Ilnytsia Lignite Quarry and 3.5 MW Power Project
Original announcement by minemarket on
- Company
- LIGNIT+ LLC
- Ticker
- Unavailable
- Exchange
- Unavailable
- Region
- Zakarpattia, western Ukraine
- Primary commodity
- Coal
- Secondary commodities
- None reported
- Document categories
- Other, Resource update
- Extracted
- 2026-11-07 16:31:56 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
LIGNIT+ LLC is seeking a strategic partner to develop a 3.5 MW lignite-fired power plant at the Ilnytsia deposit in Ukraine. The project leverages existing mining infrastructure and approximately 1.1 million tonnes of remaining lignite reserves to transition from coal sales to on-site electricity generation.
Reasoning: The document is a project briefing/investment pitch for a lignite-to-power conversion project, including historical reserve data.
Positive factors
- Existing infrastructure and industrial site on hand
- Valid subsoil permit until 2042
- Strategic pivot to on-site power generation
Negative factors
- No coal production since February 2022
- Project requires strategic investor or JV partner to fund power plant
Facts used in scoring: 2

Classification and evidence
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The reserves are reported under category C1 (Ukrainian classification) and are part of an early-stage project transition, implying limited geological confidence compared to M&I.
Evidence · text
“category C1, code 111”
Extracted facts
Stored fact records: 2. Some facts used in scoring do not have a stored record.
Resource Estimates (2)
inferredIlnytsia · coalTonnes: 1194000Historical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Ilnytsia
- Commodity
- coal
- Region
- zakarpattia, western ukraine
- Reported Region
- Zakarpattia, western Ukraine
Resource scope
- Estimate type
- resource
- Reporting standards
- other
- Resource group id
- resource:199d8e3d0f40fdbd1c34
- Deposit or zone
- Karierna and Kremenna sections
Resource Data
- Category
- inferred
- Tonnes
- 1194000
Prior Estimate
- Resource Date
- 2017-01-01
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2017-01-01T00:00:00.000Z
Dates
- Event date
- 2026-11-07T00:00:00.000Z
Reasoning: Historical reserve figure (category C1) from 2017.
Evidence · text
“Reserves: balance reserves of brown coal (category C1, code 111) of 1,194 thousand tonnes at 1 January 2017”
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
No QP/CP Disclosurenegative
No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.
Why it applies: no Qualified or Competent Person is named anywhere in the release
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 9.8 years before this release
inferredIlnytsia · coalTonnes: 1147000View all detailsHide details
Identity
- Project
- Ilnytsia
- Commodity
- coal
- Region
- zakarpattia, western ukraine
- Reported Region
- Zakarpattia, western Ukraine
Resource scope
- Estimate type
- resource
- Reporting standards
- other
- Resource group id
- resource:8f905196924cd9095ecb
- Deposit or zone
- Ilnytsia deposit
- Mining method
- open_pit
Resource Data
- Category
- inferred
- Tonnes
- 1147000
Prior Estimate
- Resource Date
- 2022-01-01
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-11-07T00:00:00.000Z
Reasoning: Current permit states remaining balance reserves as of 2022.
Evidence · text
“The current permit states remaining balance reserves of about 1,147 thousand tonnes at 1 January 2022.”
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
No Contained Metalnegative
Tonnage and grade reported but contained metal not calculated or disclosed — incomplete reporting.
Why it applies: contained_metal was not reported
No QP/CP Disclosurenegative
No Qualified Person or Competent Person named — lower credibility for the estimate. A QP/CP should be a member of a recognized professional association with relevant experience.
Why it applies: no Qualified or Competent Person is named anywhere in the release
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 4.8 years before this release
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.