HVY: Quarterly Activities/Appendix 5B Cash Flow Report

Original announcement by asx on

Company
Heavy Minerals Limited
Ticker
HVY
Exchange
ASX
Region
Unavailable
Primary commodity
Unavailable
Secondary commodities
None reported
Document categories
Other, Capital raise, Resource update
Extracted
2026-10-29 22:45:44 UTC

Analysis by Minestarters Atlas

Atlas analysis published:

Minestarters Atlas analysis

Summary

Heavy Minerals Limited reported on its September 2026 quarter activities, highlighting the delivery of a maiden Ore Reserve and Pre-Feasibility Study for the Port Gregory Garnet Project, which outlines a 24-year mine life and a post-tax NPV of A$322.8 million. The company continued Front End Loading Stage 3 engineering study work at Kanmantoo and progressed project funding discussions, closing the quarter with A$39,000 in cash and an estimated 2.2 quarters of funding available. The Port Gregory Mineral Resource remains unchanged from July 2023.

Reasoning: The company delivered key project milestones (Ore Reserve, PFS) for Port Gregory, which are positive for project de-risking and future development. However, the low cash balance and limited funding runway, despite ongoing funding discussions, present a near-term challenge. The Port Gregory Mineral Resource is historical, reducing its novelty.

Positive factors

  • Maiden Ore Reserve and Pre-Feasibility Study delivered for Port Gregory, outlining a significant mine life and positive economics.
  • Continued progress on engineering studies for the Kanmantoo project.
  • Ongoing discussions for project funding and product qualification.

Negative factors

  • Low cash balance at quarter end (A$39,000).
  • Estimated quarters of funding available is low (2.2 quarters based on Appendix 5B calculation).
  • Mineral Resource estimate for Port Gregory is historical and unchanged since July 2023.

Facts used in scoring: 8

Atlas analysis — Heavy Minerals Limited: HVY: Quarterly Activities/Appendix 5B Cash Flow Report. probable 85500000 tonnes

Classification and evidence

Probable Reservepositive · Story-specific tag

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: The document reports a 'Maiden Ore Reserve (Probable)' for the Port Gregory Garnet Project.

Evidence · text

“Maiden Ore Reserve (Probable) 85.5 Mt at 4.43% THM for 3.3 Mt of contained garnet”

QP/CP Signedpositive · Story-specific tag

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: Mr Adrian Jones is explicitly named as the Competent Person for the Port Gregory Ore Reserve estimate.

Evidence · text

“Mr Adrian Jones... is the Competent Person for the Port Gregory Ore Reserve estimate”

JORC Compliantpositive · Story-specific tag

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: The Port Gregory Ore Reserve estimate is defined in the JORC Code (2012).

Evidence · text

“as defined in the JORC Code (2012)”

Measured Resourcepositive · Story-specific tag

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: The Port Gregory Mineral Resource includes a 'Measured' category of 126 Mt at 3.8% THM.

Evidence · text

“Measured 126 Mt at 3.8%”

Indicated Resourcepositive · Story-specific tag

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: The Port Gregory Mineral Resource includes an 'Indicated' category of 20 Mt at 6.5% THM.

Evidence · text

“Indicated 20 Mt at 6.5%”

Inferred Resourcenegative · Story-specific tag

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: The Port Gregory Mineral Resource includes an 'Inferred' category of 20 Mt at 2.9% THM.

Evidence · text

“Inferred 20 Mt at 2.9%”

Historical Estimate Onlynegative · Story-specific tag

Estimate pre-dates or does not comply with current JORC/NI 43-101 standards — requires verification drilling.

Why it applies: The Port Gregory Mineral Resource estimate is explicitly stated as 'unchanged from that last reported to ASX on 10 July 2023'.

Evidence · text

“The estimate is unchanged from that last reported to ASX on 10 July 2023.”

Stale Estimatenegative · Story-specific tag

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: The effective date of the Port Gregory Mineral Resource is 10 July 2023, which is over 2 years old relative to the report date of October 2026.

Evidence · text

“The estimate is unchanged from that last reported to ASX on 10 July 2023.”

Cut-off Disclosedpositive · Story-specific tag

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: The Port Gregory Mineral Resource is reported 'at a 2% THM cut-off'.

Evidence · text

“reported at a 2% THM cut-off”

PFS-Supportingneutral · Story-specific tag

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: The document details the results of a Pre-Feasibility Study (PFS) for the Port Gregory Garnet Project.

Evidence · text

“The Port Gregory Pre-Feasibility Study to the market”

Funding Discussionsneutral · Story-specific tag

No canonical definition is currently available.

Why it applies: The company states that 'Project funding discussions continued' and 'Discussions remain preliminary and non-binding'.

Evidence · text

“Project funding discussions continued across bonds, debt, royalties and prepay structures.”

ATM Facilityneutral · Story-specific tag

No canonical definition is currently available.

Why it applies: The company reports on its 'Acuity Capital ATM facility' and its usage.

Evidence · text

“Continued access to previously announced facilities. A$1,728,000 remained unused under the Acuity Capital ATM facility at quarter end.”

Low Cash Balancenegative · Story-specific tag

No canonical definition is currently available.

Why it applies: The company closed the quarter with only 'A$39,000 in cash'.

Evidence · text

“The Company closed the quarter with A$39,000 in cash.”

Going Concern Risknegative · Story-specific tag

No canonical definition is currently available.

Why it applies: The estimated quarters of funding available is 2.2, which is below the 2-quarter threshold for heightened concern, and the company addresses this in section 8.8.

Evidence · table

“2.2”

Context: 8.7 Estimated quarters of funding available (item 8.6 divided by item 8.3)

Extracted facts

Stored fact records: 4. Some facts used in scoring do not have a stored record.

Resource Estimates (4)

probablePort Gregory Garnet Project · garnetTonnes: 85500000Grade: 4.43Grade Unit: % THMContained Metal: 3.3Contained Unit: mtView all details
Link to this fact

Identity

Project
Port Gregory Garnet Project
Commodity
garnet
Ticker
HVY

Resource scope

Estimate type
reserve
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Adrian Jones
Resource group id
resource:548737248094278bd15d
Mining method
open_pit

Resource Data

Category
probable
Tonnes
85500000
Grade
4.43
Grade Unit
% THM
Contained Metal
3.3
Contained Unit
mt

Prior Estimate

Resource Date
2026-07-08

Review

Needs Review
No
Historical
No

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The maiden Probable Ore Reserve for Port Gregory is a significant de-risking milestone, providing a strong foundation for project development and funding discussions. The contained garnet and grade are substantial.

Positive factors

  • Maiden Ore Reserve establishes economic viability for the project.
  • Probable category indicates high confidence for mine planning.
  • Significant contained garnet tonnage (3.3 Mt).

Evidence · text

“Maiden Ore Reserve (Probable) 85.5 Mt at 4.43% THM for 3.3 Mt of contained garnet”

Tags used in scoring

Probable Reservepositive

Indicated Resource with demonstrated economic viability after applying modifying factors.

Why it applies: category is "probable"

Cut-off Undisclosednegative

High-grade interval reported without stating the cut-off grade used for compositing.

Why it applies: no cutoff_grade was stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

measuredPort Gregory Garnet Project · garnetTonnes: 126000000Grade: 3.8Grade Unit: % THMContained Metal: 5.9Contained Unit: mtHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Port Gregory Garnet Project
Commodity
garnet
Ticker
HVY

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Greg Jones
Resource group id
resource:dd62070cfe1b93c05bd3

Resource Data

Category
measured
Tonnes
126000000
Grade
3.8
Grade Unit
% THM
Contained Metal
5.9
Contained Unit
mt
Cutoff Grade
2
Cutoff Unit
% THM

Prior Estimate

Resource Date
2023-07-10

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-07-10T00:00:00.000Z

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Measured Mineral Resource for Port Gregory provides a strong base for the project, but its historical nature means it does not represent new information in this quarterly report.

Positive factors

  • Measured category indicates high geological confidence.
  • Significant tonnage and grade for garnet.

Negative factors

  • Estimate is historical and unchanged since July 2023, reducing its novelty for this report.

Evidence · text

“Mineral Resource of 166 Mt at 4.0% Total Heavy Minerals (Measured 126 Mt at 3.8%, Indicated 20 Mt at 6.5%, Inferred 20 Mt at 2.9%) for 5.9 Mt of contained garnet, reported at a 2% THM cut-off. The estimate is unchanged from that last reported to ASX on 10 July 2023.”

Tags used in scoring

Measured Resourcepositive

Highest confidence category — tonnage, grade, shape well-established from closely-spaced drilling. Basis for Proven Reserves.

Why it applies: category is "measured"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.3 years before this release

indicatedPort Gregory Garnet Project · garnetTonnes: 20000000Grade: 6.5Grade Unit: % THMContained Metal: 5.9Contained Unit: mtHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Port Gregory Garnet Project
Commodity
garnet
Ticker
HVY

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Greg Jones
Resource group id
resource:0aae078f8755350b9eaf

Resource Data

Category
indicated
Tonnes
20000000
Grade
6.5
Grade Unit
% THM
Contained Metal
5.9
Contained Unit
mt
Cutoff Grade
2
Cutoff Unit
% THM

Prior Estimate

Resource Date
2023-07-10

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-07-10T00:00:00.000Z

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Indicated Mineral Resource for Port Gregory contributes to the overall resource base, but its historical nature means it does not represent new information in this quarterly report.

Positive factors

  • Indicated category provides reasonable geological confidence.
  • Good grade for garnet.

Negative factors

  • Estimate is historical and unchanged since July 2023, reducing its novelty for this report.

Evidence · text

“Mineral Resource of 166 Mt at 4.0% Total Heavy Minerals (Measured 126 Mt at 3.8%, Indicated 20 Mt at 6.5%, Inferred 20 Mt at 2.9%) for 5.9 Mt of contained garnet, reported at a 2% THM cut-off. The estimate is unchanged from that last reported to ASX on 10 July 2023.”

Tags used in scoring

Indicated Resourcepositive

Reasonable geological confidence based on adequate drilling; continuity can be assumed. Basis for Probable Reserves.

Why it applies: category is "indicated"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.3 years before this release

inferredPort Gregory Garnet Project · garnetTonnes: 20000000Grade: 2.9Grade Unit: % THMContained Metal: 5.9Contained Unit: mtHistorical resultNeeds review: historical_restatementView all details
Link to this fact

Identity

Project
Port Gregory Garnet Project
Commodity
garnet
Ticker
HVY

Resource scope

Estimate type
resource
Reporting standards
jorc
QP Signed
Yes
Qualified person names
Greg Jones
Resource group id
resource:16c9ffe42e70d6fe53c3

Resource Data

Category
inferred
Tonnes
20000000
Grade
2.9
Grade Unit
% THM
Contained Metal
5.9
Contained Unit
mt
Cutoff Grade
2
Cutoff Unit
% THM

Prior Estimate

Resource Date
2023-07-10

Review

Needs Review
Yes
Review Reason
historical_restatement
Historical
Yes
Historical Source Date
2023-07-10T00:00:00.000Z

Dates

Event date
2026-10-29T00:00:00.000Z

Reasoning: The Inferred Mineral Resource for Port Gregory is speculative and its historical nature means it does not represent new information in this quarterly report.

Negative factors

  • Inferred category has lower geological confidence.
  • Estimate is historical and unchanged since July 2023, reducing its novelty for this report.

Evidence · text

“Mineral Resource of 166 Mt at 4.0% Total Heavy Minerals (Measured 126 Mt at 3.8%, Indicated 20 Mt at 6.5%, Inferred 20 Mt at 2.9%) for 5.9 Mt of contained garnet, reported at a 2% THM cut-off. The estimate is unchanged from that last reported to ASX on 10 July 2023.”

Tags used in scoring

Inferred Resourcenegative

Speculative category — limited drilling, geological continuity assumed but not confirmed. Cannot support economic studies alone.

Why it applies: category is "inferred"

Cut-off Disclosedpositive

Cut-off grade used for resource reporting is clearly stated, enabling like-for-like comparison.

Why it applies: cutoff_grade is stated

QP/CP Signedpositive

Qualified Person (QP) or Competent Person (CP) named and signed off — a member of a recognized professional association (e.g., AusIMM, SME, AIG, P.Geo) with relevant experience.

Why it applies: qp_signed is true

JORC Compliantpositive

Resource estimate prepared in compliance with JORC Code (Australia) — high reporting standard.

Why it applies: reporting_standards includes jorc

PFS-Supportingneutral

Resource estimate prepared to support a Pre-Feasibility Study — requires adequate M&I component.

Why it applies: the release names the study this estimate supports

DFS-Supportingneutral

Resource estimate prepared to support a Definitive Feasibility Study — requires high M&I confidence.

Why it applies: the release names the study this estimate supports

Stale Estimatenegative

Effective date is >2 years old — data currency concern, may not reflect current geological understanding.

Why it applies: effective date is 3.3 years before this release

How Atlas produces this analysis

Minestarters Atlas uses automated extraction to summarize mining announcements, identify reported measurements, and classify supporting evidence. Sentiment reflects the extracted narrative and classification rules; it is an interpretation, not a reported measurement. Evidence quotes and context are provided where available. Missing data, low-confidence results, and review flags indicate limitations. Check the original publisher announcement before relying on an interpretation.