IVG: Company Presentation

Original announcement by asx on

Company
InVert Graphite Limited
Ticker
IVG
Exchange
ASX
Region
Tanzania
Primary commodity
Unavailable
Secondary commodities
None reported
Document categories
Other, Resource update
Extracted
2026-10-27 00:09:00 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

InVert Graphite Limited presents its Morogoro Project in Tanzania, featuring a maiden Inferred Mineral Resource of 32.2 Mt at 8.0% TGC. The company highlights its RapidPulse technology, which aims to provide acid-free, rapid graphitisation for both natural and synthetic feedstock.

Reasoning: The presentation provides a corporate overview of the company's graphite assets and its proprietary RapidPulse technology, highlighting a maiden resource and strategic market positioning.

Positive factors

  • Maiden MRE established for Kumba Deposit
  • Proprietary RapidPulse technology offers acid-free, low-energy processing
  • Strategic focus on US market and non-Chinese supply chains
  • Strong leadership with experience in US business establishment

Negative factors

  • Technology is at TRL 4 and not yet demonstrated at commercial scale
  • Resource is 100% Inferred, representing high geological risk
  • Aspirational cost and energy savings are based on preliminary calculations

Facts used in scoring: 1

Atlas analysis — InVert Graphite Limited: IVG: Company Presentation. inferred 32200000 tonnes

Classification and evidence

Maiden Resourceneutral · Story-specific tag

First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.

Why it applies: The presentation explicitly states a 'Maiden MRE' for the Kumba Deposit.

Evidence · text

“Maiden MRE - 32.2 Mt @ 8.0% TGC”

All Inferrednegative · Story-specific tag

100% of resource is Inferred category — very early stage, no engineering confidence.

Why it applies: The reported resource is stated to be 100% Inferred.

Evidence · text

“100% Inferred”

Extracted facts

Stored fact records: 1. Some facts used in scoring do not have a stored record.

Resource Estimates (1)

inferredMorogoro Project · graphiteTonnes: 32200000Grade: 8Grade Unit: % TGCContained Metal: 2.56Contained Unit: mtView all details
Link to this fact

Identity

Project
Morogoro Project
Commodity
graphite
Region
tanzania
Reported Region
Tanzania
Ticker
IVG

Resource scope

Estimate type
resource
Reporting standards
other
QP Signed
Yes
Qualified person names
Elizabeth Haren
Resource group id
resource:171cb7b4c959c1838da7
Deposit or zone
Kumba Deposit
Ownership percent
100 %

Resource Data

Category
inferred
Tonnes
32200000
Grade
8
Grade Unit
% TGC
Contained Metal
2.56
Contained Unit
mt
Cutoff Grade
4
Cutoff Unit
% TGC

Prior Estimate

Resource Date
2026-08-12

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-26T00:00:00.000Z

Reasoning: The maiden resource provides a baseline for the project's scale but lacks higher-confidence categories.

Positive factors

  • Establishes a significant maiden resource base

Negative factors

  • 100% Inferred category implies high geological uncertainty

Evidence · text

“Maiden MRE - 32.2 Mt @ 8.0% TGC, 2.56 Mt contained graphite (100% Inferred)”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

PEA-Supportingneutral

Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.

Why it applies: the release names the study this estimate supports

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.