News Release - Drill Program Complete - Mineralized Zones Intersected
Original announcement by cse on
- Company
- GoldHaven Resources Corp.
- Ticker
- GOH
- Exchange
- CSE
- Region
- British Columbia
- Primary commodity
- Tungsten
- Secondary commodities
- Silver, Lead, Zinc
- Document categories
- Other, Drill results
- Extracted
- 2026-11-16 18:02:57 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
GoldHaven Resources Corp. has completed its inaugural 2026 diamond drilling program at the Magno Project in British Columbia. The program intersected tungsten-bearing skarn at the Kuhn target and semi-massive to massive sulphides at the D Zone, with assay results currently pending.
Reasoning: The company completed its first drill program at the Magno Project, hitting both tungsten and polymetallic targets, but actual grades are not yet available.
Positive factors
- completion of inaugural drill program
- intersection of multiple mineralized systems
- broad skarn intervals encountered
Negative factors
- assays are pending
- visual observations are not a substitute for laboratory analysis
Facts used in scoring: 1

Classification and evidence
QA/QC Disclosedpositive · Story-specific tag
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: The release mentions that results will be reported after passing appropriate quality assurance and quality control review and names a Qualified Person.
Evidence · text
“intends to provide further updates as results become available and have passed the appropriate quality assurance and quality control review.”
Apparent Width Onlynegative · Story-specific tag
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Why it applies: The 50m interval in GOH26-04 is described as a drilled core length and true widths are explicitly stated as not yet known.
Evidence · text
“Intervals are drilled core lengths, true widths are not yet known.”
Extracted facts
Stored fact records: 1. Some facts used in scoring do not have a stored record.
Drill Results (1)
GOH26-04Magno · tungstenIntercept: 50 mHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Hole ID
- GOH26-04
- Project
- Magno
- Commodity
- tungsten
- Region
- canada_bc
- Reported Region
- canada_bc
- Ticker
- GOH
Geometry
- Intercept
- 50 m
Classification
- Program
- exploration
- Sample Type
- drill
QA/QC
- QA/QC Disclosed
- Yes
- QA/QC Methods
- standards
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Interp. Status
- scored
- Historical
- Yes
Dates
- Event date
- 2026-11-16T00:00:00.000Z
Reasoning: A 50m interval of skarn was visually observed in GOH26-04, but grades are not yet reported.
Positive factors
- broad interval
Negative factors
- visual observation only
- assays pending
Evidence · text
“encountering broad skarn intervals, including an approximately 50-metre interval in drill hole GOH26-04.”
Tags used in scoring
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: qaqc_disclosed is true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
Stale Data Re-releasenegative
Historical results re-announced with no new assays or reinterpretation — low genuine novelty.
Why it applies: the fact restates a prior release
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.