# MI6: September 2026 Quarterly Activities and Cashflow Report

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/mi6-september-2026-quarterly-activities-and-cashflow-report--33de51e6-2034-4be3-9277-9edc36ebc32b

Original source: https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03157495

Publisher: asx

Original announcement: 2026-10-26T21:44:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-10-26T22:30:32.792Z

Atlas analysis updated: 2026-10-26T22:30:32.792Z

- Company: Minerals 260 Limited

- Ticker: MI6

- Exchange: ASX

- Region: Western Australia

- Primary commodity: Unavailable

- Secondary commodities: None reported

- Document categories: Capital raise, Drill results, Other, Resource update

- Extracted: 2026-10-26 22:25:55 UTC

Narrative sentiment: 0.90 · Bullish

## Minestarters Atlas summary

Minerals 260 Limited reported a highly successful quarter, securing $420 million in new funding, including a $170 million royalty and $30 million equity investment from Franco-Nevada, alongside a $250 million equity placement. The company also announced high-grade gold drill intercepts, including 1.1m at 290g/t Au, and confirmed continuity of mineralization at its Bullabulling Gold Project. Significant progress was made on the Definitive Feasibility Study, approvals, and infrastructure development, positioning the company for a Final Investment Decision in Q1 CY2027.

Reasoning: Minerals 260 Limited secured substantial funding through royalty and equity investments, significantly bolstering its financial position. The company also reported high-grade gold drill intercepts and continued to advance its Bullabulling Gold Project through DFS work, approvals, and land acquisition.

- Positive factor: Significant capital raise secured, strengthening financial position.

- Positive factor: High-grade gold intercepts reported from infill and extensional drilling.

- Positive factor: Progress on Definitive Feasibility Study \(DFS\) and key approvals.

- Positive factor: Expanded land tenure at the Bullabulling Gold Project.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 24

## Classification and evidence

No classification tags are available.

## Extracted facts

Stored fact records: 17. Some facts used in scoring do not have a stored record.

## Drill Results (4)

### BBRD0538

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-september-2026-quarterly-activities-and-cashflow-report--33de51e6-2034-4be3-9277-9edc36ebc32b#fact-drill-facts-7)

Bullabulling · gold

#### Identity

- Hole ID: BBRD0538
- Project: Bullabulling
- Commodity: gold
- Region: australia\_wa
- Reported Region: australia\_wa
- Ticker: MI6

#### Geometry

- Grade: 290
- Grade Unit: g/t
- Intercept: 1.1 m
- From: 170 m
- To: 171.1 m
- Intercept Depth: 170 m

#### Classification

- Sample Type: drill
- Group ID: BBRD0538:170-171.1
- Mining Method: open\_pit

#### Location

- Location: Bacchus
- Loc. Source: document

#### QA/QC

- QA/QC Methods: standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-10-26T00:00:00.000Z

Reasoning: An exceptionally high-grade gold intercept was reported, indicating significant mineralization at Bacchus.

- Positive factor: Bonanza grade intercept, matching the project's best historical grade.

- Positive factor: Confirms presence of high-grade zones within the broader mineralised system.

Evidence · text

> The high-grade intercepts returned in BBRD0538 \(1.1m @ 290g/t Au\)

#### Tags used in scoring

**No QA/QC Disclosure**

Polarity: negative

Definition: Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc\_disclosed is not true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "ASX RELEASE I 27 OCTOBER 2026 I ASX:MI6 Page \| 1 Minerals 260 Limited \| ABN 34 650 766 911 PO Box 638, West Perth WA 600"

#### Rejected tags

**Bonanza Intercept** — Rejected; excluded from scoring

Polarity: positive

Definition: Exceptionally high-grade zone, well above the deposit-type norm.

Reason: 290 g/t Au is well above the exceptional threshold for open pit gold \(5 g/t\).

Evidence · text

> 1.1m @ 290g/t Au

### BBRD0546

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-september-2026-quarterly-activities-and-cashflow-report--33de51e6-2034-4be3-9277-9edc36ebc32b#fact-drill-facts-8)

Bullabulling · gold

#### Identity

- Hole ID: BBRD0546
- Project: Bullabulling
- Commodity: gold
- Region: australia\_wa
- Reported Region: australia\_wa
- Ticker: MI6

#### Geometry

- Grade: 35.8
- Grade Unit: g/t
- Intercept: 1 m

#### Classification

- Sample Type: drill
- Mining Method: open\_pit

#### Location

- Location: Bacchus
- Loc. Source: document

#### QA/QC

- QA/QC Methods: standards

#### Review

- Needs Review: No
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-10-26T00:00:00.000Z

Reasoning: A strong high-grade gold intercept was reported, further confirming mineralization at Bacchus.

- Positive factor: High-grade intercept, indicating strong mineralization.

Evidence · text

> and BBRD0546 \(1m @ 35.8g/t Au\)

#### Tags used in scoring

**No QA/QC Disclosure**

Polarity: negative

Definition: Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc\_disclosed is not true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "ASX RELEASE I 27 OCTOBER 2026 I ASX:MI6 Page \| 1 Minerals 260 Limited \| ABN 34 650 766 911 PO Box 638, West Perth WA 600"

#### Rejected tags

**Bonanza Intercept** — Rejected; excluded from scoring

Polarity: positive

Definition: Exceptionally high-grade zone, well above the deposit-type norm.

Reason: 35.8 g/t Au is well above the exceptional threshold for open pit gold \(5 g/t\).

Evidence · text

> 1m @ 35.8g/t Au

### Fact 3

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-september-2026-quarterly-activities-and-cashflow-report--33de51e6-2034-4be3-9277-9edc36ebc32b#fact-drill-facts-9)

Bullabulling · gold

Needs review: drill\_no\_hole\_id

#### Identity

- Project: Bullabulling
- Commodity: gold
- Region: australia\_wa
- Reported Region: australia\_wa
- Ticker: MI6

#### Geometry

- Grade: 10.9
- Grade Unit: g/t
- Intercept: 7 m
- From: 7 m
- To: 14 m
- Intercept Depth: 7 m

#### Classification

- Sample Type: drill
- Group ID: Bullabulling:7-14
- Mining Method: open\_pit

#### Location

- Location: Phoenix
- Loc. Source: document

#### QA/QC

- QA/QC Methods: standards

#### Review

- Needs Review: Yes
- Review Reason: drill\_no\_hole\_id
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-10-26T00:00:00.000Z

Reasoning: A strong gold intercept was reported at Phoenix, indicating shallow high-grade mineralization.

- Positive factor: Strong grade intercept at shallow depth.

- Positive factor: Confirms continuity of mineralisation and potential extensions.

Evidence · text

> including 7m @ 10.9g/t Au from 7m

#### Tags used in scoring

**No QA/QC Disclosure**

Polarity: negative

Definition: Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc\_disclosed is not true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "ASX RELEASE I 27 OCTOBER 2026 I ASX:MI6 Page \| 1 Minerals 260 Limited \| ABN 34 650 766 911 PO Box 638, West Perth WA 600"

#### Rejected tags

**Bonanza Intercept** — Rejected; excluded from scoring

Polarity: positive

Definition: Exceptionally high-grade zone, well above the deposit-type norm.

Reason: 10.9 g/t Au is well above the exceptional threshold for open pit gold \(5 g/t\).

Evidence · text

> 10.9g/t Au

### Fact 4

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-september-2026-quarterly-activities-and-cashflow-report--33de51e6-2034-4be3-9277-9edc36ebc32b#fact-drill-facts-10)

Bullabulling · gold

Needs review: drill\_no\_hole\_id

#### Identity

- Project: Bullabulling
- Commodity: gold
- Region: australia\_wa
- Reported Region: australia\_wa
- Ticker: MI6

#### Geometry

- Intercept: 25970 m

#### Classification

- Program: resource
- Sample Type: drill

#### QA/QC

- QA/QC Methods: standards

#### Review

- Needs Review: Yes
- Review Reason: drill\_no\_hole\_id
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-10-26T00:00:00.000Z

Reasoning: The completed grade control drilling program confirmed gold grades consistent with the MRE, enhancing confidence in the geological model.

- Positive factor: Grade control drilling confirms consistency with existing MRE.

- Positive factor: Reduces operational risk and improves confidence in geological model.

Evidence · text

> Initial ~26,000m grade control drilling program completed indicating overall gold grades consistent with the drilling underpinning the 6.2Moz Mineral Resource Estimate \(“MRE”\).

#### Tags used in scoring

**No QA/QC Disclosure**

Polarity: negative

Definition: Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.

Why it applies: qaqc\_disclosed is not true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**Nearology Play**

Polarity: neutral

Definition: Value premise rests on proximity to a known deposit rather than own results.

Why it applies: proximity is offered as the value premise: "ASX RELEASE I 27 OCTOBER 2026 I ASX:MI6 Page \| 1 Minerals 260 Limited \| ABN 34 650 766 911 PO Box 638, West Perth WA 600"

#### Rejected tags

**Infill Drilling** — Rejected; excluded from scoring

Polarity: neutral

Definition: Confirmatory drilling to raise resource confidence, not new discovery.

Reason: The grade control drilling was conducted on 10m x 10m spacing to improve definition of mineralisation and confirm consistency with the MRE.

Evidence · text

> Initial grade control drilling program at Bullabulling has been completed on 10m × 10m spacing, comprising 320 Reverse Circulation \(“RC”\) holes for 25,970m

**QA/QC Disclosed** — Rejected; excluded from scoring

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Reason: The release mentions detailed twin-hole comparisons as part of the grade control analysis.

Evidence · text

> Preliminary analysis of the grade control results, including detailed twin-hole comparisons \(39 RC–RC pairs\)

## Resource Estimates (13)

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-september-2026-quarterly-activities-and-cashflow-report--33de51e6-2034-4be3-9277-9edc36ebc32b#fact-resource-facts-11)

Bullabulling Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Resource group id: resource:049d279104cb9dc87c2d
- Deposit or zone: Dicksons

#### Resource Data

- Category: indicated
- Tonnes: 17000000
- Grade: 0.93
- Grade Unit: g/t
- Contained Metal: 500
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-10-26T00:00:00.000Z

Reasoning: Restatement of a previously announced Indicated Mineral Resource for the Dicksons deposit.

- Positive factor: Indicated resource category provides reasonable geological confidence.

Evidence · table

> 0.93

Context: 17

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-september-2026-quarterly-activities-and-cashflow-report--33de51e6-2034-4be3-9277-9edc36ebc32b#fact-resource-facts-12)

Bullabulling Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Resource group id: resource:3c82fcf82c6db8775268
- Deposit or zone: Dicksons

#### Resource Data

- Category: inferred
- Tonnes: 5500000
- Grade: 0.94
- Grade Unit: g/t
- Contained Metal: 170
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-10-26T00:00:00.000Z

Reasoning: Restatement of a previously announced Inferred Mineral Resource for the Dicksons deposit.

- Negative factor: Inferred resource category has lower geological confidence.

Evidence · table

> 0.94

Context: 5.5

#### Tags used in scoring

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-september-2026-quarterly-activities-and-cashflow-report--33de51e6-2034-4be3-9277-9edc36ebc32b#fact-resource-facts-13)

Bullabulling Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Resource group id: resource:94c903134731602d5bb7
- Deposit or zone: Phoenix

#### Resource Data

- Category: indicated
- Tonnes: 62000000
- Grade: 0.94
- Grade Unit: g/t
- Contained Metal: 1900
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-10-26T00:00:00.000Z

Reasoning: Restatement of a previously announced Indicated Mineral Resource for the Phoenix deposit.

- Positive factor: Indicated resource category provides reasonable geological confidence.

Evidence · table

> 0.94

Context: 62

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-september-2026-quarterly-activities-and-cashflow-report--33de51e6-2034-4be3-9277-9edc36ebc32b#fact-resource-facts-14)

Bullabulling Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Resource group id: resource:fc2184228bf60c4f28cc
- Deposit or zone: Phoenix

#### Resource Data

- Category: inferred
- Tonnes: 12000000
- Grade: 1
- Grade Unit: g/t
- Contained Metal: 390
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-10-26T00:00:00.000Z

Reasoning: Restatement of a previously announced Inferred Mineral Resource for the Phoenix deposit.

- Negative factor: Inferred resource category has lower geological confidence.

Evidence · table

> 1.0

Context: 12

#### Tags used in scoring

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-september-2026-quarterly-activities-and-cashflow-report--33de51e6-2034-4be3-9277-9edc36ebc32b#fact-resource-facts-15)

Bullabulling Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Resource group id: resource:d316a36a8c5616fe654a
- Deposit or zone: Bacchus

#### Resource Data

- Category: indicated
- Tonnes: 55000000
- Grade: 1
- Grade Unit: g/t
- Contained Metal: 1800
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-10-26T00:00:00.000Z

Reasoning: Restatement of a previously announced Indicated Mineral Resource for the Bacchus deposit.

- Positive factor: Indicated resource category provides reasonable geological confidence.

Evidence · table

> 1.0

Context: 55

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-september-2026-quarterly-activities-and-cashflow-report--33de51e6-2034-4be3-9277-9edc36ebc32b#fact-resource-facts-16)

Bullabulling Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Resource group id: resource:e51099303fc9e52c8ccd
- Deposit or zone: Bacchus

#### Resource Data

- Category: inferred
- Tonnes: 17000000
- Grade: 1.1
- Grade Unit: g/t
- Contained Metal: 580
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-10-26T00:00:00.000Z

Reasoning: Restatement of a previously announced Inferred Mineral Resource for the Bacchus deposit.

- Negative factor: Inferred resource category has lower geological confidence.

Evidence · table

> 1.1

Context: 17

#### Tags used in scoring

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-september-2026-quarterly-activities-and-cashflow-report--33de51e6-2034-4be3-9277-9edc36ebc32b#fact-resource-facts-17)

Bullabulling Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Resource group id: resource:146b95a71114db250265
- Deposit or zone: Kraken

#### Resource Data

- Category: indicated
- Tonnes: 4800000
- Grade: 1.1
- Grade Unit: g/t
- Contained Metal: 170
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-10-26T00:00:00.000Z

Reasoning: Restatement of a previously announced Indicated Mineral Resource for the Kraken deposit.

- Positive factor: Indicated resource category provides reasonable geological confidence.

Evidence · table

> 1.1

Context: 4.8

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-september-2026-quarterly-activities-and-cashflow-report--33de51e6-2034-4be3-9277-9edc36ebc32b#fact-resource-facts-18)

Bullabulling Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Resource group id: resource:570e83b15215794a4aae
- Deposit or zone: Kraken

#### Resource Data

- Category: inferred
- Tonnes: 11000000
- Grade: 1.1
- Grade Unit: g/t
- Contained Metal: 370
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-10-26T00:00:00.000Z

Reasoning: Restatement of a previously announced Inferred Mineral Resource for the Kraken deposit.

- Negative factor: Inferred resource category has lower geological confidence.

Evidence · table

> 1.1

Context: 11

#### Tags used in scoring

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-september-2026-quarterly-activities-and-cashflow-report--33de51e6-2034-4be3-9277-9edc36ebc32b#fact-resource-facts-19)

Bullabulling Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Resource group id: resource:ac216c1d1ac67883aa1f
- Deposit or zone: Gibraltar

#### Resource Data

- Category: indicated
- Tonnes: 2300000
- Grade: 1
- Grade Unit: g/t
- Contained Metal: 77
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-10-26T00:00:00.000Z

Reasoning: Restatement of a previously announced Indicated Mineral Resource for the Gibraltar deposit.

- Positive factor: Indicated resource category provides reasonable geological confidence.

Evidence · table

> 1.0

Context: 2.3

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-september-2026-quarterly-activities-and-cashflow-report--33de51e6-2034-4be3-9277-9edc36ebc32b#fact-resource-facts-20)

Bullabulling Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Resource group id: resource:7d806b4ccffb70cdb90b
- Deposit or zone: Gibraltar

#### Resource Data

- Category: inferred
- Tonnes: 6200000
- Grade: 1.1
- Grade Unit: g/t
- Contained Metal: 220
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-10-26T00:00:00.000Z

Reasoning: Restatement of a previously announced Inferred Mineral Resource for the Gibraltar deposit.

- Negative factor: Inferred resource category has lower geological confidence.

Evidence · table

> 1.1

Context: 6.2

#### Tags used in scoring

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-september-2026-quarterly-activities-and-cashflow-report--33de51e6-2034-4be3-9277-9edc36ebc32b#fact-resource-facts-21)

Bullabulling Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Resource group id: resource:e94b30b719b76501c951
- Deposit or zone: Total

#### Resource Data

- Category: indicated
- Tonnes: 140000000
- Grade: 0.98
- Grade Unit: g/t
- Contained Metal: 4400
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-10-26T00:00:00.000Z

Reasoning: Restatement of the total Indicated Mineral Resource for the Bullabulling Gold Project.

- Positive factor: Large Indicated resource provides a strong foundation for project development.

Evidence · table

> 0.98

Context: 140

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-september-2026-quarterly-activities-and-cashflow-report--33de51e6-2034-4be3-9277-9edc36ebc32b#fact-resource-facts-22)

Bullabulling Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Resource group id: resource:b83761f642a87097e299
- Deposit or zone: Total

#### Resource Data

- Category: inferred
- Tonnes: 51000000
- Grade: 1
- Grade Unit: g/t
- Contained Metal: 1700
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-10-26T00:00:00.000Z

Reasoning: Restatement of the total Inferred Mineral Resource for the Bullabulling Gold Project.

- Negative factor: Inferred resource category has lower geological confidence.

Evidence · table

> 1.0

Context: 51

#### Tags used in scoring

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### Total

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-september-2026-quarterly-activities-and-cashflow-report--33de51e6-2034-4be3-9277-9edc36ebc32b#fact-resource-facts-23)

Bullabulling Gold Project · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling Gold Project
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- QP Signed: Yes
- Resource group id: resource:7be2288cdc0b5822225f
- Deposit or zone: Total

#### Resource Data

- Tonnes: 190000000
- Grade: 1
- Grade Unit: g/t
- Contained Metal: 6200
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-10-26T00:00:00.000Z

Reasoning: Restatement of the total Mineral Resource for the Bullabulling Gold Project.

- Positive factor: Large total mineral resource provides significant project scale.

Evidence · table

> 1.0

Context: 190

#### Tags used in scoring

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: qp\_signed is true

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
