Summary

Cerrado Gold reported Q3 2026 GEO production of 16,685 oz at AISC of $1,546/oz, up 21% from Q3 2025, with CIL operations delivering 90% gold recovery on high-grade Calandrias feed routed from the heap leach pad. Adjusted EBITDA reached $33.8M for the quarter and $90.8M year-to-date, with net income of $25.2M versus a net loss of $12.2M in the prior year period. The company completed the acquisition of the past-producing Manantial Espejo mine in Argentina and expects full-year production at the upper end of its 50,000-60,000 GEO guidance, with a new PEA for MDN targeted for end of Q1 2027.

Reasoning: Strong quarter with significant YoY improvement in production, costs and profitability driven by CIL ramp-up and high-grade feed routing strategy; partially offset by declining heap leach gold recovery and ongoing working capital deficiency.

Positive factors

  • Q3 2026 GEO production of 16,685 oz up 21% YoY from 13,832 GEO
  • CIL production up 107% YoY driven by high-grade Calandrias feed routing
  • AISC declined to $1,546/oz from $1,915/oz in Q3 2025
  • Adjusted EBITDA of $33.8M in Q3 and $90.8M YTD
  • Net income of $25.2M vs net loss of $12.2M in Q3 2025
  • Full year production expected at upper end of 50,000-60,000 GEO guidance
  • Strong cash position of $33.9M
  • Stream repurchase completed, now unhedged gold position
  • Acquisition of Manantial Espejo mine adds production growth optionality
  • CIL gold recovery improved to 90% in Q3 2026 from 86% in Q3 2025

Negative factors

  • Heap leach gold recovery declined to 33% in Q3 2026 from 47% in Q3 2025
  • Working capital deficiency of $11.9M
  • Heap leach silver recovery at 31% remains below weak band
  • January 2027 Note of $12M still outstanding
  • Capital expenditures of $17.6M in Q3 elevated
  • Heap leach gold recovery well below weak band for heap leach route

Facts used in scoring: 6

Classification and evidence

QA/QC Disclosedpositive · Story-specific tag

Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).

Why it applies: Scientific and technical information reviewed and approved by Andrew Croal P.Eng, Chief Technical Officer, named as Qualified Person under NI 43-101.

Evidence · text

“reviewed and approved by Andrew Croal P.Eng, Chief Technical Officer for Cerrado Gold, who is a Qualified Person as defined in National Instrument 43-101”

Heap Leach Routeneutral

Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.

Why it applies: the document describes a heap_leach route ("heap leach")

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: the document describes a mill_cil route ("CIL")

Gravity Routeneutral

Gravity separation forms a material part of the flowsheet.

Why it applies: the document describes a gravity route ("Falcon")

Multi-Domain Testedpositive

Variability across ore domains (oxide, transition, fresh) has been addressed.

Why it applies: 3 distinct composites were tested

Extracted facts

Stored fact records: 6. Some facts used in scoring do not have a stored record.

Metallurgical Results (6)

bottle rollMinera Don Nicolas · goldRecovery: 95 %Head Grade: 2.5Head Grade Unit: g/tView all details
Link to this fact

Identity

Project
Minera Don Nicolas
Commodity
gold
Region
argentina
Reported Region
Santa Cruz Province, Argentina
Ticker
CERT

Test Work

Program Status
preliminary
Test Type
bottle roll
Processing Route
mill_cil
Sample
selected high-grade Calandrias material, generally above 2.5 g/t gold, transported to Martinetas CIL mill

Recovery

Recovery
95 %
Recovery Basis
actual_test
Head Grade
2.5
Head Grade Unit
g/t

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-19T00:00:00.000Z

Reasoning: 95% CIL bottle roll recovery on selected high-grade Calandrias material is at the exceptional band for mill_cil route (≥95%), but is a selected composite result not representative of overall plant performance; consistent with prior RAG testwork, so novelty is limited.

Positive factors

  • 95% gold recovery from bottle roll testing on selected high-grade Calandrias material
  • Significantly higher than ~60% expected from heap leach route
  • Supports routing decision to CIL mill for high-grade material
  • Consistent with prior RAG testwork showing 95% recovery for selected Calandrias material

Negative factors

  • Laboratory bottle roll results for selected material only — not representative of overall plant recovery
  • Single domain tested — oxide/selected high-grade only, not full ore variability
  • Bench scale only — no locked-cycle or pilot work disclosed for this programme
  • Comparison to prior RAG result (95%) shows no improvement — same result restated

Evidence · text

“selected material achieving gold recoveries of up to 95%, compared with approximately 60% expected through heap leaching”
unspecifiedMinera Don Nicolas · goldRecovery: 60 %View all details
Link to this fact

Identity

Project
Minera Don Nicolas
Commodity
gold
Region
argentina
Reported Region
Santa Cruz Province, Argentina
Ticker
CERT

Test Work

Program Status
preliminary
Test Type
unspecified
Processing Route
heap_leach
Sample
material for heap leach pad at MDN

Recovery

Recovery
60 %
Recovery Basis
theoretical

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-19T00:00:00.000Z

Reasoning: The 60% theoretical heap leach recovery from the 2024 technical report is cited as the basis for routing decisions; actual Q3 2026 heap leach gold recovery of 33% is well below this, suggesting the theoretical figure is not being achieved in practice.

Positive factors

  • 60% heap leach recovery cited as baseline from current technical report
  • Provides context for routing decision economics

Negative factors

  • 60% theoretical heap leach recovery is above the weak band (≥45%) but below moderate (≥55%) — actually above moderate for heap leach
  • Theoretical recovery from technical report, not actual test result
  • Actual Q3 heap leach gold recovery of 33% is far below this theoretical figure
  • Comparison to actual plant performance reveals significant gap between theoretical and achieved recovery

Evidence · text

“approximately 60% expected through heap leaching as outlined in the current technical report”

Tags used in scoring

Low Recoverynegative

Recovery below the weak band for the commodity and processing route.

Why it applies: 60% is below the weak band (80%)

plant operationsMinera Don Nicolas · goldRecovery: 33 %Head Grade: 0.89Head Grade Unit: g/tView all details
Link to this fact

Identity

Project
Minera Don Nicolas
Commodity
gold
Region
argentina
Reported Region
Santa Cruz Province, Argentina
Ticker
CERT

Test Work

Program Status
detailed
Test Type
plant operations
Processing Route
heap_leach
Sample
Q3 2026 heap leach operations — ore placed on pad

Recovery

Recovery
33 %
Recovery Basis
actual_test
Head Grade
0.89
Head Grade Unit
g/t

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-19T00:00:00.000Z

Reasoning: Heap leach gold recovery of 33% in Q3 2026 is a red flag — well below the weak band of 45% for heap leach and a 14pp decline from Q3 2025's 47%, indicating significant underperformance of the heap leach circuit despite increased ore throughput.

Positive factors

  • Heap leach silver recovery improved to 31% from 23% in Q3 2025
  • Ore mined increased 51% YoY to 1,150 kt
  • Mining rate increased to 24.63 ktpd from 19.13 ktpd

Negative factors

  • Gold recovery of 33% is well below the weak band for heap leach (≥45%) and far below the 60% theoretical figure
  • Gold recovery declined significantly from 47% in Q3 2025 — a 14 percentage point decline
  • Gold recovery decline is a material negative signal for heap leach economics
  • Head grade improved only modestly from 0.81 to 0.89 g/t

Evidence · table

“33%”

Context: 0.89

plant operationsMinera Don Nicolas · silverRecovery: 31 %Head Grade: 9.01Head Grade Unit: g/tView all details
Link to this fact

Identity

Project
Minera Don Nicolas
Commodity
silver
Region
argentina
Reported Region
Santa Cruz Province, Argentina
Ticker
CERT

Test Work

Program Status
detailed
Test Type
plant operations
Processing Route
heap_leach
Sample
Q3 2026 heap leach operations — ore placed on pad

Recovery

Recovery
31 %
Recovery Basis
actual_test
Head Grade
9.01
Head Grade Unit
g/t

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-19T00:00:00.000Z

Reasoning: Heap leach silver recovery improved 8pp YoY to 31%, which is a positive directional signal, but remains well below acceptable levels for a heap leach operation and is not a like-for-like improvement comparison given the different head grades.

Positive factors

  • Silver recovery improved to 31% from 23% in Q3 2025 — an 8pp improvement
  • Silver ounces produced of 82,231 oz in Q3

Negative factors

  • 31% silver recovery remains well below the weak band for heap leach silver
  • Head grade declined from 11.68 to 9.01 g/t
  • Silver recovery still very low in absolute terms

Evidence · table

“31%”

Context: 9.01

plant operationsMinera Don Nicolas · goldRecovery: 90 %Head Grade: 2.29Head Grade Unit: g/tView all details
Link to this fact

Identity

Project
Minera Don Nicolas
Commodity
gold
Region
argentina
Reported Region
Santa Cruz Province, Argentina
Ticker
CERT

Test Work

Program Status
detailed
Test Type
plant operations
Processing Route
mill_cil
Sample
Q3 2026 high-grade CIL operations at Martinetas mill

Recovery

Recovery
90 %
Recovery Basis
actual_test
Head Grade
2.29
Head Grade Unit
g/t

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-19T00:00:00.000Z

Reasoning: CIL gold recovery of 90% at 2.29 g/t head grade is a strong result, with a 4pp improvement from Q3 2025 and 107% higher gold production, driven by routing of high-grade Calandrias material to the mill.

Positive factors

  • 90% CIL gold recovery is at the strong band for mill_cil route (≥90%)
  • Improved from 86% in Q3 2025 — a 4pp improvement
  • Head grade improved significantly from 1.31 to 2.29 g/t
  • CIL gold production up 107% YoY to 6,607 oz
  • Mill throughput increased to 1,093 tpd from 1,006 tpd

Negative factors

  • 4pp improvement is moderate rather than exceptional
  • Silver CIL recovery of 70% is below the strong band for silver flotation/CIL

Evidence · table

“90%”

Context: 2.29

plant operationsMinera Don Nicolas · silverRecovery: 70 %Head Grade: 11.63Head Grade Unit: g/tView all details
Link to this fact

Identity

Project
Minera Don Nicolas
Commodity
silver
Region
argentina
Reported Region
Santa Cruz Province, Argentina
Ticker
CERT

Test Work

Program Status
detailed
Test Type
plant operations
Processing Route
mill_cil
Sample
Q3 2026 high-grade CIL operations at Martinetas mill

Recovery

Recovery
70 %
Recovery Basis
actual_test
Head Grade
11.63
Head Grade Unit
g/t

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-19T00:00:00.000Z

Reasoning: Silver CIL recovery improved 15pp to 70%, which is exceptional in terms of improvement magnitude, but the absolute recovery remains below the strong band for silver CIL; the head grade change means the comparison is not strictly like-for-like.

Positive factors

  • Silver CIL recovery improved significantly from 55% in Q3 2025 to 70% in Q3 2026 — a 15pp improvement
  • Silver production up 124% YoY to 29,523 oz from CIL

Negative factors

  • 70% silver CIL recovery is below the strong band for silver (≥85%) and only at the moderate band
  • Head grade improved from 7.98 to 11.63 g/t, so comparison is not strictly like-for-like

Evidence · table

“70%”

Context: 11.63

Tags used in scoring

Low Recoverynegative

Recovery below the weak band for the commodity and processing route.

Why it applies: 70% is below the weak band (75%)

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.