# Koryx’s bigger Haib copper plan tops $2B

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/koryx-s-bigger-haib-copper-plan-tops-2b--2737a501-1a2a-4448-91f1-c72522799be6

Original source: https://www.northernminer.com/news/koryxs-bigger-haib-copper-plan-tops-2b/1003897957/

Publisher: northernminer

Original announcement: 2026-11-18T14:37:49.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-11-18T15:01:17.632Z

Atlas analysis updated: 2026-11-18T15:01:17.632Z

- Company: Koryx Copper

- Ticker: KRY

- Exchange: Unavailable

- Region: Namibia

- Primary commodity: Copper

- Secondary commodities: Molybdenum, Gold

- Document categories: Resource update, Other

- Extracted: 2026-11-18 14:48:00 UTC

Narrative sentiment: 0.60 · Bullish

## Minestarters Atlas summary

Koryx Copper has released its first prefeasibility study \(PFS\) for the Haib project in Namibia, reporting a probable reserve of 1.12 billion tonnes at 0.27% copper. The updated plan increases upfront CAPEX to $2.06 billion but significantly boosts annual payable copper output and project NPV.

Reasoning: The announcement of the first mineral reserve and a significantly improved PFS with higher production and NPV is a major de-risking milestone, despite the increased capital requirement.

- Positive factor: First mineral reserve reported

- Positive factor: Significant increase in annual payable copper output

- Positive factor: Improved NPV and IRR compared to previous assessment

- Positive factor: Lower life-of-project cash costs than analyst estimates

- Positive factor: Reduced strip ratio \(waste per tonne of ore\)

- Negative factor: Higher upfront CAPEX \($2.06B vs $1.56B\)

- Negative factor: Water supply risks related to Orange River flows

Facts used in scoring: 3

## Classification and evidence

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The study reports a probable reserve of 1.12 billion tonnes at 0.27% copper.

Evidence · text

> puts Haib’s probable reserve at 1.12 billion tonnes

**Maiden Resource**

Polarity: neutral

Definition: First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: The study provides Koryx its first mineral reserve at Haib.

Evidence · text

> The study gives Koryx its first mineral reserve at Haib

## Extracted facts

Stored fact records: 3. Some facts used in scoring do not have a stored record.

## Resource Estimates (3)

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/koryx-s-bigger-haib-copper-plan-tops-2b--2737a501-1a2a-4448-91f1-c72522799be6#fact-resource-facts-0)

Haib · copper

#### Identity

- Project: Haib
- Commodity: copper
- Region: namibia
- Reported Region: Namibia
- Ticker: KRY

#### Resource scope

- Estimate type: reserve
- Resource group id: resource:278700bf7d8d80a3f4a0
- Deposit or zone: Haib
- Mining method: open\_pit

#### Resource Data

- Category: probable
- Tonnes: 1120000000
- Grade: 0.27
- Grade Unit: %
- Contained Metal: 3
- Contained Unit: mt

#### Prior Estimate

- Resource Date: 2026-11-06

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-18T00:00:00.000Z

Reasoning: High materiality as it represents the project's first formal reserve declaration.

- Positive factor: First reserve reported

Evidence · text

> The Nov. 6 estimate puts Haib’s probable reserve at 1.12 billion tonnes at 0.27% copper

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No QP/CP Disclosure**

Polarity: negative

Definition: No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: no Qualified or Competent Person is named anywhere in the release

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/koryx-s-bigger-haib-copper-plan-tops-2b--2737a501-1a2a-4448-91f1-c72522799be6#fact-resource-facts-1)

Haib · molybdenum

#### Identity

- Project: Haib
- Commodity: molybdenum
- Region: namibia
- Reported Region: Namibia
- Ticker: KRY

#### Resource scope

- Estimate type: reserve
- Resource group id: resource:278700bf7d8d80a3f4a0
- Deposit or zone: Haib
- Mining method: open\_pit

#### Resource Data

- Category: probable
- Tonnes: 1120000000
- Grade: 58
- Grade Unit: ppm
- Contained Metal: 65000
- Contained Unit: t

#### Prior Estimate

- Resource Date: 2026-11-06

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-18T00:00:00.000Z

Reasoning: Secondary metal byproduct reported as part of the first reserve.

Evidence · text

> 58 parts per million molybdenum

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No QP/CP Disclosure**

Polarity: negative

Definition: No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: no Qualified or Competent Person is named anywhere in the release

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### probable

[Link to this fact](https://atlas-aws.minestarters.com/news/koryx-s-bigger-haib-copper-plan-tops-2b--2737a501-1a2a-4448-91f1-c72522799be6#fact-resource-facts-2)

Haib · gold

#### Identity

- Project: Haib
- Commodity: gold
- Region: namibia
- Reported Region: Namibia
- Ticker: KRY

#### Resource scope

- Estimate type: reserve
- Resource group id: resource:278700bf7d8d80a3f4a0
- Deposit or zone: Haib
- Mining method: open\_pit

#### Resource Data

- Category: probable
- Tonnes: 1120000000
- Grade: 0.02
- Grade Unit: g/t
- Contained Metal: 689000
- Contained Unit: oz

#### Prior Estimate

- Resource Date: 2026-11-06

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-11-18T00:00:00.000Z

Reasoning: Low grade gold byproduct included in the reserve estimate.

Evidence · text

> 0.02 g/t gold. The reserve contains about ... 689,000 oz. of gold.

#### Tags used in scoring

**Probable Reserve**

Polarity: positive

Definition: Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No QP/CP Disclosure**

Polarity: negative

Definition: No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: no Qualified or Competent Person is named anywhere in the release

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
