Meridian Announces Q3 Financial Statements and MD&A
Original announcement by jmn on
- Company
- Meridian Mining plc
- Ticker
- MNO
- Exchange
- TSX
- Region
- Mato Grosso, Brazil
- Primary commodity
- Gold
- Secondary commodities
- Copper, Silver
- Document categories
- Other, Resource update
- Extracted
- 2026-11-13 08:17:06 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Meridian Mining has released its Q3 2026 financial statements and highlighted the results of the Cabaçal Definitive Feasibility Study (DFS). The DFS confirms a robust project with an after-tax NPV5 of USD 2.092 billion and an IRR of 107.6%.
Reasoning: The announcement of a Definitive Feasibility Study (DFS) for the Cabaçal project with exceptional economic metrics (NPV, IRR, Payback) is a major de-risking and value-creation milestone.
Positive factors
- High IRR of 107.6%
- Short payback period of 0.9 years
- Strong NPV of USD 2.092 billion
- Low AISC of USD 1,056/oz AuEq
- Confirmed high-quality copper concentrates in smelter tests
Facts used in scoring: 3

Classification and evidence
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: The DFS technical report is explicitly stated to be in accordance with NI 43-101.
Evidence · text
“The DFS has been filed on the Company's website... in accordance with NI 43-101.”
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The DFS includes Proven and Probable reserves for the Cabaçal project.
Evidence · text
“The Cabaçal Mineral Reserve estimate consists of Proven and Probable reserves”
Extracted facts
Stored fact records: 3. Some facts used in scoring do not have a stored record.
Resource Estimates (3)
provenCabaçal · goldTonnes: 56040000Grade: 0.61Grade Unit: g/tView all detailsHide details
Identity
- Project
- Cabaçal
- Commodity
- gold
- Region
- brazil
- Reported Region
- Mato Grosso, Brazil
- Ticker
- MNO
Resource scope
- Estimate type
- reserve
- Effective date
- 2026-09-15T00:00:00.000Z
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Qualified person names
- Erich Marques
- Resource group id
- resource:7c5a069bd6b3295ccbf3
- Deposit or zone
- Cabaçal
Resource Data
- Category
- proven
- Tonnes
- 56040000
- Grade
- 0.61
- Grade Unit
- g/t
- Cutoff Grade
- 0.138
- Cutoff Unit
- g/t AuEq
Prior Estimate
- Resource Date
- 2026-09-15
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Proven reserve component of the DFS.
Positive factors
- Part of DFS
Evidence · text
“The Cabaçal Mineral Reserve estimate consists of Proven and Probable reserves of 56.04 million tonnes at 0.61g/t gold”
Tags used in scoring
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "proven"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
provenCabaçal · copperTonnes: 56040000Grade: 0.35Grade Unit: %View all detailsHide details
Identity
- Project
- Cabaçal
- Commodity
- copper
- Region
- brazil
- Reported Region
- Mato Grosso, Brazil
- Ticker
- MNO
Resource scope
- Estimate type
- reserve
- Effective date
- 2026-09-15T00:00:00.000Z
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Qualified person names
- Erich Marques
- Resource group id
- resource:7c5a069bd6b3295ccbf3
- Deposit or zone
- Cabaçal
Resource Data
- Category
- proven
- Tonnes
- 56040000
- Grade
- 0.35
- Grade Unit
- %
- Cutoff Grade
- 0.138
- Cutoff Unit
- g/t AuEq
Prior Estimate
- Resource Date
- 2026-09-15
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Proven reserve component of the DFS.
Positive factors
- Part of DFS
Evidence · text
“56.04 million tonnes at 0.61g/t gold, 0.35% copper”
Tags used in scoring
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "proven"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
provenCabaçal · silverTonnes: 56040000Grade: 1.33Grade Unit: g/tView all detailsHide details
Identity
- Project
- Cabaçal
- Commodity
- silver
- Region
- brazil
- Reported Region
- Mato Grosso, Brazil
- Ticker
- MNO
Resource scope
- Estimate type
- reserve
- Effective date
- 2026-09-15T00:00:00.000Z
- Reporting standards
- ni_43_101
- QP Signed
- Yes
- Qualified person names
- Erich Marques
- Resource group id
- resource:7c5a069bd6b3295ccbf3
- Deposit or zone
- Cabaçal
Resource Data
- Category
- proven
- Tonnes
- 56040000
- Grade
- 1.33
- Grade Unit
- g/t
- Cutoff Grade
- 0.138
- Cutoff Unit
- g/t AuEq
Prior Estimate
- Resource Date
- 2026-09-15
Metal Equivalent
- Assumptions Disclosed
- Yes
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-13T00:00:00.000Z
Reasoning: Proven reserve component of the DFS.
Positive factors
- Part of DFS
Evidence · text
“56.04 million tonnes at 0.61g/t gold, 0.35% copper and 1.33g/t silver”
Tags used in scoring
Proven Reservepositive
Measured Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "proven"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
NI 43-101 Compliantpositive
Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.
Why it applies: reporting_standards includes ni_43_101
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.