# Koryx Copper Seeks Re-Rating as Upsized Haib PFS Nears Completion

Canonical Atlas analysis: https://atlas-aws.minestarters.com/news/koryx-copper-seeks-re-rating-as-upsized-haib-pfs-nears-completion--e4123a03-5d9d-42ab-ac9d-2bcca45905ff

Original source: https://www.cruxinvestor.com/posts/koryx-copper-seeks-re-rating-as-upsized-haib-pfs-nears-completion

Publisher: cruxinvestor

Original announcement: 2026-10-23T00:00:00.000Z

Analysis by Minestarters Atlas

Atlas analysis published: 2026-10-23T10:31:52.151Z

Atlas analysis updated: 2026-10-23T10:31:52.151Z

- Company: Koryx Copper

- Ticker: KRY

- Exchange: Unavailable

- Region: Namibia

- Primary commodity: Copper

- Secondary commodities: Molybdenum, Gold

- Document categories: Other, Resource update, Drill results

- Extracted: 2026-10-23 10:17:24 UTC

Narrative sentiment: 0.60 · Bullish

## Minestarters Atlas summary

Koryx Copper expects to publish its Haib Pre-Feasibility Study \(PFS\) by the end of November 2026, which is anticipated to significantly outperform the 2025 Preliminary Economic Assessment. The updated study features an optimized 48 Mtpa all-mill flowsheet and benefits from newly secured power and water agreements.

Reasoning: The announcement details the upcoming Pre-Feasibility Study \(PFS\) for the Haib project, highlighting significant technical improvements and de-risking of infrastructure compared to the previous PEA.

- Positive factor: PFS expected to substantially beat 2025 PEA

- Positive factor: Infrastructure risks \(power and water\) de-risked via agreements with NamPower and NamWater

- Positive factor: Flowsheet optimization \(removing heap leach, adding CPF\) increases throughput to 48 Mtpa

- Positive factor: Large scale resource \(744 Mt Indicated\)

- Negative factor: Significant capital expenditure requirement \($1.5B - $2B\)

- Negative factor: Project financing remains the key risk

Facts used in scoring: 4

## Classification and evidence

**Resource Update**

Polarity: neutral

Definition: Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: The document discusses the upcoming PFS and references the March 2026 MRE.

Evidence · text

> The March 2026 Mineral Resource Estimate \(MRE\) stands at

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: A significant portion of the resource is in the Inferred category.

Evidence · text

> 579 million tonnes Inferred

## Extracted facts

Stored fact records: 4. Some facts used in scoring do not have a stored record.

## Drill Results (2)

### Fact 1

[Link to this fact](https://atlas-aws.minestarters.com/news/koryx-copper-seeks-re-rating-as-upsized-haib-pfs-nears-completion--e4123a03-5d9d-42ab-ac9d-2bcca45905ff#fact-drill-facts-2)

Haib · copper

Needs review: drill\_no\_hole\_id

#### Identity

- Project: Haib
- Commodity: copper
- Region: namibia
- Reported Region: namibia
- Ticker: KRY

#### Geometry

- Grade: 0.61
- Grade Unit: %
- Intercept: 74 m

#### Classification

- Sample Type: drill

#### QA/QC

- QA/QC Disclosed: Yes
- QA/QC Methods: standards, duplicates

#### Review

- Needs Review: Yes
- Review Reason: drill\_no\_hole\_id
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-10-23T00:00:00.000Z

Reasoning: Strong CuEq intercept reported in recent drilling.

- Positive factor: High grade intercept relative to resource grade

Evidence · text

> Recent holes include 74 metres at 0.61% CuEq

#### Tags used in scoring

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: qaqc\_disclosed is true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

### Fact 2

[Link to this fact](https://atlas-aws.minestarters.com/news/koryx-copper-seeks-re-rating-as-upsized-haib-pfs-nears-completion--e4123a03-5d9d-42ab-ac9d-2bcca45905ff#fact-drill-facts-3)

Haib · copper

Needs review: drill\_no\_hole\_id

#### Identity

- Project: Haib
- Commodity: copper
- Region: namibia
- Reported Region: namibia
- Ticker: KRY

#### Geometry

- Grade: 1.74
- Grade Unit: %
- Intercept: 8 m

#### Classification

- Sample Type: drill

#### QA/QC

- QA/QC Disclosed: Yes
- QA/QC Methods: standards, duplicates

#### Review

- Needs Review: Yes
- Review Reason: drill\_no\_hole\_id
- Interp. Status: scored
- Historical: No

#### Dates

- Event date: 2026-10-23T00:00:00.000Z

Reasoning: High grade component within a recent drill hole.

- Positive factor: High grade sub-interval

Evidence · text

> including 8 metres at 1.74% CuEq

#### Tags used in scoring

**QA/QC Disclosed**

Polarity: positive

Definition: Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods \(blanks, standards, duplicates\).

Why it applies: qaqc\_disclosed is true

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

## Resource Estimates (2)

### indicated

[Link to this fact](https://atlas-aws.minestarters.com/news/koryx-copper-seeks-re-rating-as-upsized-haib-pfs-nears-completion--e4123a03-5d9d-42ab-ac9d-2bcca45905ff#fact-resource-facts-0)

Haib Copper Project · copper

#### Identity

- Project: Haib Copper Project
- Commodity: copper
- Region: namibia
- Reported Region: Namibia
- Ticker: KRY

#### Resource scope

- Estimate type: resource
- Resource group id: resource:39e534f94a223e4b1002
- Deposit or zone: Haib
- Ownership percent: 100 %
- Resource basis: attributable

#### Resource Data

- Category: indicated
- Tonnes: 744000000
- Grade: 0.28
- Grade Unit: %

#### Prior Estimate

- Resource Date: 2026-03-01

#### Metal Equivalent

- Metal Eq. Grade: 0.32
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-23T00:00:00.000Z

Reasoning: Large indicated resource base providing significant project scale.

- Positive factor: Large scale indicated resource

Evidence · text

> The March 2026 Mineral Resource Estimate \(MRE\) stands at 744 million tonnes Indicated at 0.28% copper \(0.32% copper equivalent, or CuEq\)

#### Tags used in scoring

**Indicated Resource**

Polarity: positive

Definition: Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**No QP/CP Disclosure**

Polarity: negative

Definition: No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: no Qualified or Competent Person is named anywhere in the release

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

### inferred

[Link to this fact](https://atlas-aws.minestarters.com/news/koryx-copper-seeks-re-rating-as-upsized-haib-pfs-nears-completion--e4123a03-5d9d-42ab-ac9d-2bcca45905ff#fact-resource-facts-1)

Haib Copper Project · copper

#### Identity

- Project: Haib Copper Project
- Commodity: copper
- Region: namibia
- Reported Region: Namibia
- Ticker: KRY

#### Resource scope

- Estimate type: resource
- Resource group id: resource:d3f60cfc49ecf409e682
- Deposit or zone: Haib
- Ownership percent: 100 %
- Resource basis: attributable

#### Resource Data

- Category: inferred
- Tonnes: 579000000
- Grade: 0.24
- Grade Unit: %

#### Prior Estimate

- Resource Date: 2026-03-01

#### Metal Equivalent

- Metal Eq. Grade: 0.28
- Metal Eq. Unit: % CuEq
- Assumptions Disclosed: Yes

#### Review

- Needs Review: No
- Historical: No

#### Dates

- Event date: 2026-10-23T00:00:00.000Z

Reasoning: Substantial inferred resource adds to the overall project scale.

- Positive factor: Significant inferred tonnage

- Negative factor: Inferred category carries higher geological risk

Evidence · text

> and 579 million tonnes Inferred at 0.24% copper \(0.28% CuEq\)

#### Tags used in scoring

**Inferred Resource**

Polarity: negative

Definition: Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

**Cut-off Undisclosed**

Polarity: negative

Definition: High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff\_grade was stated

**No Contained Metal**

Polarity: negative

Definition: Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained\_metal was not reported

**No QP/CP Disclosure**

Polarity: negative

Definition: No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.

Why it applies: no Qualified or Competent Person is named anywhere in the release

**PEA-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

**PFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&amp;I component.

Why it applies: the release names the study this estimate supports

**DFS-Supporting**

Polarity: neutral

Definition: Resource estimate prepared to support a Definitive Feasibility Study — requires high M&amp;I confidence.

Why it applies: the release names the study this estimate supports

## How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.
