Summary

Koryx Copper announced strong Pre-Feasibility Study results for its Haib Copper Project in southern Namibia, highlighting a post-tax NPV8% of US$2.538 billion and a 24.9% post-tax IRR at base-case metal prices. The study outlines a 24-year mine life with average annual payable copper production of 130 ktpa for the first 10 years, supported by a US$2.059 billion upfront capital cost and competitive C1 cash costs of US$1.72/lb. The PFS also includes an updated Mineral Resource estimate and a maiden Probable Mineral Reserve of 1.119 billion tonnes at 0.27% Cu, containing 2.995 million tonnes of copper.

Reasoning: The Pre-Feasibility Study for the Haib Copper Project demonstrates robust economics with a US$2.538 billion post-tax NPV8% and a 24.9% post-tax IRR, supported by a large-scale conventional open-pit operation, significant copper production, and a maiden Probable Mineral Reserve, positioning it as a world-class development project.

Positive factors

  • Strong post-tax NPV8% of US$2.538 billion and post-tax IRR of 24.9% at base-case prices.
  • Significant average annual payable copper production of 130 ktpa for the first 10 years.
  • Competitive C1 cash costs of US$1.72/lb for the first 10 years.
  • Maiden Probable Mineral Reserve of 1.119 billion tonnes at 0.27% Cu, containing 2.995 million tonnes of copper.
  • Updated Mineral Resource estimate with 1.371 billion tonnes Indicated at 0.26% Cu.
  • Conventional open pit mining and sulphide processing route with high LOM copper recovery of 87.3%.
  • Extensive infrastructure planning for power, water, and tailings management.

Negative factors

  • High upfront capital cost of US$2.059 billion, which will require significant financing.
  • Project is still several years from production, with DFS completion targeted for 2027 and construction commencement in Q1 2028.

Low confidence — this extraction should be reviewed alongside the original source.

Facts used in scoring: 76

Atlas analysis — Koryx Copper: Koryx Copper Announces Pre-Feasibility Results for the Haib Copper Project, Southern Namibia. indicated 1371000000 tonnes; 89.5% recovery

Classification and evidence

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: The document presents the results of a Pre-Feasibility Study (PFS) for the Haib Copper Project, detailing economic viability, resource conversion, and technical parameters.

Evidence · text

“Koryx Copper Announces Pre-Feasibility Results for the Haib Copper Project, Southern Namibia”

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: The Mineral Resource estimate is signed off by Mr. J.C. Witley, and the Mineral Reserve estimate is signed off by Mr Werner K Moeller, both Qualified Persons as defined by NI 43-101.

Evidence · text

“The Qualified Person for the Mineral Resource estimate is Mr. J.C. Witley (BSc Hons, MSc (Eng.))”

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: The Mineral Resource and Reserve estimates are reported in accordance with NI 43-101 and CIM Definition Standards.

Evidence · text

“The Mineral Resource was estimated using the Canadian Institute of Mining, Metallurgy and Petroleum (" CIM ") Best Practice Guidelines and is reported in accordance with the 2014 CIM Definition Standards, which have been incorporated by reference into National Instrument 43-101”

Maiden Resourceneutral

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: The document announces a maiden ore reserve estimate for the Haib Copper Project.

Evidence · text

“Major project improvements comprise (i) the completion of a bigger and significantly higher-grade mineral resource and maiden ore reserve”

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The document declares Probable Mineral Reserves of approximately 1,119 Mt at 0.27% Cu.

Evidence · text

“As of 6 November 2026, the Haib Copper Project has Probable Mineral Reserves of approximately 1,119 Mt at 0.27% Cu”

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The Mineral Resource estimate includes 1,371 Mt of Indicated Resources at 0.26% Cu.

Evidence · table

“Indicated”

Context: Total

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The Mineral Resource estimate includes 329 Mt of Inferred Resources at 0.24% Cu.

Evidence · table

“Inferred”

Context: Total

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The Mineral Resource and Reserve estimates are reported at a 0.15% Cu cut-off.

Evidence · table

“0.15% Cu cut-off”

Context: Table 10: Mineral Resource Estimate for Haib as of 28 October 2026 at a 0.15% Cu cut-off

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: The processing route involves conventional sulphide milling and flotation.

Evidence · text

“conventional sulphide milling and flotation”

High Recoverypositive

Recovery at or above the exceptional band for the commodity and processing route.

Why it applies: Copper recovery for the first 10 years is 89.5%, which is above the strong band for flotation (88%).

Evidence · table

“89.5%”

Context: Copper Recovery (Milling & flotation)

Pilot Scale Completepositive

Pilot or demonstration plant testing completed under continuous operation.

Why it applies: Three bulk sulphide samples have been collected for pilot plant tests in 2027, indicating pilot scale work is planned.

Evidence · text

“three bulk sulphide samples of varying copper grades, have been collected from accessible portions of the resource, to be used in 2027 for pilot plant tests.”

Heap Leach Routeneutral

Processing via heap leach — lower CAPEX and OPEX, lower recovery expected.

Why it applies: the document describes a heap_leach route ("heap leach")

Single Domain Onlynegative

Testing limited to one composite or domain — representativeness not established.

Why it applies: only one composite was tested

Extracted facts

Stored fact records: 39. Some facts used in scoring do not have a stored record.

Resource Estimates (27)

indicatedHaib Copper ProjectTonnes: 1371000000Grade: 0.26Grade Unit: %Contained Metal: 3572Contained Unit: ktView all details
Link to this fact

Identity

Project
Haib Copper Project
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
J.C. Witley
Resource group id
resource:4125c60fb08c4fddfe85
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
indicated
Tonnes
1371000000
Grade
0.26
Grade Unit
%
Contained Metal
3572
Contained Unit
kt
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-10-28

Metal Equivalent

Metal Eq. Grade
0.28
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The updated Indicated Mineral Resource demonstrates substantial geological confidence and scale, forming a robust basis for the project's economic studies.

Positive factors

  • Large Indicated Mineral Resource of 1.371 billion tonnes provides a strong foundation for future mine planning and reserve conversion.
  • Contained copper of 3,572 kt highlights the significant scale of the deposit.
  • Resource is NI 43-101 compliant and signed off by a Qualified Person.

Evidence · table

“1,371”

Context: Total

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedHaib Copper Project · molybdenumTonnes: 1371000000Grade: 59Grade Unit: ppmContained Metal: 81Contained Unit: ktView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
molybdenum
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
J.C. Witley
Resource group id
resource:4125c60fb08c4fddfe85
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
indicated
Tonnes
1371000000
Grade
59
Grade Unit
ppm
Contained Metal
81
Contained Unit
kt
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-10-28

Metal Equivalent

Metal Eq. Grade
0.28
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Molybdenum as a byproduct enhances the overall economic value of the resource, contributing to diversified revenue.

Positive factors

  • Indicated molybdenum grade of 59 ppm and contained metal of 81 kt provide significant byproduct potential.

Evidence · table

“59”

Context: Total

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedHaib Copper Project · goldTonnes: 1371000000Grade: 0.02Grade Unit: g/tContained Metal: 892Contained Unit: kozView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
gold
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
J.C. Witley
Resource group id
resource:4125c60fb08c4fddfe85
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
indicated
Tonnes
1371000000
Grade
0.02
Grade Unit
g/t
Contained Metal
892
Contained Unit
koz
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-10-28

Metal Equivalent

Metal Eq. Grade
0.28
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Gold as a byproduct further strengthens the resource's economic profile and revenue potential.

Positive factors

  • Indicated gold grade of 0.02 g/t and contained metal of 892 koz provide additional byproduct credits.

Evidence · table

“0.02”

Context: Total

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedHaib Copper Project · copperTonnes: 577000000Grade: 0.36Grade Unit: %Contained Metal: 2070Contained Unit: ktView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
copper
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
J.C. Witley
Resource group id
resource:7d7cf0b24539c74f5ed6
Deposit or zone
Total High Grade (>0.25% Cu)
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
indicated
Tonnes
577000000
Grade
0.36
Grade Unit
%
Contained Metal
2070
Contained Unit
kt
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-10-28

Metal Equivalent

Metal Eq. Grade
0.39
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Prioritizing high-grade material early can improve project economics and accelerate capital payback.

Positive factors

  • High-grade Indicated resource of 577 Mt at 0.36% Cu provides a significant portion of higher-value material for early mine life.

Evidence · table

“577”

Context: Total High Grade (>0.25% Cu)

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedHaib Copper Project · molybdenumTonnes: 577000000Grade: 72Grade Unit: ppmContained Metal: 42Contained Unit: ktView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
molybdenum
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
J.C. Witley
Resource group id
resource:7d7cf0b24539c74f5ed6
Deposit or zone
Total High Grade (>0.25% Cu)
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
indicated
Tonnes
577000000
Grade
72
Grade Unit
ppm
Contained Metal
42
Contained Unit
kt
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-10-28

Metal Equivalent

Metal Eq. Grade
0.39
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Increased byproduct grades in higher-grade zones contribute more significantly to overall project revenue.

Positive factors

  • Higher molybdenum grade of 72 ppm in the high-grade Indicated resource enhances byproduct value.

Evidence · table

“72”

Context: Total High Grade (>0.25% Cu)

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedHaib Copper Project · goldTonnes: 577000000Grade: 0.02Grade Unit: g/tContained Metal: 427Contained Unit: kozView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
gold
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
J.C. Witley
Resource group id
resource:7d7cf0b24539c74f5ed6
Deposit or zone
Total High Grade (>0.25% Cu)
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
indicated
Tonnes
577000000
Grade
0.02
Grade Unit
g/t
Contained Metal
427
Contained Unit
koz
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-10-28

Metal Equivalent

Metal Eq. Grade
0.39
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Gold byproduct credits from higher-grade zones further improve the project's economic attractiveness.

Positive factors

  • Gold content of 427 koz in the high-grade Indicated resource adds significant byproduct value.

Evidence · table

“0.02”

Context: Total High Grade (>0.25% Cu)

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedHaib Copper Project · copperTonnes: 793000000Grade: 0.19Grade Unit: %Contained Metal: 1502Contained Unit: ktView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
copper
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
J.C. Witley
Resource group id
resource:faec8b9142b513952627
Deposit or zone
Total Low Grade (0.15-0.25% Cu)
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
indicated
Tonnes
793000000
Grade
0.19
Grade Unit
%
Contained Metal
1502
Contained Unit
kt
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-10-28

Metal Equivalent

Metal Eq. Grade
0.21
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The low-grade material contributes to the overall scale and mine life, potentially becoming economic with improved prices or processing.

Positive factors

  • Large low-grade Indicated resource of 793 Mt at 0.19% Cu provides significant optionality for future processing, especially with low strip ratio.

Evidence · table

“793”

Context: Total Low Grade (0.15-0.25% Cu)

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedHaib Copper Project · molybdenumTonnes: 793000000Grade: 49Grade Unit: ppmContained Metal: 39Contained Unit: ktView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
molybdenum
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
J.C. Witley
Resource group id
resource:faec8b9142b513952627
Deposit or zone
Total Low Grade (0.15-0.25% Cu)
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
indicated
Tonnes
793000000
Grade
49
Grade Unit
ppm
Contained Metal
39
Contained Unit
kt
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-10-28

Metal Equivalent

Metal Eq. Grade
0.21
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Even lower-grade material contributes to byproduct credits, enhancing the resource's overall value.

Positive factors

  • Molybdenum content in the low-grade Indicated resource adds to overall byproduct potential.

Evidence · table

“49”

Context: Total Low Grade (0.15-0.25% Cu)

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

indicatedHaib Copper Project · goldTonnes: 793000000Grade: 0.02Grade Unit: g/tContained Metal: 465Contained Unit: kozView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
gold
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
J.C. Witley
Resource group id
resource:faec8b9142b513952627
Deposit or zone
Total Low Grade (0.15-0.25% Cu)
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
indicated
Tonnes
793000000
Grade
0.02
Grade Unit
g/t
Contained Metal
465
Contained Unit
koz
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-10-28

Metal Equivalent

Metal Eq. Grade
0.21
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Even lower-grade material contributes to byproduct credits, enhancing the resource's overall value.

Positive factors

  • Gold content in the low-grade Indicated resource adds to overall byproduct potential.

Evidence · table

“0.02”

Context: Total Low Grade (0.15-0.25% Cu)

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredHaib Copper Project · copperTonnes: 329000000Grade: 0.24Grade Unit: %Contained Metal: 781Contained Unit: ktView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
copper
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
J.C. Witley
Resource group id
resource:e473dda54cdd349ad4fe
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
inferred
Tonnes
329000000
Grade
0.24
Grade Unit
%
Contained Metal
781
Contained Unit
kt
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-10-28

Metal Equivalent

Metal Eq. Grade
0.26
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The Inferred resource adds to the overall scale of the deposit and represents future growth potential, though it requires further de-risking.

Positive factors

  • Large Inferred Mineral Resource of 329 Mt at 0.24% Cu provides significant exploration upside and potential for future conversion to higher confidence categories.

Negative factors

  • Inferred resources have lower geological confidence and cannot be used for economic studies without further drilling.

Evidence · table

“329”

Context: Total

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredHaib Copper Project · molybdenumTonnes: 329000000Grade: 41Grade Unit: ppmContained Metal: 13Contained Unit: ktView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
molybdenum
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
J.C. Witley
Resource group id
resource:e473dda54cdd349ad4fe
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
inferred
Tonnes
329000000
Grade
41
Grade Unit
ppm
Contained Metal
13
Contained Unit
kt
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-10-28

Metal Equivalent

Metal Eq. Grade
0.26
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Byproduct credits from the Inferred resource contribute to the overall potential value of the deposit.

Positive factors

  • Molybdenum content in the Inferred resource adds to overall byproduct potential.

Evidence · table

“41”

Context: Total

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredHaib Copper Project · goldTonnes: 329000000Grade: 0.02Grade Unit: g/tContained Metal: 178Contained Unit: kozView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
gold
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
J.C. Witley
Resource group id
resource:e473dda54cdd349ad4fe
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
inferred
Tonnes
329000000
Grade
0.02
Grade Unit
g/t
Contained Metal
178
Contained Unit
koz
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-10-28

Metal Equivalent

Metal Eq. Grade
0.26
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Byproduct credits from the Inferred resource contribute to the overall potential value of the deposit.

Positive factors

  • Gold content in the Inferred resource adds to overall byproduct potential.

Evidence · table

“0.02”

Context: Total

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredHaib Copper Project · copperTonnes: 107000000Grade: 0.34Grade Unit: %Contained Metal: 368Contained Unit: ktView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
copper
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
J.C. Witley
Resource group id
resource:9cfa4dc8f52928936526
Deposit or zone
Total High Grade (>0.25% Cu)
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
inferred
Tonnes
107000000
Grade
0.34
Grade Unit
%
Contained Metal
368
Contained Unit
kt
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-10-28

Metal Equivalent

Metal Eq. Grade
0.36
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: High-grade Inferred material offers attractive targets for infill drilling to convert to Indicated and potentially Reserves.

Positive factors

  • High-grade Inferred resource of 107 Mt at 0.34% Cu represents significant potential for future resource upgrades and economic contribution.

Evidence · table

“107”

Context: Total High Grade (>0.25% Cu)

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredHaib Copper Project · molybdenumTonnes: 107000000Grade: 48Grade Unit: ppmContained Metal: 5Contained Unit: ktView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
molybdenum
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
J.C. Witley
Resource group id
resource:9cfa4dc8f52928936526
Deposit or zone
Total High Grade (>0.25% Cu)
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
inferred
Tonnes
107000000
Grade
48
Grade Unit
ppm
Contained Metal
5
Contained Unit
kt
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-10-28

Metal Equivalent

Metal Eq. Grade
0.36
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Byproduct credits from high-grade Inferred material contribute to the overall potential value.

Positive factors

  • Molybdenum content in the high-grade Inferred resource adds to byproduct potential.

Evidence · table

“48”

Context: Total High Grade (>0.25% Cu)

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredHaib Copper Project · goldTonnes: 107000000Grade: 0.02Grade Unit: g/tContained Metal: 63Contained Unit: kozView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
gold
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
J.C. Witley
Resource group id
resource:9cfa4dc8f52928936526
Deposit or zone
Total High Grade (>0.25% Cu)
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
inferred
Tonnes
107000000
Grade
0.02
Grade Unit
g/t
Contained Metal
63
Contained Unit
koz
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-10-28

Metal Equivalent

Metal Eq. Grade
0.36
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Byproduct credits from high-grade Inferred material contribute to the overall potential value.

Positive factors

  • Gold content in the high-grade Inferred resource adds to byproduct potential.

Evidence · table

“0.02”

Context: Total High Grade (>0.25% Cu)

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredHaib Copper Project · copperTonnes: 222000000Grade: 0.19Grade Unit: %Contained Metal: 414Contained Unit: ktView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
copper
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
J.C. Witley
Resource group id
resource:9418ddb4979f7fafbe57
Deposit or zone
Total Low Grade (0.15-0.25% Cu)
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
inferred
Tonnes
222000000
Grade
0.19
Grade Unit
%
Contained Metal
414
Contained Unit
kt
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-10-28

Metal Equivalent

Metal Eq. Grade
0.2
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: This material represents future potential, which could become economic with further exploration or improved market conditions.

Positive factors

  • Low-grade Inferred resource of 222 Mt at 0.19% Cu adds to the overall scale and long-term potential of the deposit.

Evidence · table

“222”

Context: Total Low Grade (0.15-0.25% Cu)

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredHaib Copper Project · molybdenumTonnes: 222000000Grade: 37Grade Unit: ppmContained Metal: 8Contained Unit: ktView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
molybdenum
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
J.C. Witley
Resource group id
resource:9418ddb4979f7fafbe57
Deposit or zone
Total Low Grade (0.15-0.25% Cu)
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
inferred
Tonnes
222000000
Grade
37
Grade Unit
ppm
Contained Metal
8
Contained Unit
kt
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-10-28

Metal Equivalent

Metal Eq. Grade
0.2
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Byproduct credits from low-grade Inferred material contribute to the overall potential value.

Positive factors

  • Molybdenum content in the low-grade Inferred resource adds to byproduct potential.

Evidence · table

“37”

Context: Total Low Grade (0.15-0.25% Cu)

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

inferredHaib Copper Project · goldTonnes: 222000000Grade: 0.02Grade Unit: g/tContained Metal: 115Contained Unit: kozView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
gold
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
resource
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
J.C. Witley
Resource group id
resource:9418ddb4979f7fafbe57
Deposit or zone
Total Low Grade (0.15-0.25% Cu)
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
inferred
Tonnes
222000000
Grade
0.02
Grade Unit
g/t
Contained Metal
115
Contained Unit
koz
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-10-28

Metal Equivalent

Metal Eq. Grade
0.2
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Byproduct credits from low-grade Inferred material contribute to the overall potential value.

Positive factors

  • Gold content in the low-grade Inferred resource adds to byproduct potential.

Evidence · table

“0.02”

Context: Total Low Grade (0.15-0.25% Cu)

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableHaib Copper Project · copperTonnes: 1119000000Grade: 0.27Grade Unit: %Contained Metal: 2995Contained Unit: ktView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
copper
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
reserve
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Werner K Moeller
Resource group id
resource:7a372b98c41e40263940
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
probable
Tonnes
1119000000
Grade
0.27
Grade Unit
%
Contained Metal
2995
Contained Unit
kt
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-11-06

Metal Equivalent

Metal Eq. Grade
0.29
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The declaration of a substantial Probable Mineral Reserve confirms the economic viability of the project and provides confidence for future development and financing.

Positive factors

  • Maiden Probable Mineral Reserve of 1.119 billion tonnes at 0.27% Cu is a significant de-risking milestone for the project.
  • Contained copper of 2,995 kt provides a robust basis for long-term production.
  • Reserve is NI 43-101 compliant and signed off by a Qualified Person.

Evidence · table

“1 119”

Context: Total Mineral Reserve

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableHaib Copper Project · molybdenumTonnes: 1119000000Grade: 58Grade Unit: ppmContained Metal: 65Contained Unit: ktView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
molybdenum
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
reserve
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Werner K Moeller
Resource group id
resource:7a372b98c41e40263940
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
probable
Tonnes
1119000000
Grade
58
Grade Unit
ppm
Contained Metal
65
Contained Unit
kt
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-11-06

Metal Equivalent

Metal Eq. Grade
0.29
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Molybdenum as a byproduct enhances the overall economic viability of the reserve, contributing to diversified revenue.

Positive factors

  • Molybdenum grade of 58 ppm and contained metal of 65 kt in the Probable Reserve provide significant byproduct credits.

Evidence · table

“58”

Context: Total Mineral Reserve

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableHaib Copper Project · goldTonnes: 1119000000Grade: 0.02Grade Unit: g/tContained Metal: 689Contained Unit: kozView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
gold
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
reserve
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Werner K Moeller
Resource group id
resource:7a372b98c41e40263940
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
probable
Tonnes
1119000000
Grade
0.02
Grade Unit
g/t
Contained Metal
689
Contained Unit
koz
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-11-06

Metal Equivalent

Metal Eq. Grade
0.29
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Gold as a byproduct further strengthens the reserve's economic profile and revenue potential.

Positive factors

  • Gold grade of 0.02 g/t and contained metal of 689 koz in the Probable Reserve provide additional byproduct credits.

Evidence · table

“0.02”

Context: Total Mineral Reserve

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableHaib Copper Project · copperTonnes: 561000000Grade: 0.34Grade Unit: %Contained Metal: 1895Contained Unit: ktView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
copper
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
reserve
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Werner K Moeller
Resource group id
resource:2d808aeba387884d7805
Deposit or zone
Total High Grade (>0.25% Cu)
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
probable
Tonnes
561000000
Grade
0.34
Grade Unit
%
Contained Metal
1895
Contained Unit
kt
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-11-06

Metal Equivalent

Metal Eq. Grade
0.37
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Prioritizing high-grade material in the reserve schedule can improve project economics and accelerate capital payback.

Positive factors

  • High-grade Probable Reserve of 561 Mt at 0.34% Cu provides a significant portion of higher-value material for early mine life, enhancing project economics.

Evidence · table

“561”

Context: Total High Grade (>0.25% Cu)

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableHaib Copper Project · molybdenumTonnes: 561000000Grade: 67Grade Unit: ppmContained Metal: 38Contained Unit: ktView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
molybdenum
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
reserve
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Werner K Moeller
Resource group id
resource:2d808aeba387884d7805
Deposit or zone
Total High Grade (>0.25% Cu)
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
probable
Tonnes
561000000
Grade
67
Grade Unit
ppm
Contained Metal
38
Contained Unit
kt
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-11-06

Metal Equivalent

Metal Eq. Grade
0.37
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Increased byproduct grades in higher-grade reserve zones contribute more significantly to overall project revenue.

Positive factors

  • Higher molybdenum grade of 67 ppm in the high-grade Probable Reserve enhances byproduct value.

Evidence · table

“67”

Context: Total High Grade (>0.25% Cu)

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableHaib Copper Project · goldTonnes: 561000000Grade: 0.02Grade Unit: g/tView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
gold
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
reserve
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Werner K Moeller
Resource group id
resource:2d808aeba387884d7805
Deposit or zone
Total High Grade (>0.25% Cu)
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
probable
Tonnes
561000000
Grade
0.02
Grade Unit
g/t
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-11-06

Metal Equivalent

Metal Eq. Grade
0.37
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Gold byproduct credits from higher-grade reserve zones further improve the project's economic attractiveness.

Positive factors

  • Gold content in the high-grade Probable Reserve adds significant byproduct value.

Evidence · table

“0.02”

Context: Total High Grade (>0.25% Cu)

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableHaib Copper Project · copperTonnes: 557000000Grade: 0.2Grade Unit: %Contained Metal: 1101Contained Unit: ktView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
copper
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
reserve
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Werner K Moeller
Resource group id
resource:0c447c7ac1f4154cf28a
Deposit or zone
Total Low Grade (0.15-0.25% Cu)
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
probable
Tonnes
557000000
Grade
0.2
Grade Unit
%
Contained Metal
1101
Contained Unit
kt
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-11-06

Metal Equivalent

Metal Eq. Grade
0.22
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: The low-grade material in the reserve contributes to the overall scale and mine life, providing flexibility in production scheduling.

Positive factors

  • Large low-grade Probable Reserve of 557 Mt at 0.20% Cu provides significant optionality for future processing, especially with a low strip ratio.

Evidence · table

“557”

Context: Total Low Grade (0.15-0.25% Cu)

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableHaib Copper Project · molybdenumTonnes: 557000000Grade: 48Grade Unit: ppmContained Metal: 27Contained Unit: ktView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
molybdenum
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
reserve
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Werner K Moeller
Resource group id
resource:0c447c7ac1f4154cf28a
Deposit or zone
Total Low Grade (0.15-0.25% Cu)
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
probable
Tonnes
557000000
Grade
48
Grade Unit
ppm
Contained Metal
27
Contained Unit
kt
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-11-06

Metal Equivalent

Metal Eq. Grade
0.22
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Byproduct credits from lower-grade reserve material enhance the reserve's overall value.

Positive factors

  • Molybdenum content in the low-grade Probable Reserve adds to overall byproduct potential.

Evidence · table

“48”

Context: Total Low Grade (0.15-0.25% Cu)

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

probableHaib Copper Project · goldTonnes: 557000000Grade: 0.02Grade Unit: g/tView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
gold
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Resource scope

Estimate type
reserve
Reporting standards
ni_43_101
QP Signed
Yes
Qualified person names
Werner K Moeller
Resource group id
resource:0c447c7ac1f4154cf28a
Deposit or zone
Total Low Grade (0.15-0.25% Cu)
Mining method
open_pit
Ownership percent
100 %
Resource basis
attributable

Resource Data

Category
probable
Tonnes
557000000
Grade
0.02
Grade Unit
g/t
Cutoff Grade
0.15
Cutoff Unit
% Cu

Prior Estimate

Resource Date
2026-11-06

Metal Equivalent

Metal Eq. Grade
0.22
Metal Eq. Unit
% CuEq
Assumptions Disclosed
Yes

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Byproduct credits from lower-grade reserve material enhance the reserve's overall value.

Positive factors

  • Gold content in the low-grade Probable Reserve adds to overall byproduct potential.

Evidence · table

“0.02”

Context: Total Low Grade (0.15-0.25% Cu)

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

NI 43-101 Compliantpositive

Resource estimate prepared in compliance with NI 43-101 (Canada) — high reporting standard.

Why it applies: reporting_standards includes ni_43_101

No Contained Metalnegative

Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.

Why it applies: contained_metal was not reported

Resource Updateneutral

Revised estimate for an existing resource — compare to prior to assess progress.

Why it applies: the release compares against a previous estimate

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Metallurgical Results (12)

Fact 1Haib Copper Project · copperView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
copper
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Recovery

Conc. Grade
21.8
Conc. Grade Unit
% Cu

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: A high-quality concentrate reduces treatment and refining charges, improving net smelter returns.

Positive factors

  • LOM concentrate grade of 21.8% Cu is a good quality concentrate, generally acceptable to smelters.

Evidence · table

“21.8%”

Context: Concentrate grade

Tags used in scoring

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

flotationHaib Copper Project · copperRecovery: 89.5 %View all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
copper
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Test Work

Program Status
detailed
Test Type
flotation
Processing Route
Milling & flotation

Recovery

Recovery
89.5 %
Recovery Basis
actual_test

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Excellent copper recovery in the early years significantly boosts project revenue and profitability, indicating efficient processing.

Positive factors

  • High copper recovery of 89.5% for the first 10 years is excellent for a porphyry copper project using milling and flotation.
  • This recovery is above the strong band for flotation (88%).

Evidence · table

“89.5%”

Context: Copper Recovery (Milling & flotation)

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

flotationHaib Copper Project · copperRecovery: 87.3 %View all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
copper
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Test Work

Program Status
detailed
Test Type
flotation
Processing Route
Milling & flotation

Recovery

Recovery
87.3 %
Recovery Basis
actual_test

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Consistent high copper recovery over the life-of-mine ensures efficient metal extraction and sustained revenue generation.

Positive factors

  • Strong LOM copper recovery of 87.3% is very good for a porphyry copper project using milling and flotation.
  • This recovery is within the moderate band for flotation (85%).

Evidence · table

“87.3%”

Context: Copper Recovery (Milling & flotation)

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

flotationHaib Copper Project · copperView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
copper
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Test Work

Program Status
detailed
Test Type
flotation
Processing Route
conventional copper sulphide processing route using three-stage crushing (including HPGR), ball milling with coarse gangue rejection of 25% of ROM mill feed, followed by a common hybrid Jameson and Tank Cell flotation circuit configuration

Recovery

Conc. Grade
21.8
Conc. Grade Unit
% Cu

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Producing a high-quality concentrate is crucial for minimizing treatment and refining charges and maximizing net smelter returns.

Positive factors

  • Concentrate grade of 21.8% Cu is a good quality concentrate, generally acceptable to smelters, which helps optimize revenue.

Evidence · text

“bulk concentrate grading 21.8% Cu”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

flotationHaib Copper Project · copperView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
copper
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Test Work

Program Status
detailed
Test Type
flotation
Processing Route
conventional copper sulphide processing route using three-stage crushing (including HPGR), ball milling with coarse gangue rejection of 25% of ROM mill feed, followed by a common hybrid Jameson and Tank Cell flotation circuit configuration
Grind P80
150 µm

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: An optimized primary grind size balances liberation requirements with energy consumption, contributing to efficient processing.

Positive factors

  • Primary grind of 80% passing 150 µm is a common and achievable grind size for copper flotation, ensuring adequate liberation.

Evidence · text

“primary grind to 80% passing 150 µm”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

flotationHaib Copper Project · copperView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
copper
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Test Work

Program Status
detailed
Test Type
flotation
Processing Route
conventional copper sulphide processing route using three-stage crushing (including HPGR), ball milling with coarse gangue rejection of 25% of ROM mill feed, followed by a common hybrid Jameson and Tank Cell flotation circuit configuration
Grind P80
25 µm

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Fine regrinding of rougher concentrate is essential for achieving high concentrate grades and recoveries in subsequent cleaner stages.

Positive factors

  • Rougher concentrate regrind to 80% passing 15-25 µm is a fine grind, indicating good liberation for cleaner flotation and high recovery.

Evidence · text

“regrind to 80% passing 15 - 25 µm”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

coarse particle flotationHaib Copper Project · copperView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
copper
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Test Work

Program Status
detailed
Test Type
coarse particle flotation
Processing Route
coarse gangue rejection (CGR)

Recovery

Mass Pull
25 %

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: CGR improves overall plant efficiency by removing barren material early, leading to lower energy consumption and higher effective feed grade to flotation.

Positive factors

  • Coarse gangue rejection (CGR) of 25% of ROM mill feed is a positive innovation, reducing downstream processing load and costs.

Evidence · text

“coarse gangue rejection of 25% of ROM mill feed”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

locked-cycleHaib Copper Project · copperRecovery: 90.9 %View all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
copper
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Test Work

Program Status
detailed
Test Type
locked-cycle
Processing Route
flotation

Recovery

Recovery
90.9 %
Recovery Basis
actual_test
Conc. Grade
24.7
Conc. Grade Unit
% Cu

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Locked-cycle test results confirm robust metallurgical performance, providing high confidence in projected recoveries and concentrate quality.

Positive factors

  • Excellent average copper recovery of 90.9% from locked-cycle tests indicates high metallurgical efficiency.
  • High average final concentrate copper grade of 24.7% is very good, enhancing marketability and reducing penalties.

Evidence · text

“copper recovery ranging from 85 - 93% and 90.9% on average at an average final concentrate copper grade of 24.7%”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

locked-cycleHaib Copper Project · molybdenumRecovery: 45 %View all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
molybdenum
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Test Work

Program Status
detailed
Test Type
locked-cycle
Processing Route
flotation

Recovery

Recovery
45 %
Recovery Basis
actual_test
Conc. Grade
0.5
Conc. Grade Unit
% Mo

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Byproduct molybdenum recovery contributes positively to the project's revenue streams and economic robustness.

Positive factors

  • Molybdenum recovery of 45% provides valuable byproduct credits, enhancing overall project economics.

Evidence · text

“Molybdenum recovery averaged 45% with an average Mo grade of 0.5% in the final copper concentrate.”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

locked-cycleHaib Copper Project · goldView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
gold
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Test Work

Program Status
detailed
Test Type
locked-cycle
Processing Route
flotation

Recovery

Conc. Grade
1.5
Conc. Grade Unit
g/t

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Gold as a byproduct adds to the project's economic resilience and overall value proposition.

Positive factors

  • Gold grades in the final concentrate (0.6 to 1.5 g/t) provide additional byproduct credits, further diversifying revenue.

Evidence · text

“The final concentrate Au grade ranged from 0.6 to 1.5 g/t”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

locked-cycleHaib Copper Project · silverView all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
silver
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Test Work

Program Status
detailed
Test Type
locked-cycle
Processing Route
flotation

Recovery

Conc. Grade
44
Conc. Grade Unit
g/t

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Silver as a minor byproduct contributes to the overall metal value recovered, though not a primary driver.

Positive factors

  • Silver grades in the final concentrate (22 to 44 g/t) offer minor additional byproduct credits.

Evidence · text

“silver grades ranged from 22 to 44 g/t.”

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

milling and flotationHaib Copper Project · copperRecovery: 60 %View all details
Link to this fact

Identity

Project
Haib Copper Project
Commodity
copper
Region
namibia
Reported Region
Southern Namibia
Ticker
KRY

Test Work

Program Status
detailed
Test Type
milling and flotation
Processing Route
milling and flotation
Sample
Oxide Stockpile

Recovery

Recovery
60 %
Recovery Basis
assumed

Review

Needs Review
No
Historical
No

Dates

Event date
2026-11-17T00:00:00.000Z

Reasoning: Processing oxide material extends the mine life and adds to total metal production, but the recovery assumption needs validation.

Positive factors

  • Assumed 60% copper recovery from oxide stockpile provides a plan for processing this material at end-of-mine life, adding to overall metal production.

Negative factors

  • This recovery is assumed and requires confirmatory test work.

Evidence · table

“60%”

Context: Oxide Stockpile (final two years)

Tags used in scoring

Mill Routeneutral

Processing via mill or concentrator (CIL, CIP, tank leach, flotation).

Why it applies: processing_route matches the flotation signal

Low Recoverynegative

Recovery below the weak band for the commodity and processing route.

Why it applies: 60% is below the weak band (80%)

Byproduct Commodityneutral

The tested commodity is a byproduct rather than the primary economic driver.

Why it applies: the release describes a byproduct credit

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.