NSJ Antimony Corp (NSJ) (9PZ0) Announces Completion of First Phase Drilling Program

Original announcement by orestocks on

Company
NSJ Antimony Corp
Ticker
NSJ.CN
Exchange
Unavailable
Region
New Brunswick, Canada
Primary commodity
Antimony
Secondary commodities
Gold
Document categories
Other, Drill results
Extracted
2026-11-04 14:47:52 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

NSJ Antimony Corp has completed the first phase of drilling at its Antimony 2.0 project in New Brunswick, totaling 3,469 metres across 11 holes. Samples have been delivered to Actlabs for multi-element and gold analysis, with results pending.

Reasoning: The company has completed a drilling program but is still awaiting assay results, making this a progress update rather than a technical results release.

Positive factors

  • Completion of first phase drilling program
  • Testing of known soil anomalies
  • Proximity to former Lake George Antimony Mine

Negative factors

  • No assay results reported in this release

Facts used in scoring: 1

Atlas analysis — NSJ Antimony Corp: NSJ Antimony Corp (NSJ) (9PZ0) Announces Completion of First Phase Drilling Program

Classification and evidence

Nearology Playneutral · Story-specific tag

Value premise rests on proximity to a known deposit rather than own results.

Why it applies: The project is located 15 km from the former Lake George Antimony Mine, a significant historical producer.

Evidence · text

“the same geological package that characterizes the former Lake George Antimony Mine approximately 15 km to the southwest.”

Extracted facts

Stored fact records: 1. Some facts used in scoring do not have a stored record.

Drill Results (1)

Fact 1Needs review: drill_no_hole_idView all details
Link to this fact

Identity

Region
canada_nb
Reported Region
canada_nb
Ticker
NSJ.CN

Geometry

Hole Depth
3562 m

Classification

Program
exploration
Sample Type
drill

QA/QC

Laboratory
Activation Laboratories Ltd. (Actlabs)
QA/QC Disclosed
Yes
Lab Certified
Yes
QP Signed
Yes
QA/QC Methods
standards, duplicates

Review

Needs Review
Yes
Review Reason
drill_no_hole_id
Interp. Status
scored
Historical
No

Dates

Event date
2026-11-04T00:00:00.000Z

Reasoning: Completion of a drilling program is a milestone, but the lack of grades prevents technical evaluation.

Positive factors

  • Drilling program completed

Negative factors

  • No assay results provided

Evidence · text

“11 drill holes completed, with 3,469 metres of NQ drilling.”

Tags used in scoring

QA/QC Disclosedpositive

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: qaqc_disclosed is true

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.