HVY: Quarterly Activities/Appendix 5B Cash Flow Report
Original announcement by asx on
- Company
- Heavy Minerals Limited
- Ticker
- HVY
- Exchange
- ASX
- Region
- Unavailable
- Primary commodity
- Unavailable
- Secondary commodities
- None reported
- Document categories
- Other, Capital raise, Resource update
- Extracted
- 2026-10-29 22:45:44 UTC
Analysis by Minestarters Atlas
Atlas analysis published:
Minestarters Atlas analysis
Summary
Heavy Minerals Limited reported on its September 2026 quarter activities, highlighting the delivery of a maiden Ore Reserve and Pre-Feasibility Study for the Port Gregory Garnet Project, which outlines a 24-year mine life and a post-tax NPV of A$322.8 million. The company continued Front End Loading Stage 3 engineering study work at Kanmantoo and progressed project funding discussions, closing the quarter with A$39,000 in cash and an estimated 2.2 quarters of funding available. The Port Gregory Mineral Resource remains unchanged from July 2023.
Reasoning: The company delivered key project milestones (Ore Reserve, PFS) for Port Gregory, which are positive for project de-risking and future development. However, the low cash balance and limited funding runway, despite ongoing funding discussions, present a near-term challenge. The Port Gregory Mineral Resource is historical, reducing its novelty.
Positive factors
- Maiden Ore Reserve and Pre-Feasibility Study delivered for Port Gregory, outlining a significant mine life and positive economics.
- Continued progress on engineering studies for the Kanmantoo project.
- Ongoing discussions for project funding and product qualification.
Negative factors
- Low cash balance at quarter end (A$39,000).
- Estimated quarters of funding available is low (2.2 quarters based on Appendix 5B calculation).
- Mineral Resource estimate for Port Gregory is historical and unchanged since July 2023.
Facts used in scoring: 8

Classification and evidence
Probable Reservepositive · Story-specific tag
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: The document reports a 'Maiden Ore Reserve (Probable)' for the Port Gregory Garnet Project.
Evidence · text
“Maiden Ore Reserve (Probable) 85.5 Mt at 4.43% THM for 3.3 Mt of contained garnet”
QP/CP Signedpositive · Story-specific tag
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: Mr Adrian Jones is explicitly named as the Competent Person for the Port Gregory Ore Reserve estimate.
Evidence · text
“Mr Adrian Jones... is the Competent Person for the Port Gregory Ore Reserve estimate”
JORC Compliantpositive · Story-specific tag
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: The Port Gregory Ore Reserve estimate is defined in the JORC Code (2012).
Evidence · text
“as defined in the JORC Code (2012)”
Measured Resourcepositive · Story-specific tag
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: The Port Gregory Mineral Resource includes a 'Measured' category of 126 Mt at 3.8% THM.
Evidence · text
“Measured 126 Mt at 3.8%”
Indicated Resourcepositive · Story-specific tag
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: The Port Gregory Mineral Resource includes an 'Indicated' category of 20 Mt at 6.5% THM.
Evidence · text
“Indicated 20 Mt at 6.5%”
Inferred Resourcenegative · Story-specific tag
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: The Port Gregory Mineral Resource includes an 'Inferred' category of 20 Mt at 2.9% THM.
Evidence · text
“Inferred 20 Mt at 2.9%”
Historical Estimate Onlynegative · Story-specific tag
Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.
Why it applies: The Port Gregory Mineral Resource estimate is explicitly stated as 'unchanged from that last reported to ASX on 10 July 2023'.
Evidence · text
“The estimate is unchanged from that last reported to ASX on 10 July 2023.”
Stale Estimatenegative · Story-specific tag
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: The effective date of the Port Gregory Mineral Resource is 10 July 2023, which is over 2 years old relative to the report date of October 2026.
Evidence · text
“The estimate is unchanged from that last reported to ASX on 10 July 2023.”
Cut-off Disclosedpositive · Story-specific tag
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: The Port Gregory Mineral Resource is reported 'at a 2% THM cut-off'.
Evidence · text
“reported at a 2% THM cut-off”
PFS-Supportingneutral · Story-specific tag
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: The document details the results of a Pre-Feasibility Study (PFS) for the Port Gregory Garnet Project.
Evidence · text
“The Port Gregory Pre-Feasibility Study to the market”
Funding Discussionsneutral · Story-specific tag
No canonical definition is currently available.
Why it applies: The company states that 'Project funding discussions continued' and 'Discussions remain preliminary and non-binding'.
Evidence · text
“Project funding discussions continued across bonds, debt, royalties and prepay structures.”
ATM Facilityneutral · Story-specific tag
No canonical definition is currently available.
Why it applies: The company reports on its 'Acuity Capital ATM facility' and its usage.
Evidence · text
“Continued access to previously announced facilities. A$1,728,000 remained unused under the Acuity Capital ATM facility at quarter end.”
Low Cash Balancenegative · Story-specific tag
No canonical definition is currently available.
Why it applies: The company closed the quarter with only 'A$39,000 in cash'.
Evidence · text
“The Company closed the quarter with A$39,000 in cash.”
Going Concern Risknegative · Story-specific tag
No canonical definition is currently available.
Why it applies: The estimated quarters of funding available is 2.2, which is below the 2-quarter threshold for heightened concern, and the company addresses this in section 8.8.
Evidence · table
“2.2”
Context: 8.7 Estimated quarters of funding available (item 8.6 divided by item 8.3)
Extracted facts
Stored fact records: 4. Some facts used in scoring do not have a stored record.
Resource Estimates (4)
probablePort Gregory Garnet Project · garnetTonnes: 85500000Grade: 4.43Grade Unit: % THMContained Metal: 3.3Contained Unit: mtView all detailsHide details
Identity
- Project
- Port Gregory Garnet Project
- Commodity
- garnet
- Ticker
- HVY
Resource scope
- Estimate type
- reserve
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Adrian Jones
- Resource group id
- resource:548737248094278bd15d
- Mining method
- open_pit
Resource Data
- Category
- probable
- Tonnes
- 85500000
- Grade
- 4.43
- Grade Unit
- % THM
- Contained Metal
- 3.3
- Contained Unit
- mt
Prior Estimate
- Resource Date
- 2026-07-08
Review
- Needs Review
- No
- Historical
- No
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The maiden Probable Ore Reserve for Port Gregory is a significant de-risking milestone, providing a strong foundation for project development and funding discussions. The contained garnet and grade are substantial.
Positive factors
- Maiden Ore Reserve establishes economic viability for the project.
- Probable category indicates high confidence for mine planning.
- Significant contained garnet tonnage (3.3 Mt).
Evidence · text
“Maiden Ore Reserve (Probable) 85.5 Mt at 4.43% THM for 3.3 Mt of contained garnet”
Tags used in scoring
Probable Reservepositive
Indicated Resource with demonstrated economic viability after applying modifying factors.
Why it applies: category is "probable"
Cut-off Undisclosednegative
High-grade interval reported without stating the cut-off grade used for compositing.
Why it applies: no cutoff_grade was stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
measuredPort Gregory Garnet Project · garnetTonnes: 126000000Grade: 3.8Grade Unit: % THMContained Metal: 5.9Contained Unit: mtHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Port Gregory Garnet Project
- Commodity
- garnet
- Ticker
- HVY
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Greg Jones
- Resource group id
- resource:dd62070cfe1b93c05bd3
Resource Data
- Category
- measured
- Tonnes
- 126000000
- Grade
- 3.8
- Grade Unit
- % THM
- Contained Metal
- 5.9
- Contained Unit
- mt
- Cutoff Grade
- 2
- Cutoff Unit
- % THM
Prior Estimate
- Resource Date
- 2023-07-10
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-07-10T00:00:00.000Z
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The Measured Mineral Resource for Port Gregory provides a strong base for the project, but its historical nature means it does not represent new information in this quarterly report.
Positive factors
- Measured category indicates high geological confidence.
- Significant tonnage and grade for garnet.
Negative factors
- Estimate is historical and unchanged since July 2023, reducing its novelty for this report.
Evidence · text
“Mineral Resource of 166 Mt at 4.0% Total Heavy Minerals (Measured 126 Mt at 3.8%, Indicated 20 Mt at 6.5%, Inferred 20 Mt at 2.9%) for 5.9 Mt of contained garnet, reported at a 2% THM cut-off. The estimate is unchanged from that last reported to ASX on 10 July 2023.”
Tags used in scoring
Measured Resourcepositive
Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.
Why it applies: category is "measured"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.3 years before this release
indicatedPort Gregory Garnet Project · garnetTonnes: 20000000Grade: 6.5Grade Unit: % THMContained Metal: 5.9Contained Unit: mtHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Port Gregory Garnet Project
- Commodity
- garnet
- Ticker
- HVY
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Greg Jones
- Resource group id
- resource:0aae078f8755350b9eaf
Resource Data
- Category
- indicated
- Tonnes
- 20000000
- Grade
- 6.5
- Grade Unit
- % THM
- Contained Metal
- 5.9
- Contained Unit
- mt
- Cutoff Grade
- 2
- Cutoff Unit
- % THM
Prior Estimate
- Resource Date
- 2023-07-10
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-07-10T00:00:00.000Z
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The Indicated Mineral Resource for Port Gregory contributes to the overall resource base, but its historical nature means it does not represent new information in this quarterly report.
Positive factors
- Indicated category provides reasonable geological confidence.
- Good grade for garnet.
Negative factors
- Estimate is historical and unchanged since July 2023, reducing its novelty for this report.
Evidence · text
“Mineral Resource of 166 Mt at 4.0% Total Heavy Minerals (Measured 126 Mt at 3.8%, Indicated 20 Mt at 6.5%, Inferred 20 Mt at 2.9%) for 5.9 Mt of contained garnet, reported at a 2% THM cut-off. The estimate is unchanged from that last reported to ASX on 10 July 2023.”
Tags used in scoring
Indicated Resourcepositive
Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.
Why it applies: category is "indicated"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.3 years before this release
inferredPort Gregory Garnet Project · garnetTonnes: 20000000Grade: 2.9Grade Unit: % THMContained Metal: 5.9Contained Unit: mtHistorical resultNeeds review: historical_restatementView all detailsHide details
Identity
- Project
- Port Gregory Garnet Project
- Commodity
- garnet
- Ticker
- HVY
Resource scope
- Estimate type
- resource
- Reporting standards
- jorc
- QP Signed
- Yes
- Qualified person names
- Greg Jones
- Resource group id
- resource:16c9ffe42e70d6fe53c3
Resource Data
- Category
- inferred
- Tonnes
- 20000000
- Grade
- 2.9
- Grade Unit
- % THM
- Contained Metal
- 5.9
- Contained Unit
- mt
- Cutoff Grade
- 2
- Cutoff Unit
- % THM
Prior Estimate
- Resource Date
- 2023-07-10
Review
- Needs Review
- Yes
- Review Reason
- historical_restatement
- Historical
- Yes
- Historical Source Date
- 2023-07-10T00:00:00.000Z
Dates
- Event date
- 2026-10-29T00:00:00.000Z
Reasoning: The Inferred Mineral Resource for Port Gregory is speculative and its historical nature means it does not represent new information in this quarterly report.
Negative factors
- Inferred category has lower geological confidence.
- Estimate is historical and unchanged since July 2023, reducing its novelty for this report.
Evidence · text
“Mineral Resource of 166 Mt at 4.0% Total Heavy Minerals (Measured 126 Mt at 3.8%, Indicated 20 Mt at 6.5%, Inferred 20 Mt at 2.9%) for 5.9 Mt of contained garnet, reported at a 2% THM cut-off. The estimate is unchanged from that last reported to ASX on 10 July 2023.”
Tags used in scoring
Inferred Resourcenegative
Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.
Why it applies: category is "inferred"
Cut-off Disclosedpositive
Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.
Why it applies: cutoff_grade is stated
QP/CP Signedpositive
Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.
Why it applies: qp_signed is true
JORC Compliantpositive
Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.
Why it applies: reporting_standards includes jorc
PFS-Supportingneutral
Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.
Why it applies: the release names the study this estimate supports
DFS-Supportingneutral
Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.
Why it applies: the release names the study this estimate supports
Stale Estimatenegative
Effective date is >2 years old — data currency concern, may not reflect current geological understanding.
Why it applies: effective date is 3.3 years before this release
How Atlas produces this analysis
Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.