KLR: Quarterly Activities/Appendix 5B Cash Flow Report
Original announcement by asx on
- Company
- Kaili Resources Limited
- Ticker
- KLR
- Exchange
- ASX
- Region
- South Australia
- Primary commodity
- Unavailable
- Secondary commodities
- None reported
- Document categories
- Drill results, Other
- Extracted
- 2026-10-29 05:31:22 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Kaili Resources Limited announced new rare earth element (REE) drill results from its Coodalya tenement in South Australia, with a highlight of 1m at 1,125.51 ppm TREO. The company is conducting early-stage exploration to identify areas for more focused drilling within its Limestone Coast projects. The quarterly activities report also included a positive net cash flow from operating activities.
Reasoning: Kaili Resources reported new, early-stage drill results confirming rare earth element mineralization with some encouraging grades, supported by JORC compliance and laboratory assays. The quarterly activities also showed a positive cash flow from operations.
Positive factors
- New drill results confirm rare earth element mineralization.
- Highest intercept of 1m at 1,125.51 ppm TREO is encouraging for early-stage exploration.
- Exploration results are reported in accordance with JORC Code 2012.
- The company reported a net cash inflow from operating activities for the quarter.
Negative factors
- Drilling is widely spaced, indicating early-stage exploration rather than resource definition.
- No true width or drill orientation information is provided for the reported intercepts.
- No specific QA/QC methods (blanks, standards, duplicates) are disclosed in this document.
Facts used in scoring: 4

Classification and evidence
QA/QC Disclosedpositive
Release includes QA/QC disclosure — certified lab, QP sign-off, or stated methods (blanks, standards, duplicates).
Why it applies: The report states that exploration results are based on information compiled by a Competent Person (Mr Mark Derriman) and that samples were submitted to ALS Laboratory for analysis.
Evidence · text
“The information in the report above that relates to Exploration Results, Exploration Targets and Mineral Resources is based on information compiled by Mr Mark Derriman, who is the Company’s Consultant Geologist and a member of The Australian Institute of Geoscientists (1566). Mr Mark Derriman has sufficient experience that is relevant to the style of mineralization and type of deposit under consideration and to the activities which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Exploration Targets, Mineral Resources and Ore Reserves. Mr Mark Derriman consents to the inclusion in this report of matters based on his information in the form and context in which it appears.”
Apparent Width Onlynegative
Interval given as downhole width with no true width or drill orientation — apparent width may overstate true thickness.
Why it applies: The reported intercepts are given as downhole lengths (1m) without any mention of true width or drill orientation relative to mineralization.
Evidence · text
“26CDAC023 15-16m, 1m@ 1,125.51”
Exploration Drillingneutral · Story-specific tag
No canonical definition is currently available.
Why it applies: The drilling campaign is described as 'widely spaced along road verges' to 'get an overview on likely locations of concentration of REEs before planning closer spaced drill holes'.
Evidence · text
“For exploration costs management the drill holes were widely spaced along road verges spread over almost the whole area (1,989 km2) of the 3 tenements to get an overview on likely locations of concentration of REEs before planning closer spaced drill holes then possibly grid based drilling to better assess the resource potential.”
Bonanza Interceptpositive
Exceptionally high-grade zone, well above the deposit-type norm.
Why it applies: The intercept of 1m at 1,125.51 ppm TREO is considered a high grade for early-stage ionic clay rare earth element deposits.
Evidence · text
“26CDAC023 15-16m, 1m@ 1,125.51”
JORC Compliantpositive · Story-specific tag
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: The report explicitly states that exploration results are reported in accordance with the 2012 JORC Code.
Evidence · text
“This Quarterly Activities Report contains information extracted from the Company’s ASX market announcements reported in accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (2012 JORC Code).”
Extracted facts
Stored fact records: 4. Some facts used in scoring do not have a stored record.
Drill Results (4)
26CDAC023Coodalya · rare_earthsGrade: 1125.51Grade Unit: ppm TREOIntercept: 1 mView all detailsHide details
Identity
- Hole ID
- 26CDAC023
- Project
- Coodalya
- Commodity
- rare_earths
- Region
- australia_sa
- Reported Region
- australia_sa
- Ticker
- KLR
Geometry
- Grade
- 1125.51
- Grade Unit
- ppm TREO
- Intercept
- 1 m
- From
- 15 m
- To
- 16 m
- Hole Depth
- 18 m
- Intercept Depth
- 15 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- 26CDAC023:15-16
Location
- Location
- Mallee Project
- Easting
- 407094
- Northing
- 6131080
- Elevation
- 62 m
- Azimuth
- 0 °
- Dip
- -90 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- ALS Laboratory
- QP Signed
- Yes
- QA/QC Methods
- standards
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept shows a strong rare earth element grade for early-stage exploration in an ionic clay deposit, confirming mineralization in the Mallee Project area.
Positive factors
- High TREO grade for early-stage ionic clay REE exploration.
- Confirms rare earth element mineralization in the target area.
Negative factors
- Early-stage exploration with widely spaced drilling.
- No true width reported for the intercept.
Evidence · text
“26CDAC023 15-16m, 1m@ 1,125.51”
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
26CDAC023Coodalya · rare_earthsGrade: 350.23Grade Unit: ppm TREOIntercept: 1 mView all detailsHide details
Identity
- Hole ID
- 26CDAC023
- Project
- Coodalya
- Commodity
- rare_earths
- Region
- australia_sa
- Reported Region
- australia_sa
- Ticker
- KLR
Geometry
- Grade
- 350.23
- Grade Unit
- ppm TREO
- Intercept
- 1 m
- From
- 16 m
- To
- 17 m
- Hole Depth
- 18 m
- Intercept Depth
- 15 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- 26CDAC023:16-17
Location
- Location
- Mallee Project
- Easting
- 407094
- Northing
- 6131080
- Elevation
- 62 m
- Azimuth
- 0 °
- Dip
- -90 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- ALS Laboratory
- QP Signed
- Yes
- QA/QC Methods
- standards
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept confirms continued rare earth element mineralization, albeit at a lower grade, in the Mallee Project area.
Positive factors
- Confirms rare earth element mineralization below a higher-grade intercept.
Negative factors
- Lower grade compared to the intercept immediately above it.
- Early-stage exploration with widely spaced drilling.
- No true width reported for the intercept.
Evidence · text
“26 CDAC023 16-17m 1m@350.23”
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
26CDAC025Coodalya · rare_earthsGrade: 428.84Grade Unit: ppm TREOIntercept: 1 mView all detailsHide details
Identity
- Hole ID
- 26CDAC025
- Project
- Coodalya
- Commodity
- rare_earths
- Region
- australia_sa
- Reported Region
- australia_sa
- Ticker
- KLR
Geometry
- Grade
- 428.84
- Grade Unit
- ppm TREO
- Intercept
- 1 m
- From
- 15 m
- To
- 16 m
- Hole Depth
- 18 m
- Intercept Depth
- 15 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- 26CDAC025:15-16
Location
- Location
- Mallee Project
- Easting
- 405940
- Northing
- 6134084
- Elevation
- 60 m
- Azimuth
- 0 °
- Dip
- -90 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- ALS Laboratory
- QP Signed
- Yes
- QA/QC Methods
- standards
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept provides further confirmation of rare earth element mineralization in the Mallee Project area from a new drill hole.
Positive factors
- Confirms rare earth element mineralization in a new drill hole.
Negative factors
- Early-stage exploration with widely spaced drilling.
- No true width reported for the intercept.
Evidence · text
“26CDAC025 15-16m, 1m @ 428.84”
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
26CDAC030Coodalya · rare_earthsGrade: 361.91Grade Unit: ppm TREOIntercept: 1 mView all detailsHide details
Identity
- Hole ID
- 26CDAC030
- Project
- Coodalya
- Commodity
- rare_earths
- Region
- australia_sa
- Reported Region
- australia_sa
- Ticker
- KLR
Geometry
- Grade
- 361.91
- Grade Unit
- ppm TREO
- Intercept
- 1 m
- From
- 6 m
- To
- 7 m
- Hole Depth
- 15 m
- Intercept Depth
- 6 m
Classification
- Deposit Type
- other
- Program
- exploration
- Sample Type
- drill
- Group ID
- 26CDAC030:6-7
Location
- Location
- Mallee Project
- Easting
- 406480
- Northing
- 6133600
- Elevation
- 63 m
- Azimuth
- 0 °
- Dip
- -90 °
- Loc. Confidence
- high
- Loc. Source
- document
QA/QC
- Laboratory
- ALS Laboratory
- QP Signed
- Yes
- QA/QC Methods
- standards
Deleterious
- Deleterious Flag
- No
Review
- Needs Review
- No
- Interp. Status
- scored
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: This intercept confirms rare earth element mineralization at a shallower depth in the Mallee Project area.
Positive factors
- Confirms rare earth element mineralization at a shallower depth.
Negative factors
- Early-stage exploration with widely spaced drilling.
- No true width reported for the intercept.
Evidence · text
“26CDAC030 6-7m, 1m @ 361.91”
Tags used in scoring
No QA/QC Disclosurenegative
Release does not disclose QA/QC — lab certification, CP/QP sign-off and assay protocols cannot be checked from this document.
Why it applies: qaqc_disclosed is not true
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.