IVG: Company Presentation
Original announcement by asx on
- Company
- InVert Graphite Limited
- Ticker
- IVG
- Exchange
- ASX
- Region
- Tanzania
- Primary commodity
- Unavailable
- Secondary commodities
- None reported
- Document categories
- Other, Resource update
- Extracted
- 2026-10-27 00:09:00 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
InVert Graphite Limited presents its Morogoro Project in Tanzania, featuring a maiden Inferred Mineral Resource of 32.2 Mt at 8.0% TGC. The company highlights its RapidPulse technology, which aims to provide acid-free, rapid graphitisation for both natural and synthetic feedstock.
Reasoning: The presentation provides a corporate overview of the company's graphite assets and its proprietary RapidPulse technology, highlighting a maiden resource and strategic market positioning.
Positive factors
- Maiden MRE established for Kumba Deposit
- Proprietary RapidPulse technology offers acid-free, low-energy processing
- Strategic focus on US market and non-Chinese supply chains
- Strong leadership with experience in US business establishment
Negative factors
- Technology is at TRL 4 and not yet demonstrated at commercial scale
- Resource is 100% Inferred, representing high geological risk
- Aspirational cost and energy savings are based on preliminary calculations
Facts used in scoring: 1

Classification and evidence
Maiden Resourceneutral · Story-specific tag
First formal MRE for the project — establishes baseline but typically exploration-stage with high Inferred component.
Why it applies: The presentation explicitly states a 'Maiden MRE' for the Kumba Deposit.
Evidence · text
“Maiden MRE - 32.2 Mt @ 8.0% TGC”
All Inferrednegative · Story-specific tag
100% of resource is Inferred category — very early stage, no engineering confidence.
Why it applies: The reported resource is stated to be 100% Inferred.
Evidence · text
“100% Inferred”
Extracted facts
Stored fact records: 1. Some facts used in scoring do not have a stored record.
Resource Estimates (1)
inferredMorogoro Project · graphiteTonnes: 32200000Grade: 8Grade Unit: % TGCContained Metal: 2.56Contained Unit: mtView all detailsHide details
Identity
- Project
- Morogoro Project
- Commodity
- graphite
- Region
- tanzania
- Reported Region
- Tanzania
- Ticker
- IVG
Resource scope
- Estimate type
- resource
- Reporting standards
- other
- QP Signed
- Yes
- Qualified person names
- Elizabeth Haren
- Resource group id
- resource:171cb7b4c959c1838da7
- Deposit or zone
- Kumba Deposit
- Ownership percent
- 100 %
Resource Data
- Category
- inferred
- Tonnes
- 32200000
- Grade
- 8
- Grade Unit
- % TGC
- Contained Metal
- 2.56
- Contained Unit
- mt
- Cutoff Grade
- 4
- Cutoff Unit
- % TGC
Prior Estimate
- Resource Date
- 2026-08-12
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-26T00:00:00.000Z
Reasoning: The maiden resource provides a baseline for the project's scale but lacks higher-confidence categories.
Positive factors
- Establishes a significant maiden resource base
Negative factors
- 100% Inferred category implies high geological uncertainty
Evidence · text
“Maiden MRE - 32.2 Mt @ 8.0% TGC, 2.56 Mt contained graphite (100% Inferred)”
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
PEA-Supportingneutral
Resource estimate prepared to support a Preliminary Economic Assessment — early-stage study.
Why it applies: the release names the study this estimate supports
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.