# MI6: Bullabulling Fully Funded to First Production

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/mi6-bullabulling-fully-funded-to-first-production--7cf8b73f-d73d-4674-af91-adaa44da3cd1

Original source: https://www.asx.com.au/asx/v2/statistics/displayAnnouncement.do?display=pdf&idsId=03164363

Publisher: asx

Original announcement: 2026-11-10T21:22:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-11-10T22:31:22.855Z

Atlas analysis updated: 2026-11-10T22:31:22.855Z

- Company: Minerals 260 Limited

- Ticker: MI6

- Exchange: ASX

- Region: Western Australia

- Primary commodity: Unavailable

- Secondary commodities: None reported

- Document categories: Capital raise, Resource update

- Extracted: 2026-11-10 22:23:40 UTC

Narrative sentiment: 0.80 · Bullish

## Minestarters Atlas summary

Minerals 260 Limited has secured $410 million in debt facilities from a syndicate of Tier-1 banks \(ANZ, NAB, and Societe Generale\) to fund the development of the Bullabulling Gold Project. This funding, combined with royalty and equity proceeds, fully funds the project to first production, with a Final Investment Decision expected in Q1 2027.

Reasoning: The announcement secures significant debt financing \($410m\) which de-risks the development of the Bullabulling project to first production.

- Positive factor: Fully funded to first production via $410m debt commitment

- Positive factor: Attractive commercial terms with Tier-1 banks

- Positive factor: No mandatory gold price hedging required

- Positive factor: Project scale confirmed with 6.2Moz gold resource

Facts used in scoring: 12

## Classification and evidence

**QP/CP Signed**

Polarity: positive

Definition: Qualified Person \(QP\) or Competent Person \(CP\) named and signed off — a member of a recognized professional association \(e.g., AusIMM, SME, AIG, P.Geo\) with relevant experience.

Why it applies: The announcement refers to a JORC 2012 Mineral Resource Estimate and includes a Competent Person Statement.

Evidence · text

> Competent Person Statement

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: The resource estimate is explicitly stated to be a JORC 2012 Mineral Resource Estimate.

Evidence · text

> hosts a JORC 2012 Mineral Resource Estimate

## Extracted facts

Stored fact records: 12. Some facts used in scoring do not have a stored record.

## Resource Estimates (12)

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-bullabulling-fully-funded-to-first-production--7cf8b73f-d73d-4674-af91-adaa44da3cd1#fact-resource-facts-0)

Bullabulling · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:7b1083ba8a45d74ec872
- Deposit or zone: Total Resource
- Resource basis: gross

#### Resource Data

- Category: indicated
- Tonnes: 140000000
- Grade: 0.98
- Grade Unit: g/t
- Contained Metal: 4400000
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-11-10T00:00:00.000Z

Reasoning: This is a restatement of the July 2026 resource estimate provided for context.

- Positive factor: Large scale indicated resource

- Negative factor: Historical restatement of July 2026 estimate

Evidence · text

> The information in this announcement that relates to the July 2026 Mineral Resource Estimate... is extracted from the Minerals 260 Limited ASX announcement... dated 8 July 2026.

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-bullabulling-fully-funded-to-first-production--7cf8b73f-d73d-4674-af91-adaa44da3cd1#fact-resource-facts-1)

Bullabulling · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:90ed83abede42ab00c11
- Deposit or zone: Total Resource
- Resource basis: gross

#### Resource Data

- Category: inferred
- Tonnes: 190000000
- Grade: 1
- Grade Unit: g/t
- Contained Metal: 6200000
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-11-10T00:00:00.000Z

Reasoning: This is a restatement of the July 2026 resource estimate provided for context.

- Positive factor: Large scale inferred resource

- Negative factor: Historical restatement of July 2026 estimate

Evidence · text

> The information in this announcement that relates to the July 2026 Mineral Resource Estimate... is extracted from the Minerals 260 Limited ASX announcement... dated 8 July 2026.

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-bullabulling-fully-funded-to-first-production--7cf8b73f-d73d-4674-af91-adaa44da3cd1#fact-resource-facts-2)

Bullabulling · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:035fa46d33b16aca4319
- Deposit or zone: Dicksons
- Resource basis: gross

#### Resource Data

- Category: indicated
- Tonnes: 17000000
- Grade: 0.94
- Grade Unit: g/t
- Contained Metal: 500000
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-11-10T00:00:00.000Z

Reasoning: Restatement of July 2026 data.

- Negative factor: Historical restatement

Evidence · table

> 500

Context: 17

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-bullabulling-fully-funded-to-first-production--7cf8b73f-d73d-4674-af91-adaa44da3cd1#fact-resource-facts-3)

Bullabulling · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:5e61aec3d6a2f9741d0b
- Deposit or zone: Dicksons
- Resource basis: gross

#### Resource Data

- Category: inferred
- Tonnes: 5500000
- Grade: 0.94
- Grade Unit: g/t
- Contained Metal: 170000
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-11-10T00:00:00.000Z

Reasoning: Restatement of July 2026 data.

- Negative factor: Historical restatement

Evidence · table

> 170

Context: 5.5

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-bullabulling-fully-funded-to-first-production--7cf8b73f-d73d-4674-af91-adaa44da3cd1#fact-resource-facts-4)

Bullabulling · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:ca47eb46c39c0fa673bf
- Deposit or zone: Phoenix
- Resource basis: gross

#### Resource Data

- Category: indicated
- Tonnes: 62000000
- Grade: 0.94
- Grade Unit: g/t
- Contained Metal: 1900000
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-11-10T00:00:00.000Z

Reasoning: Restatement of July 2026 data.

- Negative factor: Historical restatement

Evidence · table

> 1,900

Context: 62

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-bullabulling-fully-funded-to-first-production--7cf8b73f-d73d-4674-af91-adaa44da3cd1#fact-resource-facts-5)

Bullabulling · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:a6e442e2ddb2b986757f
- Deposit or zone: Phoenix
- Resource basis: gross

#### Resource Data

- Category: inferred
- Tonnes: 12000000
- Grade: 1
- Grade Unit: g/t
- Contained Metal: 390000
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-11-10T00:00:00.000Z

Reasoning: Restatement of July 2026 data.

- Negative factor: Historical restatement

Evidence · table

> 390

Context: 12

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-bullabulling-fully-funded-to-first-production--7cf8b73f-d73d-4674-af91-adaa44da3cd1#fact-resource-facts-6)

Bullabulling · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:0617889c7d3acdcc2313
- Deposit or zone: Bacchus
- Resource basis: gross

#### Resource Data

- Category: indicated
- Tonnes: 55000000
- Grade: 1
- Grade Unit: g/t
- Contained Metal: 1800000
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-11-10T00:00:00.000Z

Reasoning: Restatement of July 2026 data.

- Negative factor: Historical restatement

Evidence · table

> 1,800

Context: 55

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-bullabulling-fully-funded-to-first-production--7cf8b73f-d73d-4674-af91-adaa44da3cd1#fact-resource-facts-7)

Bullabulling · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:1c4aed408053ec80bbf7
- Deposit or zone: Bacchus
- Resource basis: gross

#### Resource Data

- Category: inferred
- Tonnes: 17000000
- Grade: 1.1
- Grade Unit: g/t
- Contained Metal: 580000
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-11-10T00:00:00.000Z

Reasoning: Restatement of July 2026 data.

- Negative factor: Historical restatement

Evidence · table

> 580

Context: 17

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-bullabulling-fully-funded-to-first-production--7cf8b73f-d73d-4674-af91-adaa44da3cd1#fact-resource-facts-8)

Bullabulling · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:1d9000b9b9e07d78af4b
- Deposit or zone: Kraken
- Resource basis: gross

#### Resource Data

- Category: indicated
- Tonnes: 4800000
- Grade: 1.1
- Grade Unit: g/t
- Contained Metal: 170000
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-11-10T00:00:00.000Z

Reasoning: Restatement of July 2026 data.

- Negative factor: Historical restatement

Evidence · table

> 170

Context: 4.8

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-bullabulling-fully-funded-to-first-production--7cf8b73f-d73d-4674-af91-adaa44da3cd1#fact-resource-facts-9)

Bullabulling · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:d77560b840972bb59e91
- Deposit or zone: Kraken
- Resource basis: gross

#### Resource Data

- Category: inferred
- Tonnes: 11000000
- Grade: 1.1
- Grade Unit: g/t
- Contained Metal: 370000
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-11-10T00:00:00.000Z

Reasoning: Restatement of July 2026 data.

- Negative factor: Historical restatement

Evidence · table

> 370

Context: 11

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-bullabulling-fully-funded-to-first-production--7cf8b73f-d73d-4674-af91-adaa44da3cd1#fact-resource-facts-10)

Bullabulling · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:933fab09362113eaef2a
- Deposit or zone: Gibraltar
- Resource basis: gross

#### Resource Data

- Category: indicated
- Tonnes: 2300000
- Grade: 1
- Grade Unit: g/t
- Contained Metal: 77000
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-11-10T00:00:00.000Z

Reasoning: Restatement of July 2026 data.

- Negative factor: Historical restatement

Evidence · table

> 77

Context: 2.3

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/mi6-bullabulling-fully-funded-to-first-production--7cf8b73f-d73d-4674-af91-adaa44da3cd1#fact-resource-facts-11)

Bullabulling · gold

Historical result

Needs review: historical\_restatement

#### Identity

- Project: Bullabulling
- Commodity: gold
- Region: australia\_wa
- Reported Region: Western Australia
- Ticker: MI6

#### Resource scope

- Estimate type: resource
- Reporting standards: jorc
- Resource group id: resource:98d6fd87409ac3685fdd
- Deposit or zone: Gibraltar
- Resource basis: gross

#### Resource Data

- Category: inferred
- Tonnes: 6200000
- Grade: 1.1
- Grade Unit: g/t
- Contained Metal: 220000
- Contained Unit: koz
- Cutoff Grade: 0.35
- Cutoff Unit: g/t Au

#### Prior Estimate

- Resource Date: 2026-07-08

#### Review

- Needs Review: Yes
- Review Reason: historical\_restatement
- Historical: Yes
- Historical Source Date: 2026-07-08T00:00:00.000Z

#### Dates

- Event date: 2026-11-10T00:00:00.000Z

Reasoning: Restatement of July 2026 data.

- Negative factor: Historical restatement

Evidence · table

> 220

Context: 6.2

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Disclosed**

Polarity: positive

Definition: Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff\_grade is stated

**JORC Compliant**

Polarity: positive

Definition: Resource estimate prepared in compliance with JORC Code \(Australia\) — high reporting standard.

Why it applies: reporting\_standards includes jorc

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
