ODY

Resource scope

Estimate type
resource
Effective date
2026-07-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Ian Glacken, Brian Wolfe, Andrew Bewsher, Matthew Walker, Justine Tracey, Matt Briggs, John Winterbottom
Resource group id
resource:649bdaaaff8e8b226ae9
Deposit or zone
Bottle Dump
Mining method
combined
Ownership percent
80 %

Resource Data

Category
inferred
Tonnes
760000
Grade
2.2
Grade Unit
g/t
Contained Metal
54
Contained Unit
koz
Cutoff Grade
0.9
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-07-01

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-07-07T00:00:00.000Z

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: This is an inferred resource for the Bottle Dump deposit, indicating early-stage confidence. The estimate is a re-statement of prior data, reducing its novelty.

Positive factors

  • Resource is JORC compliant and QP signed

Negative factors

  • Resource is entirely Inferred, indicating lower geological confidence
  • Estimate is a re-statement of prior announcements, not a new update

Evidence · table

“2.2”

Context: 0.76

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredTuckanarra · goldTonnes: 530000Grade: 2.2Grade Unit: g/tContained Metal: 37Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Tuckanarra
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
ODY

Resource scope

Estimate type
resource
Effective date
2026-07-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Ian Glacken, Brian Wolfe, Andrew Bewsher, Matthew Walker, Justine Tracey, Matt Briggs, John Winterbottom
Resource group id
resource:2a92715bf666d6c32630
Deposit or zone
Bollard
Mining method
combined
Ownership percent
80 %

Resource Data

Category
inferred
Tonnes
530000
Grade
2.2
Grade Unit
g/t
Contained Metal
37
Contained Unit
koz
Cutoff Grade
0.9
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-07-01

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-07-07T00:00:00.000Z

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: This is an inferred resource for the Bollard deposit, indicating early-stage confidence. The estimate is a re-statement of prior data, reducing its novelty.

Positive factors

  • Resource is JORC compliant and QP signed

Negative factors

  • Resource is entirely Inferred, indicating lower geological confidence
  • Estimate is a re-statement of prior announcements, not a new update

Evidence · table

“2.2”

Context: 0.53

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedTuckanarra · goldTonnes: 1650000Grade: 1.6Grade Unit: g/tContained Metal: 87Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Tuckanarra
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
ODY

Resource scope

Estimate type
resource
Effective date
2026-07-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Ian Glacken, Brian Wolfe, Andrew Bewsher, Matthew Walker, Justine Tracey, Matt Briggs, John Winterbottom
Resource group id
resource:bed84561e2890cb44964
Deposit or zone
Cable
Mining method
combined
Ownership percent
80 %

Resource Data

Category
indicated
Tonnes
1650000
Grade
1.6
Grade Unit
g/t
Contained Metal
87
Contained Unit
koz
Cutoff Grade
0.5
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-07-01

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-07-07T00:00:00.000Z

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: This is an indicated resource for the Cable deposit, providing reasonable confidence. The estimate is a re-statement of prior data, reducing its novelty.

Positive factors

  • Indicated category provides reasonable geological confidence
  • Resource is JORC compliant and QP signed

Negative factors

  • Estimate is a re-statement of prior announcements, not a new update

Evidence · table

“1.6”

Context: 1.65

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredTuckanarra · goldTonnes: 1090000Grade: 2Grade Unit: g/tContained Metal: 70Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Tuckanarra
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
ODY

Resource scope

Estimate type
resource
Effective date
2026-07-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Ian Glacken, Brian Wolfe, Andrew Bewsher, Matthew Walker, Justine Tracey, Matt Briggs, John Winterbottom
Resource group id
resource:a4cc0a913beb9d4aad72
Deposit or zone
Cable
Mining method
combined
Ownership percent
80 %

Resource Data

Category
inferred
Tonnes
1090000
Grade
2
Grade Unit
g/t
Contained Metal
70
Contained Unit
koz
Cutoff Grade
0.5
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-07-01

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-07-07T00:00:00.000Z

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: This is an inferred resource for the Cable deposit, indicating early-stage confidence. The estimate is a re-statement of prior data, reducing its novelty.

Positive factors

  • Resource is JORC compliant and QP signed

Negative factors

  • Resource is entirely Inferred, indicating lower geological confidence
  • Estimate is a re-statement of prior announcements, not a new update

Evidence · table

“2.0”

Context: 1.09

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredTuckanarra · goldTonnes: 440000Grade: 2.3Grade Unit: g/tContained Metal: 32Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Tuckanarra
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
ODY

Resource scope

Estimate type
resource
Effective date
2026-07-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Ian Glacken, Brian Wolfe, Andrew Bewsher, Matthew Walker, Justine Tracey, Matt Briggs, John Winterbottom
Resource group id
resource:827d4d3e6950ef47ab55
Deposit or zone
Highway
Mining method
combined
Ownership percent
80 %

Resource Data

Category
inferred
Tonnes
440000
Grade
2.3
Grade Unit
g/t
Contained Metal
32
Contained Unit
koz
Cutoff Grade
0.9
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-07-01

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-07-07T00:00:00.000Z

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: This is an inferred resource for the Highway deposit (pit component), indicating early-stage confidence. The estimate is a re-statement of prior data, reducing its novelty.

Positive factors

  • Resource is JORC compliant and QP signed

Negative factors

  • Resource is entirely Inferred, indicating lower geological confidence
  • Estimate is a re-statement of prior announcements, not a new update

Evidence · table

“2.3”

Context: 0.44

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredTuckanarra · goldTonnes: 350000Grade: 5.8Grade Unit: g/tContained Metal: 65Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Tuckanarra
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
ODY

Resource scope

Estimate type
resource
Effective date
2026-07-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Ian Glacken, Brian Wolfe, Andrew Bewsher, Matthew Walker, Justine Tracey, Matt Briggs, John Winterbottom
Resource group id
resource:e9a378de2972a44942bc
Deposit or zone
Highway
Mining method
combined
Ownership percent
80 %

Resource Data

Category
inferred
Tonnes
350000
Grade
5.8
Grade Unit
g/t
Contained Metal
65
Contained Unit
koz
Cutoff Grade
2
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-07-01

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-07-07T00:00:00.000Z

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: This is an inferred resource for the Highway deposit (underground component) with a good grade for underground mining. The estimate is a re-statement of prior data, reducing its novelty.

Positive factors

  • Higher grade (5.8 g/t) for underground mining method
  • Resource is JORC compliant and QP signed

Negative factors

  • Resource is entirely Inferred, indicating lower geological confidence
  • Estimate is a re-statement of prior announcements, not a new update

Evidence · table

“5.8”

Context: 0.35

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredTuckanarra · goldTonnes: 160000Grade: 2.4Grade Unit: g/tContained Metal: 12Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Tuckanarra
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
ODY

Resource scope

Estimate type
resource
Effective date
2026-07-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Ian Glacken, Brian Wolfe, Andrew Bewsher, Matthew Walker, Justine Tracey, Matt Briggs, John Winterbottom
Resource group id
resource:121b9cfe11615df2b21c
Deposit or zone
Kohinoor
Mining method
combined
Ownership percent
80 %

Resource Data

Category
inferred
Tonnes
160000
Grade
2.4
Grade Unit
g/t
Contained Metal
12
Contained Unit
koz
Cutoff Grade
0.9
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-07-01

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-07-07T00:00:00.000Z

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: This is a small, inferred resource for the Kohinoor deposit (pit component), indicating early-stage confidence. The estimate is a re-statement of prior data, reducing its novelty.

Positive factors

  • Resource is JORC compliant and QP signed

Negative factors

  • Resource is entirely Inferred, indicating lower geological confidence
  • Estimate is a re-statement of prior announcements, not a new update

Evidence · table

“2.4”

Context: 0.16

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredTuckanarra · goldTonnes: 30000Grade: 9.1Grade Unit: g/tContained Metal: 9Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Tuckanarra
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
ODY

Resource scope

Estimate type
resource
Effective date
2026-07-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Ian Glacken, Brian Wolfe, Andrew Bewsher, Matthew Walker, Justine Tracey, Matt Briggs, John Winterbottom
Resource group id
resource:82a46bab8b6e3afeeed9
Deposit or zone
Kohinoor
Mining method
combined
Ownership percent
80 %

Resource Data

Category
inferred
Tonnes
30000
Grade
9.1
Grade Unit
g/t
Contained Metal
9
Contained Unit
koz
Cutoff Grade
2
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-07-01

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-07-07T00:00:00.000Z

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: This is a very small inferred resource for the Kohinoor deposit (underground component) with a high grade for underground mining. The estimate is a re-statement of prior data, reducing its novelty.

Positive factors

  • High grade (9.1 g/t) for underground mining method
  • Resource is JORC compliant and QP signed

Negative factors

  • Resource is entirely Inferred, indicating lower geological confidence
  • Estimate is a re-statement of prior announcements, not a new update

Evidence · table

“9.1”

Context: 0.03

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredTuckanarra · goldTonnes: 220000Grade: 1.3Grade Unit: g/tContained Metal: 9Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Tuckanarra
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
ODY

Resource scope

Estimate type
resource
Effective date
2026-07-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Ian Glacken, Brian Wolfe, Andrew Bewsher, Matthew Walker, Justine Tracey, Matt Briggs, John Winterbottom
Resource group id
resource:8802a402fea985389a46
Deposit or zone
Lucknow
Mining method
combined
Ownership percent
80 %

Resource Data

Category
inferred
Tonnes
220000
Grade
1.3
Grade Unit
g/t
Contained Metal
9
Contained Unit
koz
Cutoff Grade
0.9
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-07-01

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-07-07T00:00:00.000Z

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: This is a small, inferred resource for the Lucknow deposit, indicating early-stage confidence. The estimate is a re-statement of prior data, reducing its novelty.

Positive factors

  • Resource is JORC compliant and QP signed

Negative factors

  • Resource is entirely Inferred, indicating lower geological confidence
  • Estimate is a re-statement of prior announcements, not a new update

Evidence · table

“1.3”

Context: 0.22

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedTuckanarra · goldTonnes: 90000Grade: 2.3Grade Unit: g/tContained Metal: 7Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Tuckanarra
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
ODY

Resource scope

Estimate type
resource
Effective date
2026-07-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Ian Glacken, Brian Wolfe, Andrew Bewsher, Matthew Walker, Justine Tracey, Matt Briggs, John Winterbottom
Resource group id
resource:607939937c1ace12abdd
Deposit or zone
Maybelle
Mining method
combined
Ownership percent
80 %

Resource Data

Category
indicated
Tonnes
90000
Grade
2.3
Grade Unit
g/t
Contained Metal
7
Contained Unit
koz
Cutoff Grade
0.9
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-07-01

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-07-07T00:00:00.000Z

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: This is a small indicated resource for the Maybelle deposit, providing reasonable confidence. The estimate is a re-statement of prior data, reducing its novelty.

Positive factors

  • Indicated category provides reasonable geological confidence
  • Resource is JORC compliant and QP signed

Negative factors

  • Estimate is a re-statement of prior announcements, not a new update

Evidence · table

“2.3”

Context: 0.09

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredTuckanarra · goldTonnes: 570000Grade: 1.8Grade Unit: g/tContained Metal: 34Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Tuckanarra
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
ODY

Resource scope

Estimate type
resource
Effective date
2026-07-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Ian Glacken, Brian Wolfe, Andrew Bewsher, Matthew Walker, Justine Tracey, Matt Briggs, John Winterbottom
Resource group id
resource:34dff03129c76b0e6909
Deposit or zone
Maybelle
Mining method
combined
Ownership percent
80 %

Resource Data

Category
inferred
Tonnes
570000
Grade
1.8
Grade Unit
g/t
Contained Metal
34
Contained Unit
koz
Cutoff Grade
0.9
Cutoff Unit
g/t

Prior Estimate

Resource Date
2026-07-01

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-07-07T00:00:00.000Z

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: This is an inferred resource for the Maybelle deposit, indicating early-stage confidence. The estimate is a re-statement of prior data, reducing its novelty.

Positive factors

  • Resource is JORC compliant and QP signed

Negative factors

  • Resource is entirely Inferred, indicating lower geological confidence
  • Estimate is a re-statement of prior announcements, not a new update

Evidence · table

“1.8”

Context: 0.57

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

indicatedTuckanarra · goldTonnes: 2100000Grade: 1.8Grade Unit: g/tContained Metal: 120Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Tuckanarra
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
ODY

Resource scope

Estimate type
resource
Effective date
2026-07-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Ian Glacken, Brian Wolfe, Andrew Bewsher, Matthew Walker, Justine Tracey, Matt Briggs, John Winterbottom
Resource group id
resource:2b7aa81b72a79572c1ed
Mining method
combined
Ownership percent
80 %

Resource Data

Category
indicated
Tonnes
2100000
Grade
1.8
Grade Unit
g/t
Contained Metal
120
Contained Unit
koz

Prior Estimate

Resource Date
2026-07-01

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-07-07T00:00:00.000Z

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: This is the total indicated resource for the Tuckanarra Project, providing reasonable confidence. The estimate is a re-statement of prior data, reducing its novelty.

Positive factors

  • Indicated category provides reasonable geological confidence
  • Resource is JORC compliant and QP signed

Negative factors

  • Estimate is a re-statement of prior announcements, not a new update

Evidence · table

“1.8”

Context: 2.1

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

inferredTuckanarra · goldTonnes: 4300000Grade: 2.4Grade Unit: g/tContained Metal: 330Contained Unit: kozHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Tuckanarra
Commodity
gold
Region
australia_wa
Reported Region
Western Australia
Ticker
ODY

Resource scope

Estimate type
resource
Effective date
2026-07-01T00:00:00.000Z
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Ian Glacken, Brian Wolfe, Andrew Bewsher, Matthew Walker, Justine Tracey, Matt Briggs, John Winterbottom
Resource group id
resource:7267ab632ffa6f8c037a
Mining method
combined
Ownership percent
80 %

Resource Data

Category
inferred
Tonnes
4300000
Grade
2.4
Grade Unit
g/t
Contained Metal
330
Contained Unit
koz

Prior Estimate

Resource Date
2026-07-01

Metal Equivalent

Assumptions Disclosed
No

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2026-07-07T00:00:00.000Z

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: This is the total inferred resource for the Tuckanarra Project, indicating early-stage confidence. The estimate is a re-statement of prior data, reducing its novelty.

Positive factors

  • Resource is JORC compliant and QP signed

Negative factors

  • Resource is entirely Inferred, indicating lower geological confidence
  • Estimate is a re-statement of prior announcements, not a new update

Evidence · table

“2.4”

Context: 4.3

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.