KLI: Quarterly Activities/Appendix 5B Cash Flow Report
Original announcement by asx on
- Company
- Killi Resources Limited
- Ticker
- KLI
- Exchange
- ASX
- Region
- Western Australia
- Primary commodity
- Iron ore
- Secondary commodities
- Gold, Copper, Molybdenum, Aluminium oxide, Silicon dioxide
- Document categories
- Other, Resource update, Capital raise
- Extracted
- 2026-10-28 23:03:49 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Killi Resources Limited reported on its September 2026 quarter, highlighting the completion of the Lodestone Iron Ore Project acquisition and the commencement of a 20,000m drilling program. Visual estimates from step-out drilling at Lodestone indicated thick zones of coarse-grained magnetite, extending the known mineralization. The company maintains a strong cash position of A$16.4 million to fund ongoing exploration activities across its projects.
Reasoning: Killi Resources completed a key acquisition and initiated a substantial drilling program at its Lodestone Iron Ore Project, with promising visual results extending known mineralization. The company is well-funded, supporting ongoing exploration. However, the lack of assay results for the new drilling and the re-statement of the resource estimate temper the overall novelty and definitive positive impact.
Positive factors
- Acquisition of Lodestone Iron Ore Project completed, providing a clear project focus.
- Significant 20,000m drilling program commenced at Lodestone, targeting resource expansion and upgrade.
- Promising visual estimates from step-out drilling (KKDD001, KKDD004) indicate thick zones of coarse-grained magnetite, extending mineralization.
- Deployment of a second drill rig (RC) to accelerate drilling and test strike extensions.
- Strong cash position of A$16.4 million supports ongoing exploration activities.
- Resource estimate is JORC compliant and signed off by Competent Persons.
Negative factors
- Drilling results are currently only visual estimates; definitive assay results are pending.
- The resource estimate presented is a re-statement of a prior MRE, not a new or updated estimate.
- Drilling permits for the Mt Rawdon West Project are delayed, pushing back exploration timing.
Facts used in scoring: 13

Classification and evidence
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: The document explicitly states '110Mt JORC Inferred Mineral Resource Estimate'.
Evidence · text
“110Mt JORC Inferred Mineral Resource Estimate”
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Mr Brett Smith and Dr Stuart Owen are named as Competent Persons responsible for the exploration results and mineral resource estimate, respectively.
Evidence · text
“The information in this report that relates to Exploration Results is based on information compiled by Mr Brett Smith. Mr Smith is a Member of The Australasian Institute of Mining and Metallurgy and the Australian Institute of Geoscientists. ... The information in this announcement that relates to the mineral resource estimate for the Lodestone Iron Ore Project, geology, exploration results and other technical matters is based on, and fairly represents, information compiled by Dr Stuart Owen, Principal Geologist, Matakitaki Minerals Pty Ltd, who is a Member of the Australian Institute of Geoscientists.”
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The resource estimate is entirely classified as 'Inferred'.
Evidence · table
“Inferred”
Context: 110
All Inferrednegative
100% of resource is Inferred category — very early stage, no engineering confidence.
Why it applies: All reported resource categories in Table 1 are 'Inferred'.
Evidence · table
“Inferred”
Context: 110
Resource Updateneutral
Revised estimate for an existing resource — compare to prior to assess progress.
Why it applies: The document refers to an 'existing 110Mt JORC Inferred Mineral Resource Estimate' and presents it in Table 1, indicating it's a re-statement of a prior estimate.
Evidence · text
“existing 110Mt JORC Inferred Mineral Resource Estimate”
Open Pit Mining Methodneutral · Story-specific tag
No canonical definition is currently available.
Why it applies: The drilling program is designed to 'Test proximal and parallel zones of mineralisation potentially exploitable by an open-pit mining operation'.
Evidence · text
“Test proximal and parallel zones of mineralisation potentially exploitable by an open-pit mining operation”
Placementneutral · Story-specific tag
No canonical definition is currently available.
Why it applies: The company completed a 'two-tranche placement' to raise funds.
Evidence · text
“Killi received firm commitments to raise $15 million (before costs) via a two-tranche placement”
Extracted facts
Stored fact records: 12. Some facts used in scoring do not have a stored record.
Resource Estimates (12)
inferredLodestone Iron Ore Project · iron_oreTonnes: 110000000Grade: 69Grade Unit: %Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Lodestone Iron Ore Project
- Commodity
- iron_ore
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- KLI
Resource scope
- Estimate type
- resource
- Effective date
- 2026-06-11T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Brett Smith, Dr Stuart Owen
- Resource group id
- resource:35c58bfcb33c402a7beb
- Deposit or zone
- Fresh Zone
Resource Data
- Category
- inferred
- Tonnes
- 110000000
- Grade
- 69
- Grade Unit
- %
- Cutoff Grade
- 0
- Cutoff Unit
- % DTR MR
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-06-11T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The Inferred resource for iron ore at 0% DTR MR cutoff is a re-statement of a prior JORC compliant estimate with a high iron grade, but its novelty is low as it's not a new update.
Positive factors
- Resource is JORC compliant and signed off by Competent Persons.
- High iron grade of 69% Fe in concentrate.
Negative factors
- Resource is entirely in the Inferred category, indicating lower geological confidence.
- This is a re-statement of a prior MRE, not a new estimate, reducing novelty.
Evidence · table
“69”
Context: 110
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredLodestone Iron Ore Project · silicon_dioxideTonnes: 110000000Grade: 3.9Grade Unit: %Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Lodestone Iron Ore Project
- Commodity
- silicon_dioxide
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- KLI
Resource scope
- Estimate type
- resource
- Effective date
- 2026-06-11T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Brett Smith, Dr Stuart Owen
- Resource group id
- resource:35c58bfcb33c402a7beb
- Deposit or zone
- Fresh Zone
Resource Data
- Category
- inferred
- Tonnes
- 110000000
- Grade
- 3.9
- Grade Unit
- %
- Cutoff Grade
- 0
- Cutoff Unit
- % DTR MR
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-06-11T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The Inferred resource for silicon dioxide at 0% DTR MR cutoff is a re-statement of a prior JORC compliant estimate, but its novelty is low and it represents a deleterious element.
Positive factors
- Resource is JORC compliant and signed off by Competent Persons.
Negative factors
- Resource is entirely in the Inferred category, indicating lower geological confidence.
- This is a re-statement of a prior MRE, not a new estimate, reducing novelty.
Evidence · table
“3.9”
Context: 110
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredLodestone Iron Ore Project · aluminium_oxideTonnes: 110000000Grade: 0.08Grade Unit: %Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Lodestone Iron Ore Project
- Commodity
- aluminium_oxide
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- KLI
Resource scope
- Estimate type
- resource
- Effective date
- 2026-06-11T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Brett Smith, Dr Stuart Owen
- Resource group id
- resource:35c58bfcb33c402a7beb
- Deposit or zone
- Fresh Zone
Resource Data
- Category
- inferred
- Tonnes
- 110000000
- Grade
- 0.08
- Grade Unit
- %
- Cutoff Grade
- 0
- Cutoff Unit
- % DTR MR
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-06-11T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The Inferred resource for aluminium oxide at 0% DTR MR cutoff is a re-statement of a prior JORC compliant estimate, but its novelty is low and it represents a deleterious element.
Positive factors
- Resource is JORC compliant and signed off by Competent Persons.
Negative factors
- Resource is entirely in the Inferred category, indicating lower geological confidence.
- This is a re-statement of a prior MRE, not a new estimate, reducing novelty.
Evidence · table
“0.08”
Context: 110
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredLodestone Iron Ore Project · iron_oreTonnes: 110000000Grade: 69Grade Unit: %Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Lodestone Iron Ore Project
- Commodity
- iron_ore
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- KLI
Resource scope
- Estimate type
- resource
- Effective date
- 2026-06-11T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Brett Smith, Dr Stuart Owen
- Resource group id
- resource:35c58bfcb33c402a7beb
- Deposit or zone
- Fresh Zone
Resource Data
- Category
- inferred
- Tonnes
- 110000000
- Grade
- 69
- Grade Unit
- %
- Cutoff Grade
- 10
- Cutoff Unit
- % DTR MR
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-06-11T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The Inferred resource for iron ore at 10% DTR MR cutoff is a re-statement of a prior JORC compliant estimate with a high iron grade, but its novelty is low as it's not a new update.
Positive factors
- Resource is JORC compliant and signed off by Competent Persons.
- High iron grade of 69% Fe in concentrate.
Negative factors
- Resource is entirely in the Inferred category, indicating lower geological confidence.
- This is a re-statement of a prior MRE, not a new estimate, reducing novelty.
Evidence · table
“69”
Context: 110
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredLodestone Iron Ore Project · silicon_dioxideTonnes: 110000000Grade: 3.9Grade Unit: %Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Lodestone Iron Ore Project
- Commodity
- silicon_dioxide
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- KLI
Resource scope
- Estimate type
- resource
- Effective date
- 2026-06-11T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Brett Smith, Dr Stuart Owen
- Resource group id
- resource:35c58bfcb33c402a7beb
- Deposit or zone
- Fresh Zone
Resource Data
- Category
- inferred
- Tonnes
- 110000000
- Grade
- 3.9
- Grade Unit
- %
- Cutoff Grade
- 10
- Cutoff Unit
- % DTR MR
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-06-11T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The Inferred resource for silicon dioxide at 10% DTR MR cutoff is a re-statement of a prior JORC compliant estimate, but its novelty is low and it represents a deleterious element.
Positive factors
- Resource is JORC compliant and signed off by Competent Persons.
Negative factors
- Resource is entirely in the Inferred category, indicating lower geological confidence.
- This is a re-statement of a prior MRE, not a new estimate, reducing novelty.
Evidence · table
“3.9”
Context: 110
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredLodestone Iron Ore Project · aluminium_oxideTonnes: 110000000Grade: 0.08Grade Unit: %Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Lodestone Iron Ore Project
- Commodity
- aluminium_oxide
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- KLI
Resource scope
- Estimate type
- resource
- Effective date
- 2026-06-11T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Brett Smith, Dr Stuart Owen
- Resource group id
- resource:35c58bfcb33c402a7beb
- Deposit or zone
- Fresh Zone
Resource Data
- Category
- inferred
- Tonnes
- 110000000
- Grade
- 0.08
- Grade Unit
- %
- Cutoff Grade
- 10
- Cutoff Unit
- % DTR MR
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-06-11T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The Inferred resource for aluminium oxide at 10% DTR MR cutoff is a re-statement of a prior JORC compliant estimate, but its novelty is low and it represents a deleterious element.
Positive factors
- Resource is JORC compliant and signed off by Competent Persons.
Negative factors
- Resource is entirely in the Inferred category, indicating lower geological confidence.
- This is a re-statement of a prior MRE, not a new estimate, reducing novelty.
Evidence · table
“0.08”
Context: 110
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredLodestone Iron Ore Project · iron_oreTonnes: 98000000Grade: 69Grade Unit: %Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Lodestone Iron Ore Project
- Commodity
- iron_ore
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- KLI
Resource scope
- Estimate type
- resource
- Effective date
- 2026-06-11T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Brett Smith, Dr Stuart Owen
- Resource group id
- resource:c36812e2aed1eaa743fd
- Deposit or zone
- Fresh Zone
Resource Data
- Category
- inferred
- Tonnes
- 98000000
- Grade
- 69
- Grade Unit
- %
- Cutoff Grade
- 20
- Cutoff Unit
- % DTR MR
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-06-11T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The Inferred resource for iron ore at 20% DTR MR cutoff is a re-statement of a prior JORC compliant estimate with a high iron grade, but its novelty is low as it's not a new update.
Positive factors
- Resource is JORC compliant and signed off by Competent Persons.
- High iron grade of 69% Fe in concentrate.
Negative factors
- Resource is entirely in the Inferred category, indicating lower geological confidence.
- This is a re-statement of a prior MRE, not a new estimate, reducing novelty.
Evidence · table
“69”
Context: 98
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredLodestone Iron Ore Project · silicon_dioxideTonnes: 98000000Grade: 3.9Grade Unit: %Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Lodestone Iron Ore Project
- Commodity
- silicon_dioxide
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- KLI
Resource scope
- Estimate type
- resource
- Effective date
- 2026-06-11T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Brett Smith, Dr Stuart Owen
- Resource group id
- resource:c36812e2aed1eaa743fd
- Deposit or zone
- Fresh Zone
Resource Data
- Category
- inferred
- Tonnes
- 98000000
- Grade
- 3.9
- Grade Unit
- %
- Cutoff Grade
- 20
- Cutoff Unit
- % DTR MR
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-06-11T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The Inferred resource for silicon dioxide at 20% DTR MR cutoff is a re-statement of a prior JORC compliant estimate, but its novelty is low and it represents a deleterious element.
Positive factors
- Resource is JORC compliant and signed off by Competent Persons.
Negative factors
- Resource is entirely in the Inferred category, indicating lower geological confidence.
- This is a re-statement of a prior MRE, not a new estimate, reducing novelty.
Evidence · table
“3.9”
Context: 98
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredLodestone Iron Ore Project · aluminium_oxideTonnes: 98000000Grade: 0.07Grade Unit: %Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Lodestone Iron Ore Project
- Commodity
- aluminium_oxide
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- KLI
Resource scope
- Estimate type
- resource
- Effective date
- 2026-06-11T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Brett Smith, Dr Stuart Owen
- Resource group id
- resource:c36812e2aed1eaa743fd
- Deposit or zone
- Fresh Zone
Resource Data
- Category
- inferred
- Tonnes
- 98000000
- Grade
- 0.07
- Grade Unit
- %
- Cutoff Grade
- 20
- Cutoff Unit
- % DTR MR
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-06-11T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The Inferred resource for aluminium oxide at 20% DTR MR cutoff is a re-statement of a prior JORC compliant estimate, but its novelty is low and it represents a deleterious element.
Positive factors
- Resource is JORC compliant and signed off by Competent Persons.
Negative factors
- Resource is entirely in the Inferred category, indicating lower geological confidence.
- This is a re-statement of a prior MRE, not a new estimate, reducing novelty.
Evidence · table
“0.07”
Context: 98
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredLodestone Iron Ore Project · iron_oreTonnes: 77000000Grade: 69Grade Unit: %Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Lodestone Iron Ore Project
- Commodity
- iron_ore
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- KLI
Resource scope
- Estimate type
- resource
- Effective date
- 2026-06-11T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Brett Smith, Dr Stuart Owen
- Resource group id
- resource:d83b007a905772e4147a
- Deposit or zone
- Fresh Zone
Resource Data
- Category
- inferred
- Tonnes
- 77000000
- Grade
- 69
- Grade Unit
- %
- Cutoff Grade
- 30
- Cutoff Unit
- % DTR MR
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-06-11T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The Inferred resource for iron ore at 30% DTR MR cutoff is a re-statement of a prior JORC compliant estimate with a high iron grade, but its novelty is low as it's not a new update.
Positive factors
- Resource is JORC compliant and signed off by Competent Persons.
- High iron grade of 69% Fe in concentrate.
Negative factors
- Resource is entirely in the Inferred category, indicating lower geological confidence.
- This is a re-statement of a prior MRE, not a new estimate, reducing novelty.
Evidence · table
“69”
Context: 77
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredLodestone Iron Ore Project · silicon_dioxideTonnes: 77000000Grade: 3.4Grade Unit: %Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Lodestone Iron Ore Project
- Commodity
- silicon_dioxide
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- KLI
Resource scope
- Estimate type
- resource
- Effective date
- 2026-06-11T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Brett Smith, Dr Stuart Owen
- Resource group id
- resource:d83b007a905772e4147a
- Deposit or zone
- Fresh Zone
Resource Data
- Category
- inferred
- Tonnes
- 77000000
- Grade
- 3.4
- Grade Unit
- %
- Cutoff Grade
- 30
- Cutoff Unit
- % DTR MR
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-06-11T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The Inferred resource for silicon dioxide at 30% DTR MR cutoff is a re-statement of a prior JORC compliant estimate, but its novelty is low and it represents a deleterious element.
Positive factors
- Resource is JORC compliant and signed off by Competent Persons.
Negative factors
- Resource is entirely in the Inferred category, indicating lower geological confidence.
- This is a re-statement of a prior MRE, not a new estimate, reducing novelty.
Evidence · table
“3.4”
Context: 77
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
inferredLodestone Iron Ore Project · aluminium_oxideTonnes: 77000000Grade: 0.05Grade Unit: %Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Lodestone Iron Ore Project
- Commodity
- aluminium_oxide
- Region
- australia_wa
- Reported Region
- Western Australia
- Ticker
- KLI
Resource scope
- Estimate type
- resource
- Effective date
- 2026-06-11T00:00:00.000Z
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Mr Brett Smith, Dr Stuart Owen
- Resource group id
- resource:d83b007a905772e4147a
- Deposit or zone
- Fresh Zone
Resource Data
- Category
- inferred
- Tonnes
- 77000000
- Grade
- 0.05
- Grade Unit
- %
- Cutoff Grade
- 30
- Cutoff Unit
- % DTR MR
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2026-06-11T00:00:00.000Z
Dates
- Event date
- 2026-10-28T00:00:00.000Z
Reasoning: The Inferred resource for aluminium oxide at 30% DTR MR cutoff is a re-statement of a prior JORC compliant estimate, but its novelty is low and it represents a deleterious element.
Positive factors
- Resource is JORC compliant and signed off by Competent Persons.
Negative factors
- Resource is entirely in the Inferred category, indicating lower geological confidence.
- This is a re-statement of a prior MRE, not a new estimate, reducing novelty.
Evidence · table
“0.05”
Context: 77
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.