MPK: 2,077,000 Ounces at 1.87g/t Gold in Interim MRE at Ferke
Original announcement by asx on
- Company
- Many Peaks Minerals Limited
- Ticker
- MPK
- Exchange
- ASX
- Region
- Republic of Côte d’Ivoire, West Africa
- Primary commodity
- Gold
- Secondary commodities
- None reported
- Document categories
- Resource update, Metallurgy
- Extracted
- 2026-11-04 23:09:42 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Many Peaks Minerals Limited announced an interim Mineral Resource Estimate for its Ouarigue prospect at the Ferké Gold Project, reporting 2.077 million ounces of gold at 1.87 g/t. This represents a 57% increase in ounces over six months, with 97% of the open pit resource now in the Measured and Indicated categories. Initial metallurgical leach tests returned gold extractions ranging from 74% to 91.5%, with optimization studies ongoing and the MRE adopting a conservative 85% recovery assumption.
Reasoning: The interim MRE shows a significant 57% increase in total gold ounces to 2.077 Moz, with a high proportion (97% for open pit) in Measured and Indicated categories, and the inclusion of a substantial underground component. While the open pit grade slightly declined and the cut-off was lowered, the overall contained metal growth is strong. Initial metallurgical test work shows good gold recoveries across multiple domains, with potential for optimization, but results are still at bench scale and the MRE uses a conservative assumption.
Positive factors
- Tonnage Growth
- Category Upgrade
- Measured Resource
- Indicated Resource
- QP/CP Signed
- JORC Compliant
- High Recovery
- Multi-Domain Tested
- Recovery Improving
Negative factors
- Dilutive Growth
- Cut-off Lowered
- Bench Scale Only
- Recovery Stagnant
- Single Domain Only
- Theoretical Recovery Only
Low confidence — this extraction should be reviewed alongside the original source.
Facts used in scoring: 12

Classification and evidence
Tonnage Growthpositive
Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.
Why it applies: The Ouarigue MRE has increased to 34.6Mt from a prior total of 26.6 Mt, representing a significant increase in tonnage.
Evidence · text
“The Ouarigue MRE has increased to 34.6Mt @ 1.87g/t gold for 2,077,000 ounces”
Category Upgradepositive
Resource confidence improved — Inferred upgraded to Indicated, or Indicated to Measured. De-risking signal.
Why it applies: The open pit constrained resource is 97% Measured & Indicated categories, an increase from the previous 83%, and includes an over 77% increase in Measured category from conversion of Indicated category.
Evidence · text
“High confidence open pit constrained resource is 97% Measured & Indicated categories including an over 77% increase in Measured category from conversion of Indicated category”
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: The MRE includes a Measured category of 13.47 Mt at 1.63 g/t gold for 706,000 ounces in the open pit.
Evidence · table
“Measured”
Context: 13.47
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: The MRE includes an Indicated category of 10.16 Mt at 1.14 g/t gold for 371,000 ounces in the open pit and 0.58 Mt at 3.02 g/t gold for 57,000 ounces in the underground.
Evidence · table
“Indicated”
Context: 10.16
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: The Mineral Resources information is based on information compiled and audited by Mr Stuart Hutchin and Mr Mark Shutty, both members of the AIG and Competent Persons as defined by JORC Code.
Evidence · text
“The information in this report that relates to Mineral Resources is based on information compiled and audited by Mr Stuart Hutchin, who is a Member of the Australian Institute of Geoscientists (AIG).”
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: The Mineral Resource Estimate is prepared in compliance with the JORC 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code).
Evidence · text
“qualify as a Competent Person as defined in the JORC 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code).”
Dilutive Growthnegative
Tonnage increased but contained metal flat or down — likely from lower cut-off grade, not geological expansion.
Why it applies: The overall open pit grade decreased from 1.48 g/t Au in the Inaugural MRE to 1.42 g/t Au in the Interim MRE, despite an increase in total contained ounces.
Evidence · text
“The overall open pit mineral resource estimate is reduced by 16.3%. The 215,000 ounces drop is primarily attributed to the upward shift of depth in context of revised RPEEE assumptions.”
Cut-off Lowerednegative
Cut-off grade significantly reduced vs prior estimate — tonnage growth may be artificial inflation.
Why it applies: The in-pit lower cut-off grade was reduced from 0.38 g/t Au in the Inaugural MRE to 0.31 g/t Au in the Interim MRE, which can contribute to tonnage growth at the expense of grade.
Evidence · text
“an In-Pit lower cut-off of 0.31g/t Au, and an Underground cut-off of 1.35g/t Au”
High Recoverypositive
Recovery at or above the exceptional band for the commodity and processing route.
Why it applies: Initial metallurgy leach tests returned overall gold extraction values ranging from 74% to 91.5% recoveries, with specific composites achieving over 90%.
Evidence · text
“Initial metallurgy leach tests return overall gold extraction values ranging from 74% to 91.5% recoveries across eight defined domains”
Multi-Domain Testedpositive
Variability across ore domains (oxide, transition, fresh) has been addressed.
Why it applies: Metallurgical testwork was conducted across eight defined domains and variability composites, assessing spatial variability, oxidation state, grade, and principal mineralised lithologies.
Evidence · text
“Initial metallurgy leach tests return overall gold extraction values ranging from 74% to 91.5% recoveries across eight defined domains”
Recovery Improvingpositive
Recovery improved versus a like-for-like prior test program on the same domain and route.
Why it applies: A single exploratory test demonstrated an increase in recovery of 11.6 percentage points (15.7% relative improvement) for the poorest performing sulfide/fresh rock composite sample with additional reagents.
Evidence · text
“Preliminary tests to optimise gold leach tests with additional reagents demonstrate an increase in recovery of 11.6 percentage points, equivalent to 15.7% relative improvement, demonstrated in one test from the poorest performing sulfide/fresh rock composite sample.”
Bench Scale Onlynegative
Only preliminary bench tests completed — no locked-cycle or pilot work.
Why it applies: The metallurgical testwork described consists of bottle roll tests and other bench-scale tests, with no locked-cycle or pilot plant work mentioned as completed.
Evidence · text
“Baseline extraction testing used gravity concentration at a nominal P80 of 212μm, intensive leaching of the gravity concentrate and 48-hour bottle-roll cyanidation”
Recovery Stagnantnegative
No improvement across multiple test programs on comparable material.
Why it applies: The directly tested LOM blend returned 75.0% overall extraction, compared with a contained-gold-weighted estimate of 80.3% from the variability composites, indicating a potential lack of improvement or even a slight decline for the blended material.
Evidence · text
“The directly tested LOM blend returned 75.0% overall extraction at P80 150μm, compared with a contained-gold-weighted estimate of 80.3% from the variability composites.”
Single Domain Onlynegative
Testing limited to one composite or domain — representativeness not established.
Why it applies: The significant recovery improvement of 11.6 percentage points was demonstrated in only one test from the poorest performing sulfide/fresh rock composite sample, not across all domains or the LOM blend.
Evidence · text
“demonstrated in one test from the poorest performing sulfide/fresh rock composite sample.”
Theoretical Recovery Onlynegative
Only theoretical or liberation-derived recovery reported, with no actual test result.
Why it applies: The MRE applies an assumed metallurgical recovery of 85% as a provisional assumption, which is a modelling assumption and not a recovery demonstrated across the full variability programme or the tested LOM blend.
Evidence · text
“The MRE applies an assumed metallurgical recovery of 85% in transition and sulfide material, as described elsewhere in this announcement. This is a modelling assumption and is not a recovery demonstrated across the full variability programme or the tested LOM blend.”
Heap Leach Routeneutral
Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.
Why it applies: The processing route involves gravity concentration and cyanidation, which is a common method for gold extraction.
Evidence · text
“Baseline extraction testing used gravity concentration at a nominal P80 of 212μm, intensive leaching of the gravity concentrate and 48-hour bottle-roll cyanidation”
Mill Routeneutral
Processing via mill or concentrator (CIL, CIP, tank leach, flotation).
Why it applies: The processing route involves gravity concentration and cyanidation, which is a common method for gold extraction.
Evidence · text
“Baseline extraction testing used gravity concentration at a nominal P80 of 212μm, intensive leaching of the gravity concentrate and 48-hour bottle-roll cyanidation”
Gravity Routeneutral
Gravity separation forms a material part of the flowsheet.
Why it applies: The metallurgical testwork includes gravity concentration as part of the baseline extraction testing.
Evidence · text
“Baseline extraction testing used gravity concentration at a nominal P80 of 212μm”
Extracted facts
Stored fact records: 12. Some facts used in scoring do not have a stored record.
Resource Estimates (5)
measuredFerké Gold Project · goldTonnes: 13470000Grade: 1.63Grade Unit: g/tContained Metal: 706000Contained Unit: ozView all detailsHide details
Identity
- Project
- Ferké Gold Project
- Commodity
- gold
- Region
- republic of côte d’ivoire, west africa
- Reported Region
- Republic of Côte d’Ivoire, West Africa
- Ticker
- MPK
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Stuart Hutchin, Mark Shutty
- Resource group id
- resource:a0760b6f4a07ef0f9fd3
- Deposit or zone
- Ouarigue prospect
- Mining method
- combined
Resource Data
- Category
- measured
- Tonnes
- 13470000
- Grade
- 1.63
- Grade Unit
- g/t
- Contained Metal
- 706000
- Contained Unit
- oz
- Cutoff Grade
- 0.31
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-10-13
- Prior Tonnes
- 8200000
- Prior Grade
- 1.5
- Prior Contained Metal
- 398000
- Prior Cutoff Grade
- 0.38
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: The Measured category for the open pit increased significantly to 13.47 Mt at 1.63 g/t Au for 706,000 oz, representing a substantial upgrade in confidence and contained metal from the prior estimate, despite a lower cut-off grade.
Positive factors
- Measured Resource
- Category Upgrade
- Tonnage Growth
- QP/CP Signed
- JORC Compliant
Negative factors
- Cut-off Lowered
Evidence · table
“1.63”
Context: 13.47
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Tonnage Growthpositive
Significant tonnage increase (≥15%) vs prior estimate with grade maintained or improved.
Why it applies: 13470000 against 8200000 previously
Grade Improvementpositive
Average resource grade improved vs prior estimate — better deposit economics.
Why it applies: 1.63 against 1.5 previously
Contained Metal Growthpositive
True scale improvement — contained metal ounces/tonnes increased vs prior, accounting for both tonnage and grade changes.
Why it applies: 706000 against 398000 previously
Cut-off Lowerednegative
Cut-off grade significantly reduced vs prior estimate — tonnage growth may be artificial inflation.
Why it applies: 0.31 against 0.38 previously
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedFerké Gold Project · goldTonnes: 10160000Grade: 1.14Grade Unit: g/tContained Metal: 371000Contained Unit: ozView all detailsHide details
Identity
- Project
- Ferké Gold Project
- Commodity
- gold
- Region
- republic of côte d’ivoire, west africa
- Reported Region
- Republic of Côte d’Ivoire, West Africa
- Ticker
- MPK
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Stuart Hutchin, Mark Shutty
- Resource group id
- resource:c346f97e655f8fa82475
- Deposit or zone
- Ouarigue prospect
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 10160000
- Grade
- 1.14
- Grade Unit
- g/t
- Contained Metal
- 371000
- Contained Unit
- oz
- Cutoff Grade
- 0.31
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-10-13
- Prior Tonnes
- 14900000
- Prior Grade
- 1.46
- Prior Contained Metal
- 700000
- Prior Cutoff Grade
- 0.38
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: The Indicated category for the open pit saw a decrease in tonnage, grade, and contained metal compared to the prior estimate, despite a lower cut-off grade, indicating some material was reclassified or moved to underground.
Positive factors
- Indicated Resource
- QP/CP Signed
- JORC Compliant
Negative factors
- Tonnage Decline
- Grade Decline
- Contained Metal Decline
- Cut-off Lowered
Evidence · table
“1.14”
Context: 10.16
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Tonnage Declinenegative
Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.
Why it applies: 10160000 against 14900000 previously
Grade Declinenegative
Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.
Why it applies: 1.14 against 1.46 previously
Contained Metal Declinenegative
Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.
Why it applies: 371000 against 700000 previously
Cut-off Lowerednegative
Cut-off grade significantly reduced vs prior estimate — tonnage growth may be artificial inflation.
Why it applies: 0.31 against 0.38 previously
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredFerké Gold Project · goldTonnes: 680000Grade: 1.41Grade Unit: g/tContained Metal: 31000Contained Unit: ozView all detailsHide details
Identity
- Project
- Ferké Gold Project
- Commodity
- gold
- Region
- republic of côte d’ivoire, west africa
- Reported Region
- Republic of Côte d’Ivoire, West Africa
- Ticker
- MPK
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Stuart Hutchin, Mark Shutty
- Resource group id
- resource:d3fceb058584fdf6d95b
- Deposit or zone
- Ouarigue prospect
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 680000
- Grade
- 1.41
- Grade Unit
- g/t
- Contained Metal
- 31000
- Contained Unit
- oz
- Cutoff Grade
- 0.31
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-10-13
- Prior Tonnes
- 3500000
- Prior Grade
- 2
- Prior Contained Metal
- 225000
- Prior Cutoff Grade
- 0.38
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: The Inferred category for the open pit significantly decreased in tonnage, grade, and contained metal, likely due to reclassification or material moving to the underground component, despite a lower cut-off grade.
Positive factors
- QP/CP Signed
- JORC Compliant
Negative factors
- Inferred Resource
- Tonnage Decline
- Grade Decline
- Contained Metal Decline
- Cut-off Lowered
Evidence · table
“1.41”
Context: 0.68
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Tonnage Declinenegative
Resource tonnage decreased vs prior estimate — pit optimization removed marginal material or geological model revised down.
Why it applies: 680000 against 3500000 previously
Grade Declinenegative
Average grade dropped >5% vs prior estimate — deposit economics worsening. May indicate high-grading in early drilling.
Why it applies: 1.41 against 2 previously
Contained Metal Declinenegative
Contained metal decreased vs prior despite tonnage growth — grade dilution exceeds volume gain.
Why it applies: 31000 against 225000 previously
Cut-off Lowerednegative
Cut-off grade significantly reduced vs prior estimate — tonnage growth may be artificial inflation.
Why it applies: 0.31 against 0.38 previously
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
indicatedFerké Gold Project · goldTonnes: 580000Grade: 3.02Grade Unit: g/tContained Metal: 57000Contained Unit: ozView all detailsHide details
Identity
- Project
- Ferké Gold Project
- Commodity
- gold
- Region
- republic of côte d’ivoire, west africa
- Reported Region
- Republic of Côte d’Ivoire, West Africa
- Ticker
- MPK
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Stuart Hutchin, Mark Shutty
- Resource group id
- resource:1e372261587297e48874
- Deposit or zone
- Ouarigue prospect
- Mining method
- combined
Resource Data
- Category
- indicated
- Tonnes
- 580000
- Grade
- 3.02
- Grade Unit
- g/t
- Contained Metal
- 57000
- Contained Unit
- oz
- Cutoff Grade
- 1.35
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-10-13
- Prior Tonnes
- 0
- Prior Grade
- 0
- Prior Contained Metal
- 0
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: The introduction of an Indicated underground resource of 0.58 Mt at 3.02 g/t Au for 57,000 oz is a new and positive development, adding high-grade material to the overall resource.
Positive factors
- Indicated Resource
- Tonnage Growth
- QP/CP Signed
- JORC Compliant
Evidence · table
“3.02”
Context: 0.58
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
inferredFerké Gold Project · goldTonnes: 9710000Grade: 2.92Grade Unit: g/tContained Metal: 912000Contained Unit: ozView all detailsHide details
Identity
- Project
- Ferké Gold Project
- Commodity
- gold
- Region
- republic of côte d’ivoire, west africa
- Reported Region
- Republic of Côte d’Ivoire, West Africa
- Ticker
- MPK
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Stuart Hutchin, Mark Shutty
- Resource group id
- resource:1daeacb61840dfa0106e
- Deposit or zone
- Ouarigue prospect
- Mining method
- combined
Resource Data
- Category
- inferred
- Tonnes
- 9710000
- Grade
- 2.92
- Grade Unit
- g/t
- Contained Metal
- 912000
- Contained Unit
- oz
- Cutoff Grade
- 1.35
- Cutoff Unit
- g/t Au
Prior Estimate
- Resource Date
- 2026-10-13
- Prior Tonnes
- 0
- Prior Grade
- 0
- Prior Contained Metal
- 0
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: The addition of a substantial Inferred underground resource of 9.71 Mt at 2.92 g/t Au for 912,000 oz significantly contributes to the overall resource growth and demonstrates potential for future conversion.
Positive factors
- Inferred Resource
- Tonnage Growth
- QP/CP Signed
- JORC Compliant
Evidence · table
“2.92”
Context: 9.71
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: the release compares against a previous estimate
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Metallurgical Results (7)
bottle rollFerké Gold Project · goldRecovery: 90.3 %View all detailsHide details
Identity
- Project
- Ferké Gold Project
- Commodity
- gold
- Region
- republic of côte d’ivoire, west africa
- Reported Region
- Republic of Côte d’Ivoire, West Africa
- Ticker
- MPK
Test Work
- Program Status
- optimization
- Test Type
- bottle roll
- Processing Route
- gravity plus cyanidation
- Sample
- V2OT oxide/transition composite
- Leach Time
- 48 hours
Recovery
- Recovery
- 90.3 %
- Recovery Basis
- actual_test
Lab
- Laboratory
- Bureau Veritas Minerals Pty Ltd
- Consultant
- Strategic Metallurgy
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: A high gold recovery of 90.3% was achieved from the V2OT oxide/transition composite in a 48-hour bottle roll test, indicating good amenability to the processing route, though it is still at bench scale.
Positive factors
- High Recovery
Negative factors
- Bench Scale Only
Evidence · text
“The V2OT and V3OT oxide/transition composites returned 90.3% and 89.2%, respectively.”
Tags used in scoring
Gravity Routeneutral
Gravity separation forms a material part of the flowsheet.
Why it applies: processing_route matches the gravity signal
bottle rollFerké Gold Project · goldRecovery: 89.2 %View all detailsHide details
Identity
- Project
- Ferké Gold Project
- Commodity
- gold
- Region
- republic of côte d’ivoire, west africa
- Reported Region
- Republic of Côte d’Ivoire, West Africa
- Ticker
- MPK
Test Work
- Program Status
- optimization
- Test Type
- bottle roll
- Processing Route
- gravity plus cyanidation
- Sample
- V3OT oxide/transition composite
- Leach Time
- 48 hours
Recovery
- Recovery
- 89.2 %
- Recovery Basis
- actual_test
Lab
- Laboratory
- Bureau Veritas Minerals Pty Ltd
- Consultant
- Strategic Metallurgy
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: A high gold recovery of 89.2% was achieved from the V3OT oxide/transition composite in a 48-hour bottle roll test, indicating good amenability to the processing route, though it is still at bench scale.
Positive factors
- High Recovery
Negative factors
- Bench Scale Only
Evidence · text
“The V2OT and V3OT oxide/transition composites returned 90.3% and 89.2%, respectively.”
Tags used in scoring
Gravity Routeneutral
Gravity separation forms a material part of the flowsheet.
Why it applies: processing_route matches the gravity signal
bottle rollFerké Gold Project · goldRecovery: 75 %View all detailsHide details
Identity
- Project
- Ferké Gold Project
- Commodity
- gold
- Region
- republic of côte d’ivoire, west africa
- Reported Region
- Republic of Côte d’Ivoire, West Africa
- Ticker
- MPK
Test Work
- Program Status
- optimization
- Test Type
- bottle roll
- Processing Route
- gravity plus cyanidation
- Sample
- LOM blend
- Grind P80
- 150 µm
- Leach Time
- 48 hours
Recovery
- Recovery
- 75 %
- Recovery Basis
- actual_test
Lab
- Laboratory
- Bureau Veritas Minerals Pty Ltd
- Consultant
- Strategic Metallurgy
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: The LOM blend returned 75.0% overall extraction at P80 150μm, which is lower than the contained-gold-weighted estimate of 80.3% from variability composites, indicating potential issues with representativeness or processing.
Negative factors
- Bench Scale Only
- Recovery Stagnant
Evidence · text
“The directly tested LOM blend returned 75.0% overall extraction at P80 150μm”
Tags used in scoring
Gravity Routeneutral
Gravity separation forms a material part of the flowsheet.
Why it applies: processing_route matches the gravity signal
Low Recoverynegative
Recovery below the weak band for the commodity and processing route.
Why it applies: 75% is below the weak band (80%)
bottle rollFerké Gold Project · goldRecovery: 85.7 %View all detailsHide details
Identity
- Project
- Ferké Gold Project
- Commodity
- gold
- Region
- republic of côte d’ivoire, west africa
- Reported Region
- Republic of Côte d’Ivoire, West Africa
- Ticker
- MPK
Test Work
- Program Status
- optimization
- Test Type
- bottle roll
- Processing Route
- gravity plus cyanidation
- Sample
- V6 composite
- Grind P80
- 75 µm
Recovery
- Recovery
- 85.7 %
- Recovery Basis
- actual_test
Reagents
- Cyanide
- 0.17 kg/t
- Reagent Notes
- 100g/t lead nitrate
Lab
- Laboratory
- Bureau Veritas Minerals Pty Ltd
- Consultant
- Strategic Metallurgy
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: A single exploratory test on V6 at P80 75μm with lead nitrate increased overall extraction from 74.1% to 85.7%, an improvement of 11.6 percentage points, demonstrating potential for optimization, though it's a single test on one composite.
Positive factors
- Recovery Improving
Negative factors
- Bench Scale Only
- Single Domain Only
Evidence · text
“A single exploratory test on V6 at P80 75μm with 100g/t lead nitrate increased overall extraction from 74.1% to 85.7%”
Tags used in scoring
Gravity Routeneutral
Gravity separation forms a material part of the flowsheet.
Why it applies: processing_route matches the gravity signal
bottle rollFerké Gold Project · goldRecovery: 83.2 %View all detailsHide details
Identity
- Project
- Ferké Gold Project
- Commodity
- gold
- Region
- republic of côte d’ivoire, west africa
- Reported Region
- Republic of Côte d’Ivoire, West Africa
- Ticker
- MPK
Test Work
- Program Status
- optimization
- Test Type
- bottle roll
- Processing Route
- gravity plus cyanidation
- Sample
- granite composite
- Grind P80
- 106 µm
Recovery
- Recovery
- 83.2 %
- Recovery Basis
- actual_test
Lab
- Laboratory
- Bureau Veritas Minerals Pty Ltd
- Consultant
- Strategic Metallurgy
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: Separate lithology tests at P80 106μm returned an overall extraction of 83.2% for the granite composite, indicating moderate recovery for this material type at bench scale.
Negative factors
- Bench Scale Only
- Single Domain Only
Evidence · text
“Separate lithology tests at P80 106μm returned overall extraction of 83.2% for the granite composite”
Tags used in scoring
Gravity Routeneutral
Gravity separation forms a material part of the flowsheet.
Why it applies: processing_route matches the gravity signal
bottle rollFerké Gold Project · goldRecovery: 78.2 %View all detailsHide details
Identity
- Project
- Ferké Gold Project
- Commodity
- gold
- Region
- republic of côte d’ivoire, west africa
- Reported Region
- Republic of Côte d’Ivoire, West Africa
- Ticker
- MPK
Test Work
- Program Status
- optimization
- Test Type
- bottle roll
- Processing Route
- gravity plus cyanidation
- Sample
- metasediment composite
- Grind P80
- 106 µm
Recovery
- Recovery
- 78.2 %
- Recovery Basis
- actual_test
Lab
- Laboratory
- Bureau Veritas Minerals Pty Ltd
- Consultant
- Strategic Metallurgy
Location
- Loc. Confidence
- medium
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: Separate lithology tests at P80 106μm returned an overall extraction of 78.2% for the metasediment composite, indicating a lower recovery compared to granite, still at bench scale.
Negative factors
- Bench Scale Only
- Single Domain Only
Evidence · text
“78.2% for the metasediment composite.”
Tags used in scoring
Gravity Routeneutral
Gravity separation forms a material part of the flowsheet.
Why it applies: processing_route matches the gravity signal
Low Recoverynegative
Recovery below the weak band for the commodity and processing route.
Why it applies: 78.2% is below the weak band (80%)
bottle rollFerké Gold Project · goldRecovery: 94 %Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Ferké Gold Project
- Commodity
- gold
- Region
- republic of côte d’ivoire, west africa
- Reported Region
- Republic of Côte d’Ivoire, West Africa
- Ticker
- MPK
Test Work
- Program Status
- preliminary
- Test Type
- bottle roll
- Processing Route
- cyanide leach
- Sample
- composite sampling, across a range of grades and domains
Recovery
- Recovery
- 94 %
- Recovery Basis
- actual_test
Location
- Loc. Confidence
- medium
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2025-11-06T00:00:00.000Z
Dates
- Event date
- 2026-11-04T00:00:00.000Z
Reasoning: Preliminary bottle roll tests averaged 94% recovery, which is a strong historical result, but this is superseded by the current ongoing test work.
Positive factors
- High Recovery
Negative factors
- Bench Scale Only
Evidence · text
“early bottle roll tests averaged 94% recovery (refer to ASX announcement dated 6 November 2025)”
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.